NASA’s safety panel rubberstamps May 27 manned Dragon launch

NASA’s safety panel has apparently reluctantly given its “okay” for the launch of the first manned Dragon launch on May 27th.

NASA’s Aerospace Safety Advisory Panel (ASAP), meeting by teleconference April 23, said it was unable to talk with NASA’s commercial crew program during its quarterly meeting, which was held virtually because of the coronavirus pandemic. The panel’s chair, Patricia Sanders, said that scheduling issues prevented a meeting, but that her committee planned to hold a “part 2” of their quarterly meeting in early May to discuss commercial crew and other topics not taken up this week.

Sanders said the panel has been kept up to date by NASA about commercial crew activities, including plans for SpaceX’s Demo-2 crewed test flight scheduled for May 27. “We are aware of a few technical items that remain to be more fully understood,” she said, “but the path forward appears feasible.”

In other words, it appears that NASA’s management might have taken advantage of the Wuhan panic to cut the panel off from the decision-making process, possibly because this panel has acted now for years to slow progress and in fact discourage any American manned launches at all, out of an almost irrational fear of any failure.

Their recommendations have sometimes verged on the ludicrous, such as an insistence that no manned launch be scheduled until a lot of paperwork was filled out.

It could also be that the panel has recognized at last (or maybe NASA management told them in no uncertain words) that we now have to proceed with American manned missions, since with the expiration of our contract with the Russians we have no other options.

2 comments

First manned Dragon flight scheduled for May 27th

Capitalism in space: NASA today officially announced May 27, 2020 as the scheduled launch date for the first manned Dragon flight to ISS, the first time American astronauts will fly from American soil on an American rocket in an American spacecraft since the shuttle was retired almost a decade ago.

The launch is set for 4:32 pm (Eastern), and I am sure will be live streams by both NASA and SpaceX.

5 comments

Space radiation may increase risk of cancer

Using mice and models, scientists have concluded that humans who spend long periods in space, exposed to its radiation, will have a 3% higher risk for cancer.

A team led by researchers at Colorado State University and Frederick National Laboratory for Cancer Research, which is part of the National Institutes for Health, used a novel approach to test assumptions in a model used by NASA to predict these health risks. Based on the NASA model, the team found that astronauts will have more than a three percent risk of dying of cancer from the radiation exposures they will receive on a Mars mission. That level of risk exceeds what is considered acceptable. [emphasis mine]

And how did they come to this conclusion?

…For the study, Weil and first author Dr. Elijah Edmondson, a veterinary pathologist and researcher based at the Frederick National Laboratory for Cancer Research in Maryland, used a unique stock of genetically diverse mice, mimicking a human population. Mice were divided into three groups with the first group receiving no radiation exposure and the other two receiving varying levels of exposure.

Edmondson, who conducted the research while completing a veterinary residency in pathology at CSU, said that for this type of research project, genetic variability is crucial. “Humans are very genetically diverse,” he explained. “You want to model that when it’s appropriate and feasible to do so.”

Weil said although the research team saw different tumor types, similar to humans, but the heavy ions did not cause any unique types of cancer. They also saw differences by sex. In humans, women are more susceptible to radiation-induced cancers than men; one of the main reasons is that women live longer, allowing sufficient time for cancer to develop. In assessing the cancer risk between male and female mice in the study, scientists said the findings parallel human data.

Edmondson said the study validates the NASA model to measure cancer risks for humans from space radiation.

In a sense, this study is junk. First, it discovers the obvious (radiation increases your chances of getting cancer). Second, it is too model-dependent, so assigning any precise percentage to that increase in humans is absurd, especially when based on a sample comprised of mice.

Third, and most important, it completely forgets the reality that life is risk, exploration is dangerous, and to do great things you need to take greater chances. That NASA concludes these questionable numbers are unacceptable means that NASA will never send humans anywhere beyond Earth orbit. Ever.

9 comments

Intuitive Machines reveals details of lunar landing mission

Capitalism in space: Intuitive Machines (IM), one of a handful of private companies that NASA has awarded contracts to build lunar landers of the agency’s science instruments, yesterday revealed the landing site and launch date of its first mission to the Moon.

