The status of telescopes the NSF is getting rid of

Back in 2012 the National Science Foundation (NSF) proposed that it cease funding a slew of older, smaller telescopes in order to use that money to fund the construction and operation of newer more advanced facilities. This article, focused on the fate of the Arecibo Observatory in Puerto Rico, provides a nice table that shows the status of these telescopes.

The options were either to find new funding, be mothballed, or even demolished. It appears that most of the telescopes in question have found new funding and will remain in use in some manner. The one telescope that has apparently failed to obtain any additional funding from others is the McMath–Pierce Solar Telescope on Kitt Peak in Arizona, which when built in 1962 was the world’s largest solar telescope, an honor for which it is still tied.

In 2015 I had written an article for Sky & Telescope about how these budget cuts were effecting the telescopes on Kitt Peak. At that time the people in charge of McMath-Pierce were hunting for new support but were coming up short. Almost two years later it appears that their hunt has been a failure, and the telescope will likely be shut down, and possibly demolished.

It will be a sad thing if McMath-Pierce is lost, but I am not arguing to save it. If its observational capabilities were truly valuable and needed by the scientific community than someone would have come forward to finance it. That no one has suggests that the money really can be spent more usefully in other ways.

FAA okays SpaceX launch on Monday

As I expected, after several days of hemming and hawing, the FAA has granted SpaceX a launch license for its planned Monday launch.

The FAA license approved Friday covers all seven Falcon 9 launches planned for the Iridium Next constellation, along with landings of the Falcon 9 first stage on a barge positioned downrange in the Pacific Ocean. The $3 billion Iridium Next program aims to replace all of the company’s existing satellites, which were launched in the late 1990s and early 2000s and are now operating well beyond their design lives.

What SpaceX clearly did here was to move ahead, daring the FAA to challenge their desire to launch quickly. Government bureaucrats don’t like that, but to call SpaceX’s bluff and block the launch would have caused these bureaucrats even more problems. SpaceX knew this, and gambled that the FAA would back down. It did, and thus the launch license was issued.

India considers going to Jupiter and Venus

The competition heats up: India’s space agency ISRO is considering unmanned missions to both Jupiter and Venus, while also delaying their first manned test flight four years until 2024.

More significant, the second link had this quote:

Mr Somnath said during the current fiscal, Isro planned eight PSLV flights, up from six in 2016. “Our aim is to steadily increase the launches between 12 and 20 in phases with creation of necessary infrastructure.

Like everyone else, they are getting enough business to up their launch rate. 2017 is going to be an active year in the launch market.

Arianespace wins two contracts, aims for a dozen launches in 2017

The competition heats up: Arianespace announced yesterday that it has won two new commercial launch contracts, and will aim in 2017 to tie its own record for yearly launches at 12.

Arianespace will also seek to tie its record number of launches with 12 missions planned this year. The company first reached this cadence in 2015, and was on track to tie it again last year were it not for a shipping issue that delayed the launch of DSN-1, a Japanese X-band military communications satellite damaged en route Europe’s Guiana Space Centre in Kourou, French Guiana.

I suspect that one reason Arianespace is getting these contracts, despite charging significantly more than SpaceX, is that they are successfully getting their customer’s payloads into orbit. SpaceX has a gigantic backlog of launches, so it makes no sense to give them more work as the launches will certainly not occur when these satellite companies need them to occur. This fact only ups the pressure and the competition. SpaceX has got to start getting that backlog into orbit, or else its business model will suffer significantly.

SpaceX launch delayed until Monday

One local news source now reports that SpaceX’s Falcon 9 launch has been delayed one day until Monday.

While officials announced at the start of week their plans to aim for a 10:28 a.m. Sunday departure, notices warning boaters and pilots of an upcoming launch now say the mission is targeting Monday, Jan. 9. The one-day delay means the launch time is expected to be a few minutes earlier to ensure the satellites are placed where needed in space.

This news has not yet been confirmed. The delay is now official.

The competition heats up

According to this story, China plans 30 launches for 2017, which would smash the record of launches, 22, the country set in 2016.

This website lists the known scheduled launches worldwide. As far as I can see, only 15 Chinese launches are listed. However, China’s space program is modeled after the Soviet Union’s, which means they are somewhat secretive. The first link above has been reporting on China quite reliably during the past year, so I have some faith that the goal of 30 launches seems reasonable.

