Schedule for commercial manned flights solidifies

Capitlism in space: It appears that the schedule for the first unmanned and manned test flights of the commercial capsules being built by SpaceX and Boeing is getting more certain.

The latest SpaceX schedule calls for an uncrewed test flight in February 2018, followed by a crewed test flight in June 2018. Boeing’s schedule anticipates an uncrewed test flight in June 2018 and a crewed test flight in August 2018.

While this sounds encouraging, the story contradicts a Boeing report last week that suggested their first manned flight would be delayed into the fourth quarter of 2018. Both stories however pin the first unmanned demo flight for June 2018, which now seems to be a firm date.

13 comments

First Starliner manned flight delayed to late 2018

Boeing has revealed that the first manned flight of its commercial Starliner capsule will likely be delayed a few more months to late 2018.

The latest confirmed schedules from NASA show the uncrewed mission, dubbed the Orbital Flight Test (OFT), slated for No Earlier Than June 2018, followed quickly in August 2018 by the crewed flight test.

However, comments made by Chris Ferguson last month at the Paris Air Show seem to indicate that the crewed flight test is moving from its August timeframe. According to Mr. Ferguson, Director of Crew and Mission Operations for Boeing’s Commercial Crew Program, the first Starliner crewed test flight is aiming for “last quarter of 2018” – which would be a shift of two to five months into the October to December 2018 timeframe.

The unmanned test flight, however, remains set for a June 18, 2018 launch.

37 comments

First test launches of commercial manned vehicles upcoming

The first unmanned test flights of the manned capsules being built by SpaceX and Boeing are moving forward and appear to be on schedule.

Currently, SpaceX is on track to be the first to perform their uncrewed flight, known as SpX Demo-1, with Dr. Donald McErlean reporting to the ASAP that the flight continues to target a launch later this year. Currently, both NASA and SpaceX hold that SpX Demo-1 will fly by the end of the year – though L2 level KSC scheduling claims the mission has potentially slipped to March 2018.

Regardless, SpX Demo-1 will be followed – under the current plan – by Boeing’s uncrewed OFT (Orbital Flight Test) in mid-2018.

The article is worth a careful read, as it describes in detail the political and bureaucratic maneuverings that are taking place to get the NASA bureaucracy to accept the work being done by these two private companies. Make sure especially that you read the section about NASA’s desire that the vehicles meet an imaginary safety standard where they will only lose a crew once every 270 flights. The NASA bureaucracy has claimed for the last few years that neither spacecraft is meeting this requirement, but according to this article it appears they are finally also admitting that the requirement has really little basis in reality.

According to the ASAP [Aerospace Safety Advisory Panel] meeting minutes, Dr. McErlean said that “While these LOC [Loss of Crew] numbers were known to be challenging, and both providers have been working toward meeting the challenge, it is conceivable that in both cases the number may not be met.”

However, Dr. McErlean cautioned the ASAP and NASA about rushing to judgement on the current and whatever the final LOC number for each vehicle is. “The ASAP is on record agreeing with the Program that one must be judicious in how one applies these statistical estimates. In the case of LOC, the numbers themselves depend very heavily on the orbital debris model used to develop the risk to the system [as] orbital debris is a driving factor in determining the potential for LOC. The orbital debris models have been used and validated to some degree, but they are not perfect. One must be wary of being too pernicious in the application of a specific number and must look at whether the providers have expended the necessary efforts and engineering activity to make the systems as safe as they can and still perform the mission.”

To that last point, Dr. McErlean reported that both providers indeed “expended the necessary efforts and engineering activity to make the systems as safe as they can.” Importantly, too, Dr. McErlean noted that there was no evidence that spending more money on closing the LOC gap for both providers “could [make] their systems considerably safer.”

The ASAP at large concurred with this finding and noted their pleasure at the progress made in closing the LOC gap for both Dragon and Starliner. [emphasis mine]

In other words, NASA’s safety panel is eventually going to sign off, no matter what. Note also that the GAO’s earlier complaints about Boeing’s parachute testing program have now apparently vanished.

