The evidence continues to pile up: The government’s strongarm policies against COVID were utter failures

The modern basis of medical research in the dark age
Health policy during the Wuhan panic

Since my last COVID update in June, the number of research papers has continued to show, with increasing force, the total and utter failure of every single one of the draconian edicts imposed on the pubic by leftist governments both in Democratic Party controlled states in the U.S. as well as worldwide.

Below are a small sampling of this accumulating research. Read it and weep.

My sorrow however comes from knowing that this knowledge was patently obvious from day one. This new research really isn’t new, it confirms what was well known, and was confirmed quickly as early as March 2020. However, when skeptics like myself, mostly on the right, desperately tried to stem the panic, it was all to no avail. The government’s edicts were always wrong, but no one wanted to listen. The data below merely confirms what all the data, before and during the Wuhan panic, was already telling us.
» Read more

17 comments

South Korea’s Danuri lunar orbiter successfully makes course correction

On September 2nd engineers for South Korea’s Danuri lunar orbiter successfully completed a major course correction, firing its engines to adjust its path towards the Moon.

The science ministry announced Sept. 4 that the maneuver was so successful that the Korea Aerospace Research Institute (KARI), which controls the spacecraft called Danuri, has decided to skip an additional correction maneuver planned for Sept. 16.

It will reach lunar orbit on December 16th, then make five more orbital adjustments before reaching its science orbit in January. While the spacecraft has instruments from both South Korea and the U.S. for studying the lunar surface, its main goal is to teach South Korea engineers and scientists how to do this.

1 comment

Inouye Solar Telescope begins science operations

The National Science Foundation yesterday announced the inauguration of science operations of the Daniel K. Inouye Solar Telescope in Hawaii.

The sample first images provided at the link are excellent, but rather than show this telescope’s abilities, they instead illustrate the absurdity of spending millions to build a ground-based telescope. None compare with the spectacular high resolution solar images being produced today from the myriad of solar telescopes in space.

Moreover, the history of this telescope tells us much about the bankrupt nature of all modern government projects:

Over 25 years ago, the NSF invested in creating a world-leading, ground-based solar observatory to confront the most pressing questions in solar physics and space weather events that impact Earth. This vision, executed by the Association of Universities for Research in Astronomy (AURA) through the NSF’s National Solar Observatory (NSO), was realized during the formal inauguration of the Inouye Solar Telescope. [emphasis mine]

It took our modern incompetent federal government a quarter century to build this single telescope. Compare that with the construction of the solar telescopes it is replacing. They were conceived, designed, and built in much less than a decade back in the early 1960s. And cost less too.

The press release at the link also spends a lot of space touting “diversity” and “Native Hawaiian” cultural needs, which really have nothing to do with the study of the Sun. That focus tells us how misguided our government has become, and how it is using its coercive power to drag us all along down that foolish path towards hell.

2 comments

China launches two satellites with its Kuaizhou-1A rocket

China today successfully placed what it labeled as “two test satellites” into orbit using its smallsat Kuaizhou-1A rocket.

No information at all was released about both satellites.

The leaders in the 2022 launch race:

40 SpaceX
35 China
11 Russia
6 Rocket Lab
5 ULA

American private enterprise now leads China 55 to 35 in the national rankings, and the entire world combined 55 to 53.

0 comments

Today’s blacklisted American: Fire chief fired for attending a Christian-affiliated leadership conference

Christians banned from Stockton's government

They’re coming for you next: Ron Hittle, who had served as a firefighter in Stockton, California, for more than two decades and was for five years its fire chief, was fired in 2010 because he had had the nerve to attend a leadership conference that happened to be affiliated with the Christian religion.

More than a decade ago, the Deputy City Manager asked Chief Hittle to attend leadership training. Chief Hittle learned about the Willow Creek Global Leadership Summit from a business magazine, and he decided to attend because it was a renowned leadership seminar that featured a “pop up business school” with stellar speakers from various backgrounds including his own Christian worldview. Chief Hittle invited three of his staff members who shared his Christian faith to join him, and he put his attendance on the public city calendar so his supervisors would be aware. The firefighters paid for the two-day seminar with their own funds.

But the same supervisor who asked Chief Hittle to attend leadership training told him it was unacceptable that he attended a Christian-affiliated seminar.
» Read more

22 comments

September 5, 2022 Space quick links

All courtesy of BtB’s stringer Jay.

1 comment

India’s space agency successfully tests prototype for controlling descent of spent 1st stages

IAD by ISRO

India’s space agency ISRO on September 3, 2022 successfully used a suborbital sounding rocket to test a prototype of an inflatable airbag, which it dubs an Inflatable Aerodynamic Decelerator (IAD), that can inflate at the top of a 1st stage and slow and control its descent back to Earth after launch.