IM will launch the Nova-C lander in October 2021 on a SpaceX Falcon 9 rocket. The target landing site is Vallis Schröteri (Schröter’s Valley) in the Moon’s Oceanus Procellarum (Ocean of Storms). The company said the site is “flat, free of craters and rocks, and has abundant sunlight” throughout the 14-day mission.

Five NASA payloads and others from commercial customers will be aboard, but IM did not specify what they are. Nova-C can take 100 kilograms to the lunar surface and provide 200 watts of power. Nova-C is based on NASA’s Project M lunar lander and Project Morpheus, which were designed, developed and tested by Johnson Space Center to demonstrate planetary landing technologies. The core team that developed Morpheus left government and founded IM.

Because the lander belongs to Intuitive Machines, not NASA, they have the right to sell their spare payload space to others, increasing their profits above what NASA will pay them. This shifts control of the mission from NASA to the private company, and in the long run will encourage the development of a private unmanned lunar landing industry.

Nor is IM alone in this. NASA has purchased landers from Astrobotics and Masten, with Astrobotics aiming for a 2021 landing and Masten in 2022. Both also have spare payload space, and are offering this to others.

I expect at a minimum some universities will make a deal. Rather than have their students build an orbiting cubesat for training and education, now they can have them build a science instrument that will land on the Moon.

0 comments

First manned Dragon mission slips to end of May

Capitalism in space: According to NASA administrator Jim Bridenstine, the first manned flight of SpaceX’s Dragon capsule will now occur at the end of May, not mid-May, and will last two or three months.

“I think we’re really good shape,” Bridenstine said in an interview Thursday. “I’m fairly confident that we can launch at the end of May. If we do slip, it’ll probably be into June. It won’t be much.”

The article at the link also reveals that the two astronauts will spend between two to three months on board ISS, not two weeks as originally planned.

0 comments

Boeing’s fall from grace at NASA

Eric Berger at Ars Technica yesterday uncovered a NASA report that outlined its selection process for awarding a contract for providing cargo to the agency’s proposed Lunar Gateway space station — eventually won by SpaceX — that gave Boeing’s proposal a terrible ranking.

Of the four contenders, [Boeing] had the lowest overall technical and mission suitability scores. In addition, Boeing’s proposal was characterized as “inaccurate” and possessing no “significant strengths.” Boeing also was cited with a “significant weakness” in its proposal for pushing back on providing its software source code.

Due to its high price and ill-suited proposal for the lunar cargo contract, NASA didn’t even consider the proposal among the final bidders. In his assessment late last year, NASA’s acting chief of human spaceflight, Ken Bowersox, wrote, “Since Boeing’s proposal was the highest priced and the lowest rated under the Mission Suitability factor, while additionally providing a conditional fixed price, I have decided to eliminate Boeing from further award consideration.” [emphasis mine]

The highlighted words could possibly be a death sentence for Boeing. The company has numerous other serious problems, including its commercial 737-Max airplane, its KC-46 Pegasus tanker for the Air Force, and of course its SLS rocket for NASA. For NASA to say that it will no longer consider Boeing in future contract bidding, especially since NASA has been one of Boeing’s biggest customers for decades, cannot be good for the company’s already badly suffering bottom line.

Berger also notes how much NASA’s attitude toward Boeing has changed since the agency removed Bill Gerstenmaier as head of its manned space operations. Gerstenmaier had apparently given Boeing the highest marks routinely, and appeared to have lost his ability to look at the company objectively. Moreover, his (and NASA’s) kid-glove treatment of Boeing for decades probably contributed to that company’s sloppy bid on the Lunar Gateway cargo contract. They were likely not used to tough questioning, and didn’t put the proper effort into writing their bid.

For the taxpayer and the American space effort, however, this report is wonderful news. It appears that NASA is breaking its tight and blind partnership with the big space contractors that has for decades handicapped the nation’s ability to get things built in space. These contractors have not been able to deliver, but because of their powerful allies on Congress, NASA has for years kowtowed to them in contract awards.

