The blackballing of conservative commencement speakers.

The blackballing of conservative commencement speakers.

For the 2013 and 2014 commencement seasons, I looked up the guest commencement speaker at the top 30 universities and the top 30 liberal arts colleges as rated by U.S. News and World Report. In cases where there was no guest commencement speaker, I took the guest baccalaureate, class day or senior day speaker. In all cases, I noted if the speakers were American political figures, and if so their party affiliations. I counted people like the news anchor Chris Matthews, who worked for Democratic politicians, as a political figure. I didn’t count people like the author Toni Morrison, who is a Democrat but has never worked in a political office. I also only counted lead speakers, not recipients of honorary degrees.

As it turns out, I couldn’t find a single clearly aligned Republican political figure who spoke at any of these schools in the past two years. … Twenty-five Democrats spoke. Eleven Democrats gave the main commencement address among the top 30 universities, including House Minority Leader Nancy Pelosi and former Mississippi governor and current Secretary of the Navy Ray Mabus. At the top 30 liberal arts schools, it was 14 Democrats.

The article describes this disparity as the “disappearance” of conservative speakers, but I think it is a much more conscience effort to squelch and silence the opinions of conservatives. Conservatives are literally being blackballed out of the intellectual marketplace, and are expected to accept this silencing quietly and without protest.

4 comments

Elon Musk and another watchdog group suggested on Friday that there was a quid pro quo in the awarding ULA its bulk buy military launch contract.

Elon Musk and another watchdog group suggested on Friday that there was a quid pro quo in the awarding ULA its bulk buy military launch contract.

Musk, citing an article by the Washington-based National Legal and Policy Center, suggested Thursday night on Twitter that the Pentagon inspector general should investigate the actions of former Air Force civilian Roger “Scott” Correll. Earlier this year, Correll retired from his post as the Air Force’s program executive officer for space launch, where he wielded enormous influence in awarding a multibillion-dollar contract for 36 rocket launches over the next several years, shooting sensitive national security equipment into space.

The contract went to a company called United Launch Alliance, a joint venture of the nation’s two biggest weapons contractors — Chicago-based Boeing and Bethesda, Md.-based Lockheed Martin Corp. Earlier this month, Correll took a job as vice president of government acquisition and policy with Aerojet Rocketdyne, the company that supplies the rocket engines used by United Launch Alliance.

Correll’s hiring certainly illustrates the “old boys” network in operation here. Whether there was direct corruption is not clear. Nonetheless, the bulk buy contract is not in the interests of the taxpayer or the Air Force, at least not at the prices announced.

7 comments

NASA reveals that the second flight of SLS in 20210 might not be manned.

Pigs in space: NASA reveals that the second flight of SLS in 20210 might not be manned.

This project officially started in 2010, which means this second flight will come more than a decade later. They will have spent more than $20 billion by that time, not counting the money spent on Orion. They will have also spent billions developing one engine for the upper stage, only to shelve it to develop another which they will need to test. Hence, the possibility that the second flight will be unmanned. NASA has also admitted that the third flight of SLS won’t come until 2024 at the earliest.

What kind of crap is this? This isn’t a space program or a project to explore the solar system. It is pure pork, a boondoggle designed to spend as much taxpayer dollars as possible for as long as possible. It is time to shut it down.

5 comments

A citizen’s group is offering a one million dollar bounty to “anyone who can provide ‘smoking gun’ evidence” that implicates either the IRS leadership or members of the Obama administration as ordering the harassment of conservatives.

Pushback: A citizen’s group is offering a one million dollar bounty to anyone who can provide ‘smoking gun’ evidence’ that implicates either the IRS leadership or members of the Obama administration as ordering the harassment of conservatives.

1 comment

The consequences if Russia carries out its threat to shut down the U.S. science GPS stations in Russia will be relatively minimal according to scientists.

The consequences if Russia carries out its threat to shut down the U.S. science GPS stations in Russia will be relatively minimal according to scientists.

Only if the stations, which are essentially nothing more that GPS geological data-loggers, are removed permanently or shut down for a long period will the consequences to geological research become more damaging. The article also points out the stupidity of the American government in this dispute. Its refusal to allow similar Russian GPS geological research data-loggers in the states makes no sense.

1 comment

In order to lower costs, Lockheed Martin wants to get more American parts into the European-built service module for the Orion capsule.

In order to lower costs, Lockheed Martin wants to get more American parts into the European-built service module for the Orion capsule.

And why do they want to lower costs? It ain’t for the normal free market reasons you’d expect. Instead, the Frankenstein project that is SLS/Orion has the U.S. building the capsule while Europe builds the service module. However, Europe doesn’t want to spend the money to build two service modules. Instead,

for financial reasons, ESA prime contractor Airbus Defense and Space may provide only “one and a half” service modules, Larry Price, Lockheed’s Orion deputy program manager, said in an interview here.

“They may not complete both of them, depending on funding,” Price said. But “we think we can drive Europe’s cost down so they can deliver two complete service modules” by steering the European company toward American suppliers already working on the Orion crew module. “If we use common parts, they can be lower price,” Price said. He added that ESA is set to deliver a full service module for the 2017 flight.

Read the article. It better than anything I can say will make it clear how much of a dead end project SLS/Orion really is. The rocket costs more than $14 billion per launch, has no clear mission, and the contractor (Europe) for the capsule’s service module only intends to build one and a half. What will NASA do after that? No one has any idea, nor does anyone at NASA have any plans to figure this out.

3 comments

The battle between France and Germany on how to replace the Ariane 5 rocket continues.

The battle between France and Germany on how to replace the Ariane 5 rocket continues.