5 comments

Parachute tests for Boeing Starliner

Boeing’s Starliner spacecraft has successfully completed a parachute test at New Mexico’s Spaceport America.

Uniquely, this test wasn’t conducted via the use of a helicopter of an aircraft – as seen with other vehicles, such as the Orion spacecraft. Boeing was not able to fit the Starliner test article into the hold of a C-130 or C-17 aircraft, so they instead used a 1.3-million-cubic-foot balloon, which is able to lift the capsule to its intended altitude.

The test went well, with Starliner released from the balloon, deploying two drogue parachutes at 28,000 feet to stabilize the spacecraft, then its pilot parachutes at 12,000 feet. The main parachutes followed at 8,000 feet above the ground prior to the jettison of the spacecraft’s base heat shield at 4,500 feet. Finally, the spacecraft successfully touched down.

The article once again makes note of NASA’s fake concern over the Atlas 5 rocket. The concern isn’t that the rocket isn’t reliable. The concern is that Boeing hasn’t yet gotten NASA’s certification that it is reliable. In other words, because NASA hasn’t signed a piece of paper stating the obvious fact that the Atlas 5 is safe, Boeing’s Starliner cannot be considered safe.

0 comments

Killing both commercial space and American astronauts

This all reeks of politics: A new Government Accountability Office (GAO) report released yesterday says that NASA it should not permit Boeing and SpaceX to fly humans on their capsules and rockets until they fix certain issues and test both repeatedly on unmanned flights before the first manned flights to ISS.

This GAO report was mandated by Congress, and it requires NASA to certify that both Boeing and SpaceX have met NASA’s requirements before allowing those first manned flights. While the technical issues outlined in the report — to which NASA concurs — might be of concern, my overall impression in reading the report, combined with yesterday’s announcement by NASA that they are seriously considering flying humans on SLS’s first test flight, is that this process is actually designed to put obstacles in front of Boeing and SpaceX so as to slow their progress and allow SLS to launch first with humans aboard.

For example, the report lists three main problems with the commercial manned effort. First there is the Russian engine on the Atlas 5. From the report itself [pdf]:
» Read more

10 comments

Boeing unveils its spacesuit for Starliner missions

The competition heats up: Boeing today unveiled the streamlined but snazzy spacesuit it plans to use on its Starliner manned ferry flights to and from ISS.

This tidbit though I think illustrates the new mindset, to make things simpler and cheaper and more focused on their actual purpose.

Boeing’s suit, designed with the Massachusetts-based David Clark Co., weighs about 12 pounds, compared to 30 pounds for NASA’s orange suits formally called the Advanced Crew Escape Suit, or ACES. …The “get us home suit,” as Ferguson called it, couldn’t be used for a spacewalk. It’s intended to provide air and cooling to keep astronauts safe during launch and landings back on land, and during emergencies, like if a micrometeoroid strike caused a loss of cabin pressure.

5 comments

No more manned Soyuz purchased by NASA after 2019

The competition heats up: Both Boeing and SpaceX better get their manned capsules working by 2019, because NASA at this point has no plans to buy more seats on Russian Soyuz capsules after the present contract runs out.

Even as the commercial crew schedules move later into 2018, NASA officials say they are not considering extending the contract with Roscosmos — the Russian space agency — for more launches in 2019. The last Soyuz launch seats reserved for U.S. astronauts are at the end of 2018.

It takes more than two years to procure components and assemble new Soyuz capsules, so Russia needed to receive new Soyuz orders from NASA by some time this fall to ensure the spacecraft would be ready for liftoff in early 2019.

The second paragraph above notes that even if NASA decided it needed more Soyuz launches, it is probably too late to buy them and have them available by 2019.

3 comments

Boeing pushes back first Starliner flights

Boeing has delayed the first test flight of its Starliner manned capsule from the end of 2017 until June 2018.

