Airbus begins assembly Orion service module

My heart be still! Airbus has announced that it is beginning assembly of the first Orion capsule service module.

Considering the cost to build about three Orion flight capsules, about $25 billion, one would think that would be enough to also build the capsule’s service module, especially since this is not cutting edge technology, having already been done with Apollo.

Not however when you are dealing with pork-laden government operations, where the customer, the taxpayer, is a good mark that you can suck for as much money as possible without any bad consequences. Make it sound cool and they will buy it, hook, line, and sinker!

SpaceX, Lockheed Martin, and Mars

Two stories this week illustrate the difference between lobbying the government to get anything accomplished, and doing it yourself with the goal of making money from it from private customers.

In the first case SpaceX is planning to fly a Dragon capsule to Mars, using its Falcon Heavy rocket, and do it by 2018. It would not be manned, but would do the initial engineering testing for later manned missions, using larger interplanetary spacecraft. SpaceX is not asking the government to help pay for it. They are only making sure they have dotted all the legal “I”s required. The goal is to build spacecraft that can take anyone to Mars who is willing to pay for the flight.

In the second case Lockheed Martin is proposing a big government program to put six astronauts in orbit around Mars, in 2028. They haven’t really built anything yet to do this, they merely are lobbying the federal government to pay for it.

Which do you think is more likely to happen? Anyone who reads Behind the Black knows that I choose SpaceX. For 40 years I have seen many different variations of Lockheed Martin’s proposal, all of which came to nothing. They are powerpoint proposals, not real engineering, designed to wow Congress and NASA and get funding for the company. Nothing will ever be built, since the actual construction is so far into the future and so untested that it is impossible to predict what will really happen.

SpaceX however is planning a real mission, which is being designed to lay the groundwork for later more complex attempts. Rather than propose something big for far in the future, they are building something reasonable and doable now. Moreover, they aren’t lobbying the government, they are advertising their skills to the entire world, with the goal of convincing everyone to buy their very real product.

UPDATE: I should add a link here to Orbital ATK’s proposal in Congressional hearings on Monday to use their Cygnus capsule to build a cislunar space station by 2020. Like Lockheed Martin, they are lobbying Congress to build a mostly powerpoint concept. Why don’t they instead make an investment of their own money, like SpaceX, to send some Cygnus capsules to lunar space and demonstrate the concept, while also learning what needs to be done? I would have greater faith in the reality of their concept if they did that.

Leaving Belize tomorrow

After a week of intense and amazing caving, I will be leaving Belize tomorrow. I will not get home until Saturday, however, as my flight ends in El Paso at about 11 pm. I will drive home on Saturday.

I intend to post several essays about my trip, one describing the caving and why it is happening, one describing the ruins and my impressions (with photos), and maybe a third with my overall thoughts about the experience. Since I have a lot of other work that needs to be done, some with deadlines, it might take a few days to pump all this out. Stay tuned.

TMT permitting process about to begin anew

The retired Hawaiian judge who will supervise the new permitting process for the Thirty Meter Telescope held a prelminary meeting on Monday to discuss scheduling and procedual matters.

The Hawaiian authorities have been slow-walking this new permiting process, which the telescope already completed according to law years ago. I say TMT should just leave Hawaii so its citizens can enjoy their barren mountain and the lack of jobs and wealth it will bring them.

On the radio from Belize

I will be doing my Tuesday night podcast on John Batchelor, live Tuesday at 11:00 pm Eastern. We did a test phone call tonight and confirmed that the connection is good. I expect I will talk a bit about what I am doing here in Belize, as well as some of the space stuff going on the last few days and posted on Behind the Black.

I will also post the podcast link once John Batchelor gets it uploaded.

Status of the third recovered Falcon 9 first stage

The recovered first stage from SpaceX’s last Falcon 9 launch experienced significant wear and tear during its high speed descent and landing.