In 2017 China however is not the only country, or company, that will be attempting smash records. Russia hopes to complete 29 launches, which would not be a record for that country but would be a significant recovery from the 17 they completed in 2016. India set a record of 9 launches in 2016, and hopes to top it in 2017, starting with a single launch in January that will place a record 103 satellites in orbit in one shot. Europe meanwhile shows 21 launches on its 2017 manifest, while Japan has 9, according to the second link above.

The list gets even more interesting when you look at the 2017 launches planned for each American company. SpaceX has 31 launches all by itself,. ULA has 14, while Orbital ATK plans 4.

Obviously, these predicted numbers are not what is really going to happen. SpaceX is not going to launch 31 rockets in 2017. Not a chance. However, if they can get through the year with no launch failures, they will likely complete more than half that number, since that was the pace they were aiming for in 2016 and were getting close to achieving until the September 1 launchpad explosion. Meanwhile, ULA’s prediction of 14 launches for 2017 seems wholly reasonable since ULA completed 12 launches in 2016.

What this data suggests overall is that the total number of launches in 2017 will go up, significantly. Moreover, the increase in pace will be linked to an revived commercial satellite market, as well as a newly competitive launch industry aimed at reducing costs while making its increased launch pace more routine. These factors suggest that the increases will not be a one time thing, but will instead be heralding a new standard that signals a new age in space travel.

Hold onto your hats. The next few years in space should be quite exciting.

NASA awards more operational manned missions to SpaceX and Boeing

NASA today awarded four more operational manned missions to SpaceX and Boeing, bringing their total planned flights now to six each, not counting their first demonstration mission.

The additional flights will allow the commercial partners to plan for all aspects of these missions while fulfilling space station transportation needs. The awards do not include payments at this time. “Awarding these missions now will provide greater stability for the future space station crew rotation schedule, as well as reduce schedule and financial uncertainty for our providers,” said Phil McAlister, director, NASA’s Commercial Spaceflight Development Division.

NASA essentially has no choice. These spacecraft will be the only way to get astronauts to ISS after 2018, when our contract with the Russians expires.

Moreover, by awarding these contracts now, before the end of the Obama administration, NASA essentially locks them down before the new Trump administration can take power and kill them.

SpaceX plans Jan 8 launch

SpaceX today released its final investigation results on the September 1 Falcon 9 launchpad explosion, and announced that they have now scheduled their next launch for January 8 out of Vandenberg Air Force Base.

As expected, the cause is the accumulation of solid oxygen in the wrappings of the helium bottle tank (COPV) inside the oxygen tank of the first stage. The following is their announced solution:

The corrective actions address all credible causes and focus on changes which avoid the conditions that led to these credible causes. In the short term, this entails changing the COPV configuration to allow warmer temperature helium to be loaded, as well as returning helium loading operations to a prior flight proven configuration based on operations used in over 700 successful COPV loads. In the long term, SpaceX will implement design changes to the COPVs to prevent buckles altogether, which will allow for faster loading operations.​

Their vagueness in describing the “prior flight proven configuration” is likely to protect proprietary information, but the overall solution suggests that their fuel loading operations will take longer.

The January 8 launch date was simultaneously announced on twitter.

U.S. wins launch scorecard for 2016

Doug Messier today has compiled a list showing the launch totals worldwide for 2016, showing that though the U.S. and China tied for first with the most launches, 22, the U.S. won the race with fewer launch failures. Russia fell to third, almost entirely because its Proton rocket has been grounded since June.

What I find interesting is that, very slowly, the competing American companies are beginning to compile launch numbers that match those of whole nations. ULA completed 12 launches, which beat everyone but the U.S., China, and Russia. SpaceX, despite no launches after its September 1 launchpad explosion, still beat India and Japan, long considered established space powers, and finished only one launch total behind Europe.

Eventually, I believe SpaceX is going to get its technical problems ironed out. When that happens, the competition between them and ULA could have both companies producing numbers that beat out the national programs of Russia and China. In fact, I expect this to happen within three years, but more likely sooner.

SpaceX preps for next launch

SpaceX has begun placing the ten Iridium satellites inside their Falcon 9 housing in preparation for its next launch, now planned for no earlier than January 7.

