NASA safety panel reviews commercial crew, tries to justify its paperwork demands

Link here. The article describes the results from the quarterly meeting of NASA’s safety panel, which occurred last week, including its concerns about the recent test problems during a launch abort test of Boeing’s Starliner capsule. It also describes the panel’s general satisfaction at the status of SpaceX’s Dragon capsule.

The article however ends with a long screed by one panel member, explaining that the heavy paperwork requirements they are imposing on the two companies is not really paperwork.

“It needs to be noted by everyone, and we’re especially interested in making sure that all of the external stakeholders realize this, that while the concluding process of certification has sometimes been described as a paper process, that is really just a shorthand clarification and in reality it could not be further from the truth,” noted Dr. McErlean.

In reality, the process is as follows. “In a certified design, the design agent – the contractor or partner in this case – performs the design and in the certification plan, the design agent and the certification agency (NASA) agree on the submittal of certification evidence.

“This could be measurements, it can be test data, it can be analysis, but it almost always involves the submittal of detailed technical data, not simply paper descriptions or forms. Sometimes it involves witness testing and sometimes it involves physical inspection. But it almost always wraps around important technical submittals.

Can I translate? The safety panel requires a lot of testing so that a lot of paperwork can be filled out. And while much of this testing is likely to help make the capsule’s safer, most of it seems to me to be make-work, and designed to justify the existence of NASA and its safety panel.

3 comments

NASA rubberstamps Russian engines in Atlas 5 for manned flights

Surprise surprise! NASA has certified the Russian engines used in the Atlas 5 as safe for manned flights.

NASA had been claiming that, because it cannot observe every detail in how Russia builds the engines, it cannot certify them as safe for manned flight. This is, and has been, crap. The Atlas 5, with this engine, has been one of the most reliable rockets ever built.

In truth, what NASA’s bureaucracy was really doing was using these Russian engines as a wedge to slow down Boeing’s first manned flight, mainly because the commercial crew program is threatening NASA past monopoly on U.S. manned flight. Once privately built rockets and manned spacecraft fly, people are suddenly going to realize we don’t really need NASA.

2 comments

Changes to big August 3 commercial crew announcement do not bode well

On August 3 NASA is planning on making a big announcement concerning its commercial crew program. Yesterday the agency revealed that the NASA administrator, Jim Bridenstine, will reveal the names of the crew for the first commercial crew flight.

The changes in how that announcement will be made however suggest that they had hoped to make a bigger announcement and have been forced to back off. Initially, vice president Mike Pence was to have made the announcement. He has now canceled his participation. Also, there had previously been rumors that the announcement would have included the launch dates for both SpaceX’s and Boeing’s first flights. That the new press release makes no mention of dates suggests the dates have been delayed.

I hope I am wrong.

1 comment

Starliner has propellant leak during launch abort test

Capitalism in space: Boeing’s Starliner capsule experienced a propellant leak near the end of a launch abort test in late June.

The company said it conducted a hot-fire test of the launch-abort engines on an integrated service module at the White Sands Test Facility in New Mexico in June. The engines successfully ignited and ran for the full duration, but during engine shutdown an anomaly occurred that resulted in a propellant leak. “We have been conducting a thorough investigation with assistance from our NASA and industry partners,” the statement said. “We are confident we found the cause and are moving forward with corrective action.”

The capsule being tested is an engineering model, not one that is intended to fly. Boeing also has said that “they believe there is an operational fix to the problem rather than a need to significantly rework the Starliner spacecraft itself.”

This incident however is certain to delay Boeing’s crew launch schedule, especially considering NASA’s own timidity about the privately built space capsules. The agency will insist on a complete review, no matter how long it takes, even if the company has pinpointed the problem already and has instituted corrections.

In a normal world, this event should not effect SpaceX’s schedule. I also expect however that the agency will use this event to slow SpaceX down again, demanding further reviews there as well.

4 comments

GAO report indicates NASA forcing more delays in commercial crew

A Government Accountability Office report released today suggests that NASA’s complex certification requirements will cause further delays in first operational missions of the commercial crew capsules of Boeing and SpaceX.