They do not think they will be able to use the stage again, but will instead test it to determine the engineering tolerances that need to be met to make recovery and reuse in these situations more likely. The data will also help them increae the likelihood of reusability on launches that are less stressful.

Posted from Belize.

Two days in Mountain Cow Cave

Still alive! We spent Saturday and Sunday surveying in Mountain Cow Cave, located on the Hummingbird Highway in a national park. Quite amazingly beautiful. Gigantic rooms filled with big towers and formations everywhere. The size makes surveying and sketching the rooms challenging, as I am sometimes staning in plsces far from any walls. To sketch a cave passage it helps to be able to see the walls.

No pictures, for the moment, as it is hard to upload large files here.

We go to a different cave tomorrow (Monday) while on Tuesday we will take a day off to go sightseeing at the Tikal ruins in Guatamala.

One more thing: there is a chance I will still do my Tuesday appearance with John Batchelor. If we find the phone connection acceptable, I will go on live at 11 pm eastern. I will know for sure by tomorrow night.

Congress demands Air Force spend less and more at the same time

A House budget report has cut the Air Force launch budget while simultaneously requiring the Air Force to favor more expensive launch companies.

In addition to cutting the funding available for new launch contracts, House appropriators also want the Air Force to consider “the best value to the government” in evaluating bids.

ULA has been pushing for the best-value approach since it sat out last fall’s GPS-3 launch competition saying it couldn’t win a price shootout against SpaceX, which will launch the satellite which was awarded an $82.7 million contract last month for a May 2018 launch of a GPS-3 satellite. That contract was awarded as part of a best value source selection. “We do not yet feel we are in a position to win price-only competitions with our competitor,” Tory Bruno, ULA president and chief executive, said in a March interview with SpaceNews. “We believe we have better performance, reliability and schedule certainty.” Those traits would carry greater weight in a best-value competition.

Only our precious Congress. On one hand they cut the budget for launches because they think the Air Force is wasting money On the other they demand that the Air Force spend extra millions on launch contracts so that the company they favor, ULA, gets the work. One would almost think they do not have the nation’s interests in mind..

In Belize

After two flights and a two hour drive I am now with the rest of the expedition in the Maya Mountain Lodge near San Ignacio on the western side of Belize. Tomorrow we go on our first survey trip to Mountain Cow Cave, a popular wild cave that tours periodically visit. We are surveying it for the local authorities so they have a better idea of what they have and can better protect it.

My internet connection here is slow, so posting will be less than I would like. Also, we will be spending most of our time caving. So don’t expect a lot of posting for the next week. I shouldn’t say that, as then all my readers will flee, but I have to be honest.

Off to Belize

This Friday morning I am leaving for Belize for a week long cave expedition. I do not know if I will have the time or internet access to post as normal. Moreover, the days will be spent underground surveying and pushing new cave passages, so if I do any posting it will be in the evenings. In addition, some of us will also be heading to Guatemala for a day to visit the ruins at Tikal.

I have never been to Belize before. If I can’t post there I will definitely post my impressions of my travels upon my return.

Posted from El Paso, Texas.

Republican-led Senate passes spending bill larger than requested by Obama

Feeding the anger: A bill passed today by the Republican-led Senate included more funding that originally requested by the Obama administration.

Moving legislation and avoiding fights has been a top election year priority for Majority Leader Mitch McConnell. The Kentucky Republican wants the GOP Senate to prove that Republicans can govern by avoiding a one-and-done omnibus spending package at the end of the year. But the energy and water bill received little fanfare from Senate conservatives. They complain that the measure, which funds the U.S. Army Corps of Engineers and the Department of Interior, spends $261 million more than even Obama requested.

Sen. Mike Lee described the legislation as “simply unacceptable in a time of rising debt and slower economic growth.” The Utah Republican told The Daily Signal that “we’re never going to get our nation’s rising deficits under control until we can stick to our previous agreements on spending levels,” referring to the limits set in the 2011 Budget Control Act.