The first 10 satellites for Iridium’s next-generation mobile voice and data relay network have been fueled, joined with their deployment module and encapsulated inside the clamshell-like nose cone of a SpaceX Falcon 9 booster for launch as soon as next week from Vandenberg Air Force Base in California. SpaceX and Iridium have not announced a target launch date, but engineers are aiming to have the mission ready for liftoff by Jan. 7. That schedule is still very preliminary.

An official target launch date is pending the Federal Aviation Administration’s approval of the SpaceX-led investigation into the explosion of a Falcon 9 rocket on a launch pad at Cape Canaveral on Sept. 1, which destroyed the Israeli-owned Amos 6 communications satellite awaiting liftoff a few days later.

The article also has this interesting tidbit:

After the Falcon 9 rocket completes its pre-flight “static fire” test on the launch pad — the same test that resulted in the explosion in Florida on Sept. 1 — the 10 Iridium Next satellites will be mated with the booster for liftoff.

This suggests that SpaceX is changing its launch procedures, whereby before it would do the static fire dress rehearsal with the payload already loaded on the rocket. For this launch at least they are going to do that dress rehearsal before installing the payload on the rocket.

Chinese rocket fails to put two satellites into correct orbits

Tracking data suggests that two Earth-observation satellites launched today by China’s Long March 2D rocket were placed in the wrong orbits.

The two SuperView 1, or Gaojing 1, satellites are flying in egg-shaped orbits ranging from 133 miles (214 kilometers) to 325 miles (524 kilometers) in altitude at an inclination of 97.6 degrees. The satellites would likely re-enter Earth’s atmosphere within months in such a low orbit, and it was unclear late Wednesday whether the craft had enough propellant to raise their altitudes.

The high-resolution Earth-observing platforms were supposed to go into a near-circular orbit around 300 miles (500 kilometers) above the planet to begin their eight-year missions collecting imagery for Siwei Star Co. Ltd., a subsidiary of China Aerospace Science and Technology Corp., a government-owned entity.

China outlines its next five years in space

A white paper published by China’s State Council Information Office today both summarized the state that nation’s present space program as well as outlining its goals for the next five years.

In addition to outlining their future manned and unmanned missions (such asa landing a probe on the far side of the Moon, as well as sending a lunar sample return mission there), the overall plan includes developing their entire space infrastructure, from communication satellites to ground-based radar to space telescopes to missions to Mars. It is well thought out, and quite comprehensive. Possibly the most important part however is the white paper’s discussion of how they intend to enhance future industrial development.

The mechanism for market access and withdrawal has been improved. A list of investment projects in the space industry has been introduced for better management in this regard. Non-governmental capital and other social sectors are encouraged to participate in space-related activities, including scientific research and production, space infrastructure, space information products and services, and use of satellites to increase the level of commercialization of the space industry.

The government has increased its cooperation with private investors, and the mechanism for government procurement of astronautic products and services has been improved.

The Chinese government, communist now in name only, intends to fuel their space program with private investment and private enterprise. The overall program will be managed and run by the central government, but that government is going to make it a policy to encourage the private sector to compete and innovate in this effort.

Lobbying for the Moon

Several news articles in the past few days, partly fueled by the make-up of some of the new members of Trump’s NASA transition team, have exhibited a strong push to get the new administration to restart the Bush administration’s goal of returning to the Moon.

All of this might happen. What these stories suggest to me is that the big contractors, Boeing and Lockheed Martin who are building SLS and Orion, are pushing the new administration to give this rocket and capsule a mission, something it presently does not have. At the same time, the stories might also indicate some of Trump’s typical and very smart negotiation tactics. Unlike Obama, who never knew how to play the game, Trump appears to understand that if he is going to institute major changes in NASA’s future projects, he needs to get Congress to agree.

Rather than eliminate SLS and Orion right off the bat, as Obama tried to do when he unilaterally cancelled Constellation, Trump could offer the Moon to Congress as an interim goal for this giant rocket and capsule. This was what both were really designed for initially, as they are essentially modern copies of the Saturn 5 and the Apollo capsule. In exchange, Trump could then get Congress to place more emphasis on commercial space needs, getting the competing privately built capsules and new cargo vessels (Dragon, Starliner, and Dream Chaser) better funded and built faster. He could also propose that NASA encourage private companies to compete to design and build lunar orbiting facilities, ideas that both Lockheed Martin, Boeing, and Orbital ATK have been pushing now for several years.