The graphic to the right was adapted from the mission brochure [pdf]. According to ISRO:

The IAD was initially folded and kept inside the payload bay of the rocket. At around 84 km altitude, the IAD was inflated and it descended through atmosphere with the payload part of sounding rocket. The pneumatic system for inflation was developed by LPSC. The IAD has systematically reduced the velocity of the payload through aerodynamic drag and followed the predicted trajectory. This is first time that an IAD is designed specifically for spent stage recovery. All the objectives of the mission were successfully demonstrated

ISRO claims this design can not only facilitate the reuse of first stages, it can also be used for science payloads to Mars and Venus.

I look at this and wonder, wouldn’t parachutes or parasails, already developed and used numerous times in similar applications, do the same job? In fact, Rocket Lab has already successfully used parachutes to control the re-entry of its Electron first stages. Meanwhile, SpaceX uses simple and lightweight grid fins to control the descent of its Falcon 9 first stages, and simply fires that stage’s engines twice to slow it down for landing.

While there may be engineer advantages to this airbag design, the whole thing smacks of many of NASA’S complex test programs that never made it past prototype tests. The ideas always looked good, but they never were practical or cost effective.

7 comments

Indian rocket startup raises $51 million in private investment capital

Capitalism in space: The Indian rocket startup Skyroot has just raised $51 million in private investment capital for the development of its smallsat rocket, Vikram-1.

Operating as a private aerospace manufacturer and commercial launch service provider in the country, the Hyderabad-headquartered startup has been working on its flagship Vikram series of small-life launch vehicles. The first among them, the Vikram 1, is slated to take to the skies by the end of the year and launch small satellites to space.

The $51 million is the most any private aerospace commercial company from India has ever raised in a single funding round.

Though the Modi government has publicly encouraged the development of a private, independent, commercial aerospace industry, India’s bureaucracy has generally acted to block this effort. In 2019 it convinced the government to create New Space India Limited (NSIL), a wholly government-owned entity which is designed to retain as much control over commercial market share as possible. As recently as one month ago, the NSIL webpage described itself as aiming to “capture” that commercial market. That revealed its purpose too obviously, so the website was rewritten to now say its goal is to “spur” the Indian aerospace sector.

Because NSIL gets government money and has full control over all of India’s already developed government rockets and space facilities, it has an enormous advantage, which acts to discourage investment in new private companies such as Skyroot. This is a similar situation that existed in the U.S. for more than a half century following Apollo. NASA had the resources, controlled all launches, and thus made private investment for independent companies hard to obtain.

This only changed when NASA began awarding contracts to private companies in 2008, whereby the rockets and spacecraft produced were not owned or designed by NASA. And NASA was only forced to do so because Elon Musk happened to have enough of his own money to finance SpaceX himself.

When ISRO (India’s agency) or NSIL begin awarding contracts like this, then company’s like Skyroot will begin to blossom.

4 comments

NASA to roll SLS back to assembly building, delaying launch by weeks at minimum

NASA managers today decided they will not attempt another launch of SLS during the present launch window that closes on September 6, 2022, and will bring the rocket back to assembly building for more detailed trouble-shooting.

Engineers not only need to solve the hydrogen fuel leak in a fuel line connection that caused today’s launch scrub, they will also have to replace the flight termination batteries needed in case the rocket has to be destroyed during liftoff because it is flying out of control. These batteries only have a few weeks life, and the launch delays this week caused them to reach their limit.

The next launch windows are either from September 19 to October 4, excluding September 29-30, or October 17 to October 31, excluding October 24, 25, 26, and 28.

At that point SLS’s two solid rocket strap-on boosters will have been stacked for about two years, one full year past what NASA once considered their safe lifespan. The agency has waived that rule for SLS, but waiving it for more than a full year might simply be too risky. If the boosters need to be replaced, that will delay the launch by at least another three months, at the minimum.

Right now the odds remain high this launch will not occur in 2022.

32 comments

China’s Long March 4C rocket launches military satellite

China today successfully used its Long March 4C rocket to place a military Earth observation satellite into orbit.

Launched from an interior spaceport, the rocket’s lower stages thus crashed uncontrolled in China.

The leaders in the 2022 launch race:

39 SpaceX
34 China
11 Russia
6 Rocket Lab
5 ULA

American private enterprise still leads China 54 to 34 in the national rankings, and the entire globe 54 to 52.

3 comments

OneWeb lost $229 million when Russia canceled its launches and confiscated its satellites

On September 1, 2022, OneWeb revealed that Russia’s cancellation of the last six or so OneWeb launches as well as Russia’s confiscation of 36 satellites cost the company $229 million.