Now however it appears NASA’s management has become quite willing to reject these powerful companies, despite Congressional backing, in order to get the best deal and the best product, for the nation.

13 comments

Masten’s lunar lander wins NASA contract

Capitalism in space: Masten’s XL-1 lunar lander has won a NASA contract to bring a suite of science instruments to the Moon’s south polar regions, the launch targeted for December 2022.

The company also hopes to sell payload space on the lander to other customers.

Masten won a task order for NASA’s Commercial Lunar Payload Services (CLPS) program valued at $75.9 million. Masten will deliver nine science and technology demonstration payloads to the lunar surface near the south pole by December 2022 on the company’s XL-1 lander.

The CLPS payloads, with a mass of about 80 kilograms, will serve as the initial, anchor customer for that mission, Sean Mahoney, chief executive of Masten, said in an interview. He said there are “hundreds” of kilograms of additional payload space available on the lander, and that the company is working to line up additional customers.

Masten is now the third private company with an active contract with NASA to land science payloads on the Moon. Astrobotic and Intuitive Machines are the others, with their missions targeting 2021 for launch.

0 comments

NASA selects full crew for first operational Dragon mission

Even though SpaceX’s first demonstration manned mission to ISS has not yet occurred, NASA yesterday announced the selection of the full four person crew for the second flight, set for later this year and intended as the first operational mission to ISS, lasting six months.

This announcement tells us several things, all good. First, it appears NASA has now definitely decided that the demo mission, presently scheduled for mid-May, will be a short-term mission. They had considered making it a six-month mission, but it now appears they have concluded doing so will delay the demo launch too much.

Second, that NASA is solidifying its plans for that operational flight, the second for Dragon, including a tentative launch date later in 2020, is further evidence that they intend to go through with the demo mission in mid-May.

Finally, it appears that NASA has decided that it will not buy more seats on Russian Soyuz capsules, something that they had previously hinted they needed to do because the agency was worried the American capsules would not be ready this year. The article describes the negotiations on-going with the Russians about the use of Dragon, as well as the future use by Americans of Soyuz. NASA wishes to have astronauts from both countries fly on both spacecraft (Starliner too, once operational), but Russia is as yet reluctant to fly its astronauts on Dragon. They want to see that spacecraft complete more missions successfully.

Regardless, future flights of Americans on Soyuz will cost NASA nothing, as the agency wishes to trade the seats on the U.S. capsules one-for-one for the seats on Soyuz. It also means that NASA has decided it doesn’t need to buy Soyuz flights anymore, as it now expects Dragon to become operational this year.

3 comments

NASA awards SpaceX deal to provide cargo to Gateway

Capitalism in space: Should NASA ever decide to build its proposed Gateway space station in orbit around the Moon (the odds of which have gone down recently), it announced today that it has signed a deal with SpaceX to use its Falcon Heavy rocket and an upgraded larger version of its Dragon capsule to ship cargo to that station.

The deal calls for at least two missions, and is SpaceX’s first deal in NASA’s Artemis program.

This deal is a major blow to SLS and Boeing, which up to now had a monopoly on all launches to supply and launch Gateway. In fact, Gateway was invented by Lockheed Martin, Boeing, and NASA (not Congress) in order to justify SLS’s existence. That NASA has now decided it is better off using the much cheaper and already operational Falcon Heavy for some Gateway missions suggests that SLS is increasingly vulnerable to cancellation. NASA is making it obvious that other commercial options exist. No need to wait years and spend billions for SLS, when they can go now, for much less.

8 comments

Dragon parachute test aborted

Because of the failure of the equipment unrelated to the parachutes, the helicopter pilot for a drop test of SpaceX’s crew Dragon parachutes on March 24, 2020 was forced to release the dummy capsule early, causing its loss.

“During a planned parachute drop test today, the test article suspended underneath the helicopter became unstable,” SpaceX said Tuesday in an emailed statement. “Out of an abundance of caution and to keep the helicopter crew safe, the pilot pulled the emergency release,” the statement added. “As the helicopter was not yet at target conditions, the test article was not armed, and as such, the parachute system did not initiate the parachute deployment sequence. While the test article was lost, this was not a failure of the parachute system, and most importantly, no one was injured. NASA and SpaceX are working together to determine the testing plan going forward in advance of Crew Dragon’s second demonstration mission.”