The report shows when NASA believes Boeing and SpaceX will each have completed a single non-crewed test flight, a test flight with crew, and then undergo a certification process to become ready for operational flights. This is known as the “certification milestone.”

Based on NASA’s “schedule risk analysis” from April, the agency estimates that Boeing will reach this milestone sometime between May 1, 2019, and August 30, 2020. For SpaceX, the estimated range is August 1, 2019, and November 30, 2020. The analysis’ average certification date was December, 2019, for Boeing and January, 2020, for SpaceX.

These are obviously razor-thin margins, but the new report also indicates that Boeing is ahead in submitting paperwork needed for approval of its various flight systems and processes. This is consistent with what independent sources have told Ars, that Boeing is more familiar with NASA and better positioned to comply with its complex certification processes. [emphasis mine]

This does not surprise me. From the beginning of commercial crew there have been people at NASA working to slow SpaceX down so as to not embarrass Boeing as well as SLS/Orion. By using the “complex certification process,” which really has little to do with engineering and everything to do with bureaucracy and power politics, NASA has effectively succeeded in preventing SpaceX from getting off the ground. The company could have flown a manned Dragon at least a year ago, if NASA had not stood in the way and imposed numerous safety demands, some of which make no sense.

Meanwhile, NASA’s bureaucracy and certification process has created a situation where neither company might be ready to fly when the ticketed flights on Russian Soyuz capsules end. To solve this gap the agency is actually thinking of stretching out ISS missions so it doesn’t have to fly ferry missions as much. While longer missions to ISS make sense — if your goal is to learn how to get to Mars — this isn’t why NASA is thinking of doing it. Instead, it is doing it so that it can make private space, especially SpaceX, look bad.

All in all, NASA’s management seems entirely uninterested in real space exploration, and the risks it entails. Instead, they are focused on power politics and serving the needs of the big space contractors that they have worked with for decades, accomplishing little while spending a lot of taxpayer dollars.

3 comments

A NASA astronaut’s detailed look at Dragon and Starliner

Link here. Lots of interesting details about both spacecraft from an experienced astronaut’s perspective.

The Commercial Crew program will launch uncrewed ships first. SpaceX is aiming to do that in September and Boeing in October. If successful, crewed launches will follow on December 31 (Boeing) and January 17 (SpaceX).

“We’ve gotten into the cockpit in both spacecraft. We’ve run through parts of the profile, from launch to rendezvous docking, un-docking, and [atmospheric] entry. But everything’s not been tied up, not quite yet,” Williams said. She didn’t say which company’s spaceship is her favorite.

In fact, crewed launch dates may slip to mid-2019. Williams said she expects NASA to announce her official mission selection this summer, and from there about a year of more deliberate mission training will follow.

This is a delay from the previously planned summer launches. This had been expected, but it also looks like both companies are trying hard to get things off the ground this year.

0 comments

NASA expands first manned Starliner mission

NASA has modified its contract with Boeing to allow its first manned Starliner test mission to add an astronaut and extend the mission’s length so that it more resembles an operational flight to ISS.

NASA is considering adding a third crew member to the Starliner’s “Crew Flight Test” and could extend its trip to the International Space Station from two weeks up to six months, the length of a typical ISS expedition. The potential changes, outlined in a contract modification with Boeing, could help NASA maintain its presence on the International Space Station through 2019 and beyond.

NASA’s last purchased ride aboard a Russian Soyuz spacecraft, upon which the U.S. has relied for access to the ISS since the shuttle’s retirement in 2011, is scheduled to launch in the fall of 2019.
Boeing’s new Starliner spacesuit features lightweight fabric, slim gloves and sneaker-like boots. But Boeing’s Starliner and SpaceX’s Crew Dragon may not be certified to fly four-person crews until after that. “This contract modification provides NASA with additional schedule margin if needed,” said Bill Gerstenmaier, head of human spaceflight operations at NASA headquarters in Washington. “We appreciate Boeing’s willingness to evolve its flight to ensure we have continued access to space for our astronauts.”