To save money and lower cost, France wants to build a rocket that mostly uses solid rocket motors. Germany however has a problem with this.

German government officials have said they will have difficulty supporting the current Ariane 6 design, which features four identical solid-fueled stages — two as strap-on boosters, and two as the vehicle’s first and second stages — topped by the cryogenic upper stage powered by the same restartable Vinci engine that is the main element of the proposed Ariane 5 upgrade. Germany, through its space agency, the German Aerospace Center, DLR, has said it would prefer a liquid-fueled first stage for Ariane 6 as such a stage could be built in Germany and thus assure a large German industrial role in the program. Without such a role, DLR has said, German support for Ariane 6 might not be forthcoming.

The story above says that France is willing to negotiate with Germany over this, but if they do, they guarantee that Ariane 6 will be a costly rocket to build, making it very unattractive to satellite customers.

2 comments

The University of South Carolina is closing its Women & Gender Studies department and replacing it with a program to teach the Declaration of Independence, the Constitution, and the Federalist Papers.

Pigs fly! The University of South Carolina is closing its Women & Gender Studies department and replacing it with a program to teach the Declaration of Independence, the Constitution, and the Federalist Papers.

It appears university administrators have decided that they don’t have the option to ignore a state law that requires them to teach these fundamental American documents, as they tried to do earlier What is especially interesting is their decision on what to shutter to pay for the new courses. I suspect they had enough of porno on campus.

7 comments

A GAO report says that NASA has been hiding the true and very expensive cost of the SLS/Orion projects by specifically excluding the cost of any actual missions that go anywhere.

It is nothing but pork: A GAO report says that NASA has been hiding the true and very expensive cost of the SLS/Orion projects by specifically excluding the cost of any actual missions that go anywhere.

NASA so far has put only two SLS missions on the manifest: a late-2017 test launch of an unmanned Orion into lunar space followed by a repeat of the mission in 2021 with crew onboard. NASA officials told GAO auditors it expects to have spent at least $22 billion on SLS and Orion through 2021, an estimate that does not include the cost of building the SLS launcher for the second mission. … Moreover, NASA provided no cost estimate for the more powerful SLS rocket NASA would need to mount a crewed Mars expedition the Obama administration envisions happening in the 2030s. According to NASA’s early plans, such a mission would entail multiple SLS-Orion launches.

The cost estimates NASA has offered so far “provide no information about the longer-term, life cycle costs of developing, manufacturing, and operating the launch vehicle, crew capsule, and ground systems” the agency has identified as crucial to the eventual Mars mission, the GAO wrote in its report.

In other words, they are going to spend $22 billion to launch the thing once. Meanwhile, NASA’s commercial manned space effort is producing three different spacecraft for about $3 billion total. If anyone in Congress had any brains, picking between these two programs would be easy, a no-brainer. Sadly, they have no brains, and really aren’t making their budgetary decisions with the needs of the nation in mind.

6 comments

Two VA patients committed suicide after their treatments were delayed against the wishes of their psychiatrist.

Finding out what’s in it: Two VA patients committed suicide after their treatments were delayed against the wishes of their psychiatrist.

Dr. Margaret Moxness, who says she was employed at the Huntington VA Medical Center in Charleston, W.Va., from 2008 to 2010, told “Fox & Friends” on Monday that she was told to delay treatment even after she told supervisors they needed immediate care. She said at least two patients committed suicide while waiting for treatment between appointments.

Though the story is specifically about the widening scandal involving the Veterans Administration, it also tells us exactly what to expect from Obamacare in the coming years: bureaucracy, bad patient care, long wait times, and corruption by management. This is what one should expect from any monopolistic government-run program that doesn’t have to deal with competition on the open market.

1 comment

The assembly of Boeing’s CST-100 manned spacecraft is expected to begin soon.

The competition heats up: The assembly of Boeing’s CST-100 manned spacecraft is expected to begin soon.

Boeing takes over the OPF-3 lease in late June 2014 following an official handover ceremony from Space Florida. Assembly begins soon thereafter. … “The pieces are coming one by one from all over the country,” Ferguson explained. “Parts from our vendors are already starting to show up for our test article. “Assembly of the test article in Florida starts soon.”

Granted, Boeing’s lease for its assembly space at Kennedy has not yet started, but the vagueness of the assembly start date is a bit curious, and suggests that Boeing won’t begin assembly until they know they have won the contract from NASA, the announcement of which is presently scheduled for late summer 2014.

2 comments

The Air Force has hired the Aerospace Corporation to evaluate how long it will take to replace the Russian engine used by the Atlas 5 rocket.

Government dithering: The Air Force has hired the Aerospace Corporation to evaluate how long it will take to replace the Russian engine used by the Atlas 5 rocket.

“I see numbers all over the map,” [Ray Johnson, vice president at Aerospace] said May 14 during the World Space Risk Forum here. “Some people say they could do it in five years. Others estimate it’s going to be longer than that, and that it could be eight.” Aerospace Corp. work evaluating what it would take to develop a hydrocarbon engine to replace the RD-180 — if U.S.-Russia relations sour to the point where the engine is no longer available or wanted — “is literally just a few weeks old,” Johnson said.

Time is critical on this issue. It seems to me a better thing to do would be to immediately issue of Request for Proposals, which would quickly tell the Air Force what the American aerospace industry has to offer. They could then proceed right to construction, rather than studying the issue endlessly beforehand.

Moreover, why isn’t Lockheed Martin doing something about this? It is their rocket that is dependent on the Russians. Why is it the Air Force’s responsibility to save them?

3 comments
1 442 443 444 445 446 592