Russia’s actions were the response by then head of Roscosmos, Dmitry Rogozin, to sanctions imposed on Russia by the west because of its invasion of the Ukraine. Rogozin’s petty response ended up shooting his space agency in the foot, because it ended up losing billions of dollars in foreign launch business, business that is not likely to return for decades.

OneWeb has since signed contracts with SpaceX, ISRO (India’s space agency), and Relativity for future launches. None of these have been firmly scheduled, though the first by SpaceX is tentatively planned for sometime before the end of the year.

11 comments

SLS test launch scrubbed again

NASA engineers once again were forced to scrub the launch of the SLS rocket today due to another hydrogen leak during fueling.

The launch director waived off today’s Artemis I launch attempt at approximately 11:17 a.m. EDT. Teams encountered a liquid hydrogen leak while loading the propellant into the core stage of the Space Launch System rocket. Multiple troubleshooting efforts to address the area of the leak by reseating a seal in the quick disconnect where liquid hydrogen is fed into the rocket did not fix the issue.

NASA has one more chance, on September 5th, to launch this rocket before it must return it to the assembly building to replace the flight termination batteries, used to abort the launch after liftoff should something go seriously wrong during flight. As I understand it, their use-by date is September 6th, and it would require a major safety waiver by the military range officer, who is entirely independent from NASA and under no obligation to it, to allow for a launch after that date with those batteries.

8 comments

Sunspot update: Solar activity continues to exceed sunspot predictions

It is the beginning of September and time to post another update on the Sun’s ongoing solar cycle. Below is NOAA’s monthly graph tracking the number of sunspots on the Sun’s Earth-facing hemisphere, with the activity in August now added. I have also added some additional details to the graph to give the numbers a larger context.

Though sunspot activity dropped in August it remained significantly above the predictions of the panel of government solar scientists put together by NOAA. The predicted sunspot number for August, as indicated by the red curve, was supposed to be about 48. The actual number was 75.

» Read more

4 comments

Chinese astronauts complete first spacewalk using new Wentian module

The new colonial movement: Chinese astronauts yesterday completed their first spacewalk using the airlock on the new Wentian module that was recently launched to that nation’s Tiangong-3 space station.

The spacewalk lasted six hours, and was mostly designed to test the airlock itself as well as do the first tests of Wentian’s own robot arm. It appears they also installed an “extended pump set”, whatever that is, and did other work near the hatch. More here.

4 comments

NASA is paying Boeing twice as much as SpaceX for its manned flights

Capitalism in space: in an excellent analysis of the total amount NASA will pay both SpaceX and Boeing for all their manned flights to ISS before the station retires, Eric Berger at Ars Technica has determined that the agency will essentially pay Boeing twice as much per flight.

In 2014, NASA narrowed the crew competition to just two companies, Boeing and SpaceX. At that time, the space agency awarded Boeing $4.2 billion in funding for development of the Starliner spacecraft and six operational crew flights. Later, in an award that NASA’s own inspector general described as “unnecessary,” NASA paid Boeing an additional $287.2 million. This brings Boeing’s total to $4.49 billion, although Finch told Ars that Boeing’s contract value as of August 1, 2022, is $4.39 billion.

For the same services, development of Crew Dragon and six operational missions, NASA paid SpaceX $2.6 billion. After its initial award, NASA has agreed to buy an additional eight flights from SpaceX—Crew-7, -8, -9, -10, -11, -12, -13, and -14—through the year 2030. This brings the total contract awarded to SpaceX to $4.93 billion.

Since we now know how many flights each company will be providing NASA through the lifetime of the International Space Station, and the full cost of those contracts, we can break down the price NASA is paying each company per seat by amortizing the development costs.

Boeing, in flying 24 astronauts, has a per-seat price of $183 million. SpaceX, in flying 56 astronauts during the same time frame, has a seat price of $88 million. Thus, NASA is paying Boeing 2.1 times the price per seat that it is paying SpaceX, inclusive of development costs incurred by NASA.

Despite the larger payments to Boeing, the company could very well lose money on Starliner. The higher cost to NASA from Boeing is due almost entirely because the agency was absorbing more of its initial development cost. SpaceX’s Dragon capsule had already been flying cargo missions to ISS when these manned contracts were awarded. SpaceX merely had to upgrade its manned capsule. Boeing had to design and build it from scratch. Moreover, the contracts were fixed price, which means Boeing had to absorb more than a half billion in additional costs when it had to refly the unmanned demo flight of Starliner.