Doing this makes some sense, but I wonder why NASA chose to do it with Boeing’s Starliner instead of SpaceX’s Dragon. Starliner has never flown in any form, while the manned Dragon is based on SpaceX’s well tested design.

I suspect NASA will soon modify its SpaceX contract as well. It makes sense. Once you put humans on board, you might as well give yourself the option to do a full mission.

14 comments

First commercial crew flights still set for 2018 with chance of delay

NASA’s manager of the commercial crew program provided an update to the agency’s advisory board on Monday, noting that both SpaceX and Boeing are making good progress to their scheduled first flights late this year.

The bottom line however is that there is a good chance the flights will slip into 2019, though based on the update it appears to me that the flights will not slip that much beyond that.

2 comments

Atlas 5 man-rated upgrades approved by NASA for Starliner launches

Capitalism in space: ULA announced this week that its Atlas 5 rocket has passed a NASA review that now approves the design changes necessary to allow that rocket to launch Boeing’s Starliner manned capsule.

“Design Certification Review is a significant milestone that completes the design phase of the program, paving the way to operations,” said Barb Egan, ULA Commercial Crew program manager. “Hardware and software final qualification tests are underway, as well as a major integrated test series, including structural loads. Future tests will involve launch vehicle hardware, such as jettison tests, acoustic tests, and, finally, a pad abort test in White Sands, New Mexico.”

Launch vehicle production is currently on track for an uncrewed August 2018 Orbital Flight Test (OFT).

The schedule to make that August flight happen still remains tight, but this approval brings it one step closer.

6 comments

First flights of commercial manned capsules in 2018

According to a NASA presentation last month, it appears that both SpaceX and Boeing are aiming to complete both their first unmanned and manned flights this coming year.

The schedules remain tight, but SpaceX plans to do its first unmanned demo mission in April, followed by a manned flight in August, while Boeing’s first unmanned flight is set for August, with the first manned flight in November. If these schedules happen 2018 should be quite an exciting year.

14 comments

Boeing’s Starliner undergoing drop tests

Capitalism in space: Boeing’s Starliner manned capsule yesterday successfully completed the 11th of 14 drop tests in preparation for launch.

The article includes extensive comments by two NASA astronauts who are working with Boeing on these drop tests. I found this quote interesting:

[Sunita] Williams and [Eric] Boe said there are benefits and drawbacks to either type of landing, but they preferred land over water. Williams speaks from experience: She has already made a land landing aboard a Russian Soyuz capsule. “When you land on land, maybe it’s a little bit harder,” Williams said. “But when you’re coming down at high speed, the water’s hard, too.

“Landing on water, if somebody’s right there to rescue you and they know exactly where you’re coming down, that works. And we’ve shown that works with the Apollo program. But, landing on water — I’m a Navy guy, there’s a big ocean out there and it’s a little space capsule and there’s some definite risks to that, too.

“Landing on the Soyuz, you open the hatch, you smell the grass, you’re not in a huge rush to get out or stay in. You know you’re in a solid place and you know you can take your time getting out and the rescue forces will be there eventually, if they’re not there knocking on the door.”

The article also noted that Boeing plans to refurbish each capsule and reuse it up to ten times.

0 comments

Boeing delays first manned Starliner flight

Capitalism in space: It appears that Boeing has pushed back the first manned flight of its Starliner capsule from August 2018 to early 2019.

In an interview at the conference, Ferguson said that the company’s current schedule calls for a pad abort test at White Sands Missile Range in New Mexico in the second quarter of 2018. That would be followed by an uncrewed orbital test flight of the vehicle, launched on an Atlas V, in the third quarter of 2018. “If the results of that are very favorable,” he said of the uncrewed flight test, “our crewed flight test is fourth quarter — perhaps, depending on the outcome, maybe the first quarter of the following year.”

This schedule appears to be an overall three to five month delay in their program.

0 comments
1 12 13 14 15 16