Though Congress has not passed a budget resolution, the Senate started advancing spending bills at levels established in the 2015 Bipartisan Budget Act, which increased government discretionary spending by $30 billion above the 2011 caps.

Still Sen. James Lankford, R-Okla., told The Daily Signal he’s glad the appropriations process has gotten off the ground finally. “This is the first time this appropriation bill has passed the Senate since 2009,” Lankford, who sits on the Senate Appropriations Committee, explained. “To avoid last-minute continuing resolutions, backroom deals and omnibus bills, we must move bills through a regular order appropriations process.”

These guys just don’t get it. There is a reason that Trump and Cruz dominated their party’s presidential campaign, and it wasn’t because they were calling for Congress to advance big spending bills in Congress quickly.

Posted from El Paso, Texas.

Court rules against illegal Obamacare subsidies

Finding out what’s not in it: A federal court ruled today that the Obama administration had no legal right to issue subsidies to insurers that have not been appropriated by Congress.

The court was quite blunt about the White House’s illegal activities here:

Paying out Section 1402 reimbursements without an appropriation thus violates the Constitution. Congress authorized reduced cost sharing but did not appropriate monies for it, in the FY 2014 budget or since. Congress is the only source for such an appropriation, and no public money can be spent without one. See U.S. Constitution, Art. I, § 9, cl. 7 (“No Money shall be drawn from the Treasury, but in Consequence of Appropriations made by Law . . . .”). The Secretaries’ textual and contextual arguments fail.

Not surprisingly, the Obama administration rejects the court’s decision.

Airbus initiates smallsat launcher project

The competition heats up: Airbus has begun a project to develop a smallsat commercial launch rocket, competitive with Rocket Lab’s Electron and Virgin Galactic’s LaunchOne, aimed at the cubesat and nanosat satellite market.

The source for the story was unnamed, and also gave few details, so it is hard to know how real this is. What I gather however is that we might be seeing the beginnings of a long term split in the launch market, with one set of big rockets designed to launch human-related payloads, including humans, and a second set of small rockets focused on launching unmanned satellites.

ULA’s CEO explains why they are retiring Delta

Tory Bruno, the CEO of ULA, explained in an op-ed today why his company is discontinuing its use of Boeing’s Delta family of rockets and focusing exclusively on Lockheed Martin’s Atlas 5 and its eventual replacement, the Vulcan Centaur.

Delta is an amazing rocket, but it’s costly to produce. Its burnt-orange foam insulation has to be applied by hand. Its production line is bigger and more complex than Atlas’s. And its components are pricier.

Bruno’s purpose with this op-ed is to convince Congress to leave his company alone while they develop the new Vulcan rocket. Congress keeps proposing outlawing use of the Atlas 5 with its Russian engines, and Bruno does not want that, at least not until the Vulcan is flying. He is also trying to reduce his costs by discontinuing Delta, which in turn would allow him to lower prices for his Atlas 5 and compete more effectively with SpaceX.

Though I understand Congress’s concerns, I do find it sad that in modern America a private businessman has to lobby Congress for the right to run his company as he sees fit.

First manned Starliner flight delayed

Boeing has revealed that the first manned flight of Starliner will be delayed until 2018.

This delay for Boeing is not really a surprise. Unlike SpaceX, the company had done very little actual development work on the capsule before winning its contract from NASA. They therefore have a lot more to do to become flight worthy. My one worry is their contract. If the contract is fixed price, as with the original cargo contracts awarded SpaceX and Orbital ATK, Boeing will have no incentive to delay, as they won’t be paid anything until they achieve specific milestones and will get no additional monies to cover the added costs of the delay. If the contract is cost-plus, however, NASA’s traditional contract system used for SLS, Orion, and almost every other boondoggle since the 1960s, then Boeing will be paid regardless of the delay, and NASA will also be on the hook for paying the additional delay costs, thus giving Boeing an incentive to slow walk the construction.

I think the contract was fixed-price, but am not sure. Anyone out there have an answer?

1 2 3 4 5 6