This issue, combined with the loss of a Falcon 9 first stage (on its fifth flight) during re-entry, because one engine failed to function properly, is making some news sources suggest that NASA will delay the planned May launch of Dragon’s first manned mission to ISS.

If NASA demands a delay of that May manned mission because of these two issues, it will demonstrate how truly insane our society has become. While the issue prevented the drop test, it involved the equipment that suspended the dummy capsule below the helicopter, not the parachute system. Furthermore, this test was one of the very last tests of the parachute system, following a test campaign during the past few months that has worked repeatedly on numerous tests.

As for the first stage loss, do I have to repeat again that it occurred on the stage’s fifth reuse, and after it had successfully launched its payload into orbit? SpaceX will be using a new first stage for the manned mission, and they have experienced no failures on a new first stage like this for literally years.

In a sane society, NASA would look at the overall context, and put aside these issues as irrelevant to their launch schedule. They, and SpaceX, will want to figure out what happened, but they should insist on proceeding on schedule for the May launch.

We are no longer sane however. I will not be surprised if they announce a further launch delay.

1 comment

NASA to use private enterprise for space communications

Capitalism in space: NASA is now in the process of shifting from building its own communications satellites to communicate with ISS as well as many other Earth-orbiting NASA satellites to buying those services from the private sector, much as the agency has done with is cargo and crew ferrying service to the station.

This involves ground stations as well as upgrading its fleet of geosynchronous NASA-built TDRS satellites.

In addition, NASA is seeking industry assistance in replacing the Space Network, which provides communications for more than 40 missions including the International Space Station through government-owned Tracking and Data Relay Satellites (TDRS) and associated ground stations. “While the TDRS System is a fine investment that the government has made, for the future we are looking at commercial alternatives,” said Ted Sobchak, NASA Space Network project manager.

NASA plans a multistep campaign to encourage development of commercial space-based relay networks before the current TDRS spacecraft reach the end of their lives. “Based on past spacecraft performance, the newest generation of TDRS will remain operational well into the 2030s,” Younes said.

The original TDRS constellation of satellites, launched from 1983 to 1995, were actually built for a reasonable cost. At the time NASA did not try to put every bell and whistle on them, but focused instead on their basic mission and getting it launched for a reasonable cost. The management at NASA today almost certainly could not do this. Getting new satellites from competitive private companies will therefore save NASA money, and get the job done faster.

0 comments

Webb telescope further delayed by COVID-19

As part of its decision to shut down most of the agency’s operations due to fear of the COVID-19 virus, NASA’s has suspended all work on the James Webb Telescope, further delaying this much delayed space telescope.

The follow-on to the popular Hubble Space Telescope [Ed: a NASA lie that is not true], years late and billions over budget, it was on track for launch in March 2021, though some NASA officials were hinting there might be another delay. Today’s action almost certainly assures it. “The James Webb Space Telescope team … is suspending integration and testing operations. Decisions could be adjusted as the situation continues to unfold over the weekend and into next week. The decision was made to ensure the safety of the workforce. The observatory remains safe in its cleanroom environment.” — NASA

I must repeat this incessantly, as it appears too many modern space reporters are very ignorant about their own field. Webb is not a” follow-on to Hubble.” Astronomers made the decision in the late 1990s to build an infrared space telescope instead, which is what Webb is. For more than a decade they, and NASA, lied to the public about this, claiming Webb was a better version of Hubble, in order to garner support for building Webb.

I have been calling NASA on lie this since 2008, when I wrote The Universe in a Mirror, which I think eventually forced the agency to stop doing it. It is shameful however for a reporter now, in 2020, to still spread it.

As for Webb, this decision by NASA will certainly delay it again. The project is already fourteen years behind schedule, with its budget ballooning from $500 million to about $10 billion. All told, a perfect example of government in action.

5 comments
1 84 85 86 87 88 192