Finally, because of the delays, Boeing won less NASA business. It also has gotten none of the private commercial manned flights that are going on right now. Those contracts went to SpaceX, including all the profits. Whether Boeing can eventually win some private contracts down the road is unknown. It will certainly have to lower its price to compete with SpaceX.

13 comments

Today’s blacklisted American: Google scholarship sets racist quotas favoring minorities

Google: dedicated to segregation!
Google: dedicated to the new segregation!

“Segregation today, segregation tomorrow, segregation forever!” Tech giant Google has established a discriminatory fellowship program that major universities can participate in that specifically favors some races while barring others.

The Google Ph.D. Fellowship, which gives promising computer scientists nearly $100,000, allows each participating university—a group that includes most elite schools—to nominate four Ph.D. students annually. “If a university chooses to nominate more than two students,” Google says, “the third and fourth nominees must self-identify as a woman, Black / African descent, Hispanic / Latino / Latinx, Indigenous, and/or a person with a disability.”

So no one misunderstands Google’s very specific discriminatory intent, here is the exact quote from its FAQ about the fellowship program:
» Read more

14 comments

NASA thinks engine issue on SLS launch caused by misreading sensor

NASA engineers have now concluded that the improper temperatures in one engine in SLS’s core stage that forced the August 29, 2022 launch to be scrubbed were caused by a faulty sensor, and that the actual temperatures in the engine were correct.

During a news conference on Tuesday evening, NASA’s program manager for the SLS rocket, John Honeycutt, said his engineering team believed the engine had actually cooled down from ambient temperature to near the required level but that it was not properly measured by a faulty temperature sensor. “The way the sensor is behaving does not line up with the physics of the situation,” Honeycutt said.

The problem for NASA is that the sensor cannot be easily replaced and would likely necessitate a rollback to the Vehicle Assembly Building at Kennedy Space Center in Florida, a few kilometers from the launch pad. This would delay the launch of the rocket at least into October, and the space agency is starting to get concerned about wear and tear on a rocket that has now been stacked for nearly a full year.

With this SLS rocket, NASA management is now trapped between a rock and a hard place. The rocket’s solid rocket boosters has been stacked for just short of two years, almost a full year beyond their use-by date. Moreover, there are batteries on the rocket that only function for about a month before they must be replaced. Their replacement date is September 6th, which means if NASA cannot get the rocket launched by that date it will have to return it to the assembly building, delaying the launch to at least October. If it has to replace the solid rocket boosters the launch will likely then be delayed until next year, which will seriously impact the second SLS launch, set to send astronauts around the Moon and back.

At the moment the launch is scheduled for a two hour launch window beginning at 2:17 pm (Eastern) on Saturday, September 3, 2022. The countdown will be live streamed here. At the moment the weather for Saturday has improved, with s 60% chance the launch can proceed.

10 comments

Axiom gets NASA approval to fly second commercial manned mission to ISS

Capitalism in space: NASA and Axiom have worked out their contract to allow Axiom to fly its second commercial manned mission to ISS, now scheduled for sometime in the spring of 2023.

Through the mission specific order, Axiom is obtaining from NASA services such as crew supplies, cargo delivery to space, storage, and other in-orbit resources for daily use. The order also accommodates up to an additional contingency week aboard the space station. This mission is subject to NASA’s updated pricing policy for private astronaut missions, which reflects the full value of services the agency is providing to Axiom that are above space station baseline capabilities.

The order also identifies capabilities NASA will obtain from Axiom, including the return of scientific samples that must be kept cold in transit back to Earth, the return of a Nitrogen/Oxygen Recharge System (NORS) tank, the capability for last-minute return of two cargo transfer bags, and up to 10 hours of the private astronaut mission commander’s time during the docked mission to complete NASA science or perform tasks for NASA.

The flight, dubbed Ax-2, will carry four Axiom passengers, three of whom will be paying passengers. It will be launched by SpaceX on its Falcon 9 rocket, carrying one of SpaceX’s four reusable manned Dragon capsules.

0 comments

NASA awards SpaceX new $1.4 billion contract to launch its astronauts

Capitalism in space: NASA yesterday awarded SpaceX a new $1.4 billion contract to buy five more passenger flights to ISS, using SpaceX’s Falcon 9 rocket and Dragon manned capsules.

This follows a similar contract extension in February that awarded SpaceX three more NASA passenger flights.

For Boeing, this contract award must hurt. If its Starliner manned capsule wasn’t years behind schedule, with numerous engineering errors slowing development, some of the cash from these two new SpaceX contracts would have certainly gone to Boeing. Instead, the company has had to spend more than $400 million of its own money trying to get Starliner fixed and operational.

0 comments
1 148 149 150 151 152 594