Boeing says that production delays and problems with qualification tests are partly to blame for the timeline slip. The company also found a production flaw in September that forced them to get rid of a main element on one of their spacecrafts — a dome that made up the pressure shell of the crew module. All of these complications combined prompted Boeing to push back the development timeline of Starliner by about six months.

0 comments

Budget constraints and technical challenges delay commercial crew

A NASA inspector general report released today cites both budget constraints imposed by Congress as well as technical challenges that will delay the first commercial manned mission to ISS until 2018.

When the commercial crew program began, NASA hoped to have routine flights by 2015, but that slipped in large part due to congressional underfunding in the early years. OIG noted today that its 2013 report found that adequate funding was the major challenge for the program. Congress has warmed up to the program, however, and now is approving the full President’s request so funding is not the issue it once was. Technical challenges now are the major hurdle according to today’s report.

The companies’ systems must be certified by NASA before beginning routine flights to ISS. Boeing anticipates receiving certification in January 2018 with its first certified flight in spring 2018, and SpaceX is working toward late 2017 for its first certified mission, the OIG report says. But it is skeptical: “Notwithstanding the contractors’ optimism, based on the information we gathered during our audit, we believe it unlikely that either Boeing or SpaceX will achieve certified, crewed flight to the ISS until late 2018.”

The report has been written prior to yesterday’s Falcon 9 launchpad failure, which will certainly impact the schedule negatively.

Essentially, the report claims that the program was delayed initially by about two to three years because of the refusal of Congress to fund it fully. The delays to come will be instead because of the technical challenges. While I tend to agree with this assessment, I also note that government reports like this are often designed to generate more funds for the agencies involved, not find a better way to do things. If we are not diligent and hard-nosed about how we fund this program I worry that with time commercial crew will become corrupted by the government’s sloppy and inefficient way of doing things, and become as bloated as Orion and SLS. This is one of the reasons I never complained when Congress short funded the program previously, as it forced the companies involved to keep their costs down.

0 comments

Starliner and Orion drop tests

The competition heats up: NASA and Boeing have begun drop tests on land and water respectively of their Orion and Starliner manned capsules.

Both sets of tests are taking place at Langley. With Orion they are dropping the mockup in water to test how it will respond to a variety of circumstances. With Starliner they have finished the water drop tests and have begun drop tests on land.

7 comments

Design problems for Starliner

In the heat of competition: Boeing is working to correct two serious design problems that cropped up during the construction of its Starliner manned capsule.

First the thing was weighing too much:

One issue involved the mass of the crew capsule, which outgrew the lift capability of the United Launch Alliance Atlas 5 rocket selected to put it into orbit. The CST-100 Starliner will ride an Atlas 5 rocket with two solid rocket boosters and a dual-engine Centaur upper stage, and although Boeing and ULA engineers considered adding a third strap-on motor to compensate for the capsule’s extra weight, managers now have the spacecraft back under its mass allowance, Ferguson said.

Second, the capsule has a shape problem:

Ferguson said Boeing has a model of the Atlas 5 rocket and CST-100 Starliner in a wind tunnel to verify a change to capsule’s outer shape devised to overcome higher-than-expected aerodynamic launch loads discovered in testing. “They had one issue, a non-linear aerodynamic loads issue, where they were getting some high acoustic loads right behind the spacecraft,” said Phil McAlister, head of NASA’s commercial spaceflight development office in Washington.

Something here is rotten. It seems to me that Boeing shouldn’t be having these very basic problems right off the bat. In the past, under the older cost-plus contracts NASA used to routinely hand out, these kinds of problems would simply have meant that Boeing would have gotten more money from NASA, This time, however the contract is fixed-price. If Boeing has problems or delays, the company will have to bear the cost, not NASA. I suspect these problems might have occurred because of some cultural laziness at Boeing. Their management is used to not having to eat the cost of these kinds of mistakes. Now, they will. I expect the culture to therefore begin changing.

5 comments
1 13 14 15 16