I should note that giving a lunar goal to SLS/Orion does not mean that the program will get bigger or last significantly longer. Congress could simply fund one or two more missions through 2024. By that time, the competing successes of private space will make it very clear that this boondoggle is not the way to go into the future. By then, the new commercial space industry will have also grown enough that Congress will have no problem letting this industry replace SLS/Orion, and will thus have less objections in letting that program die.

I must also emphasize that I am speculating here. It is probably a bit soon to predict what a Trump administration will do with NASA and space. The signs however are pointing in this direction.

Trump puts Boeing and Lockheed Martin in competition!

On Thursday President-elect Donald Trump said that, because of the high cost overruns in building Lockheed Martin’s F-35 fighter, he has asked Boeing to submit an offer to build their F-18 instead.

The point here is not that Trump is going to change contractors. The point is that he is making them both aware that he can change contractors. Also, his meetings earlier this week with the CEOs of both Boeing and Lockheed Martin does not mean he is going to do what they want. Trump’s pattern has repeatedly been to meet with people who are likely going to be his opponents to ease their minds, and then sideswipe them immediately afterward with plans that they would have opposed. His meetings with Al Gore and Leonardo DiCaprio to discuss climate change did nothing to prevent him from picking a slew of climate skeptics for every single one of the cabinet posts involved in climate policy, people that both Gore and DiCaprio oppose strongly

Getting back to Boeing and Lockheed Martin, Trump’s actions in connection with their federal aviation contracts bodes well for commercial space. He is encouraging competition, a concept that the entire commercial space program is based on. I am willing to bet that when he finally begins setting NASA policy, he is going to demand SLS/Orion compete as well, or go by the wayside.

What happened at SpaceX the first time they landed a first stage

Cool image time! The National Geographic Mars series is combining fiction with high quality documentary footage of real events. The clip below shows the first ever vertical landing of a used rocket first stage in December 2015, and includes footage taken of SpaceX engineers and Elon Musk during that launch and landing. The landing ranks as one of the most important events in space history. And it still gives me goosebumps. Seeing that it also caused goosebumps to those who made it happen only emphasizes the significance of the moment.

Pressure on Trump to shift NASA transistion team towards private space

The competition heats up: Several of Trump’s most listened-to advisers are trying to convince him to put more commercial space advocates on his NASA transition team.

The appointments, which are expected to be announced shortly, partly reflect Mr. Thiel’s influence, the people said. The billionaire investor, who is Mr. Trump’s most prominent Silicon Valley supporter, is among more than two dozen people on the executive council overseeing the government-wide transition.

Along with former House Speaker Newt Gingrich and former Republican Congressman Robert Walker—two other champions of commercial space endeavors—Mr. Thiel has argued forcefully inside the transition that the original team sent to the National Aeronautics and Space Administration was skewed toward appointees closely identified with legacy space projects run by Boeing Co. and Lockheed Martin Corp., the people said.

This is good news. While my previous post, The squealing of pigs, focused on Trump’s environmental policy at NASA and elsewhere, his approach to commercial space remains unclear. These changes will help move his administration away from the pork of SLS and toward the competitive commercial space sector.

Let me add that this story reaffirms my belief that the best way to get Trump to shift to the right is to surround him with conservatives. Interestingly, it appears that Trump himself has chosen to do this. His first instincts might not be conservative, but he apparently is quite willing to take the advice of those who instincts are.

JAXA signs agreement with private lunar mining company

The competition heats up: Japan’s space agency JAXA has signed an agreement with ispace inc, a private lunar mining company that is also behind Japan’s only competing team in the Google Lunar X-Prize competition.

It is not clear if what this agreement entails. X-Prize competitors have to announce a contract with a launch company before the end of 2016, and this announcement does not say whether JAXA will provide that service to Japan’s competitor.

OneWeb raises $1.2 billion in investment capital

The competition heats up: OneWeb, in its effort to build a constellation of 900 satellites to provide internet services worldwide, has raised $1.2 billion.

Japan-based SoftBank invested $1 billion of the total $1.2 billion, and has also become a strategic partner, with one of its directors, Ronald Fisher, joining OneWeb’s board of directors. Combined with the $500 million OneWeb raised in June 2015, the total amount gathered now stands at $1.7 billion out of an expected total cost of $2.5 billion to $3.5 billion for the full constellation of 900 small satellites. OneWeb Founder Greg Wyler told SpaceNews that thanks to SoftBank, the company has raised more from investors than originally anticipated, allowing OneWeb to forgo a third investment round.

They plan to build a factory in Florida capable of building 15 satellites per week.

Swiss Space Systems declared bankrupt

Swiss Space Systems, which only a few years ago appeared to be on the cusp of competing successfully in the new space industry, was declared bankrupt on December 14.

The biggest factor to the company’s failure could be the attack that occurred against the company’s president in September, of which it appears he has not completely recovered. The attack itself remains unexplained, but before the attack the president had received threats, and the company’s offices were broken into and vandalized.

Another successful ULA Atlas 5 launch

The competition heats up: ULA’s Atlas 5 rocket successfully launched a commercial communications satellite on Sunday.

In its sixty-seven flights before Sunday’s launch, the Atlas V has achieved sixty-six successes, including a stretch of fifty-seven missions going back to October 2007. The only mission which was not a complete success, June 2007’s launch of the NROL-30 mission, a pair of naval intelligence satellites for the National Reconnaissance Office – reached a lower-than-planned orbit but the satellites were able to correct for this using their own propulsion. ULA describes the launch as successful from its customer’s perspective, while independent analysts consider it a partial failure.

Though the article notes that most Atlas 5 launches have been for the government, the company has recently been aggressively courting the private sector.

Vector successfully test fires its rocket engine

The competition heats up: Vector Space Systems has announced the successful first test firing of the first stage engine to be used on its Vector-R rocket.

The engine test, which took place in Mojave, Calif. on Dec. 8, featured a single piece, 3D AM printed injector developed in partnership with NASA’s Science, Technology, and Mission Directorate (STMD) Flight Opportunities, a program which extends research labs into space-relevant environments by partnering with small satellite launch companies. Earlier this year, NASA provided a grant to Vector to design and test the injector.

Vector continues to push the envelope by being the first in the industry to pursue the LOX/Propylene propellant combination, which created the highest thrust to date from a LOX/Propylene fueled engine. This test of the 5K-lbf on flight fuels serves as a stepping stone to Vector’s first launch of the Vector-R slated for 2017, and moves the company one step closer to its mission of connecting space startups and innovators with affordable, reliable access to space.

They have also signed the land lease for the Tucson site where they plan to build their rocket factory.

Orbital ATK’s Pegasus launches successfully

Orbital ATK’s Pegasus rocket was successfully launched today from the bottom of its L-1011 airplane, placing in orbit a NASA constellation of eight smallsat satellites designed to study hurricanes.

he use of an eight-satellite constellation will allow for more frequent observations, allowing for a better characterization of the early stages in a cyclone’s formation and of the storm’s eventual decay. Once in orbit, the satellites will be spaced evenly around their orbital plane, achieving an angular separation of around 45 degrees from each other. The CYGNSS satellites were built by the Southwest Research Institute and the University of Michigan, while their deployer was developed by Sierra Nevada Corporation. Each satellite has a mass of 28.9 kilograms (63.7 lb), with an overall payload mass of 345.6 kilograms (761.8 lb) including the deployer. The CYGNSS mission is expected to last a minimum of two years.

This was the first Pegasus launch since 2013. I’m not sure why it has not been getting more business, but it does have another launch now scheduled for June.

Back from Vandenberg

In my trip to Vandenberg Air Force Base yesterday to give a lecture to their local AIAA chapter, I got a quick drive around the southern parts of the base where the Atlas 5, Delta, and SpaceX launchpads are located. This is the same area I toured when I last visited the base back in March 2015.

I had been curious to see the fire damage from the fall wildfires. Unfortunately, a fog bank had rolled in and made it impossible to see the hills behind the launchpads where the fires had raged. I did see some fire damage within several hundred feet of a liquid nitrogen storage facility, but otherwise the clouds prevented me from seeing any of the wildfire damage.

The one item of interest that I did see was at the SpaceX launchpad. While we could not enter the facility, we could see in plain sight the first stage of the next planned Falcon 9 launch. They had hoped to lift off this week, but delayed the launch last week until January to complete the investigation into the September 1 launchpad explosion. Nonetheless, the first stage was there, lying horizontal out in the open air. Several nozzles were removed from the engine array at the stage’s base. Whether they were removed as part of the investigation, or as part of standard maintenance, I do not know.

1 128 129 130 131 132 214