Boeing’s 747 is finally heading for retirement

After 45 years of service, Boeing’s 747, the world’s first jumbo jet, is finally facing retirement as airlines consider more modern planes for their fleets.

The plane that so audaciously changed the shape of the world is now on the wrong side of history. Airlines are retiring older 747s – JAL no longer flies them – and Boeing’s attempt at catch-up, the latest 747-8 model, has had technical problems and is selling only very slowly. The air above my garden will not be troubled by 747s for very much longer.

The article gives brief but detailed outline of the 747’s history, and why passengers and pilots still love it. I love it because of this:

The 747 was America at its proud and uncontaminated best. ‘There’s no substitute for cubic inches,’ American race drivers used to say and the 747 expresses that truth in the air. There is still residual rivalry with the upstart European Airbus. Some Americans, referring to untested new technologies, call it Scarebus. There’s an old saying: ‘If it ain’t Boeing, I ain’t going.’

A comparison to the European Concorde is illuminating. The supersonic Anglo-French plane was an elite project created for elite passengers to travel in near space with the curvature of the Earth on one hand and a glass of first growth claret on the other. The 747 was mass-market, proletarianising the jet set. It was Coke, not grand cru and it was designed by a man named Joe. Thus, the 747’s active life was about twice that of Concorde.

3 comments

Soyuz rocket builder proposes major upgrade

The competition heats up: The head of the Russian company that builds the Soyuz rocket said today that a new upgrade of that rocket could be built and flying by 2022.

Russiaโ€™s future Soyuz-5 carrier rocket will be equipped with advanced new engines using ecology-friendly fuel, according to Alexander Kirilin. โ€œOne of the distinguishing features of the Soyuz-5 is the use of liquefied natural gas as fuel,โ€ Kirilin said in an interview with RIA Novosti published on Tuesday. โ€œThe engines will be developed from scratch, which would allow us to apply a variety of advanced technological and economic characteristics that would make Soyuz-5 competitive on global markets,โ€ Kirilin said. โ€œThe design of Soyuz-5 allows the addition of extra side blocks to make it a heavy-class rocket, but we are focusing now on a prototype with operational payload of 9 metric tons,โ€ he added.

At the same time, Kirillin stressed that the Soyuz-5 will not compete with the ongoing development of the Angara family of carrier rockets. [emphasis mine]

Kirillin is doing a political dance with this interview. On one hand he is trying to sell to the Putin government the idea of developing a new version of the Soyuz rocket — thereby giving his company work for decades hence — in order to increase Russia’s ability to compete in the international launch market. On the other hand, he has to convince that same government that this new Soyuz will not compete with Russia’s new Angara rocket.

The two ideas are contradictory, especially if the upgrade allows the Soyuz to be modular and scalable so it can launch larger payloads, like Angara.

Kirillin’s problem is that the only investment capital available to him comes from the government, which now controls the entire Russian aerospace industry. Under this Soviet-style monolithic set-up, he is not allowed to compete with other Russian companies. However, if he doesn’t convince the government to build something, his company will no longer have a reason for existing.

In other words, creating a single government organization to run all of Russia’s space industry, as Putin’s government has done, was very counter-productive in the long run. It discourages competition while naturally causing the industry to shrink.

0 comments

Orbital ATK cargo contract extended

The competition heats up: NASA has ordered two more cargo flights from Orbital ATK.

Orbital ATK, Dulles, Virginia, will fly two more missions under its 2008 contract for a total of 10 flights, according to Orbital ATK spokeswoman Vicki Cox. The company designated the missions OA-9e and OA-10e, Cox said. She declined to say when those flights will occur, although the company has said it plans to launch any new CRS missions it gets from NASA on Antares once it completes two deliveries using United Launch Allianceโ€™s Atlas 5 rocket. The Atlas 5 launches are slated for December and early 2016 from Cape Canaveral, Florida.

NASA may also order additional cargo flights from its other CRS contractor, SpaceX of Hawthorne, California. โ€œA modification is in work with both [CRS] providers,โ€ NASA spokeswoman Stephanie Schierholz wrote in an Aug. 13 email. โ€œAdditional missions for SpaceX are still under discussion.โ€

That this contract extension occurs about the same time NASA decided to delay its decision on the second round of cargo contracts is probably not a coincidence. It suggests to me that the agency is probably seriously considering awarding one of the next contracts to a more risky proposal, such as Sierra Nevada’s Dream Chaser. In that case, extending the present contracts gives them some additional margin should the new contractors have problems.

1 comment

NASA postpones decision again for 2nd ISS cargo contracts

In the heat of competition: NASA has again delayed its decision on awarding its second round of contracts for providing cargo to ISS, delaying the decision from September until November 5.

The launch failures this year is the major reason NASA has held off making a decision. They need to see how both SpaceX and Orbital ATK react to the failures, as both have also bid for second round contracts.

0 comments

Lumbering the Redwoods

An evening pause: Tonight’s pause is a challenge. Can you watch this 1940s industrial, describing the lumbering and milling of California redwoods, without feeling outrage or indignation against the work being described? Can you watch it with an open mind, recognizing that trees are renewable?

Or will the environmental brainwashing that our society has undergone since the 1960s cause you to shut your mind and refuse to consider the other side of this story?

Hat tip Phill Oltmann.

12 comments

DARPA awards phase 2 space plane contracts

The competition heats up: The second phase contracts in the development of a reusable space plane have been awarded by DARPA.

DARPA has awarded $6.5 million each to three companies for developmental design work, including Boeing (in partnership with Blue Origin), Northrop Grumman (in partnership with Scaled Composites and Virgin Galactic), and Masten Space Science Systems (in partnership with XCOR Aerospace).

The requirements are that the plane fly 10 times in 10 days, reach Mach 10+, put a 3,000 to 5000 pound payload in orbit, and cost less than $5 million per flight. In this new phase, the companies are to deliver finalized designs by 2016, with prototype development to follow.

3 comments

NASA considers using Bigelow module for deep space missions

The competition heats up: Rather than build something in-house for gobs of money and decades of work, NASA is considering using Bigelow Aerospace’s largest inflatable modules for its deep space missions.

What has happened is that NASA has signed a joint agreement with Bigelow to study the possibility of using Bigelow’s B330 module as a transport habitat on long flights. The agency really has no choice, as it doesn’t have the funding to develop the necessary large spacecraft for these missions, and Bigelow can provide them to it for much less.

This description of the background of Bigelow’s inflatable modules illustrates why NASA can’t build these itself:

The B330 evolved from the Genesis I and II modules that Bigelow Aerospace had launched into space. Those technology demonstrators were born out of the NASA project known as TransHab. The TransHab was an inflatable module designed for the ISS but was ultimately cancelled in 1999 due to budget constraints. The module would have provided a 4 level 27.5 feet (8.4 meter) diameter habitat for the astronauts.

After TransHab was cancelled, Bigelow worked with NASA on a technology transfer, giving Bigelow Aerospace exclusive rights to the technology. Using this technology, Bigelow designed, built and launched two technology demonstrators. They are still on orbit today. Genesis I was launched in 2006 with itโ€™s sister ship launching in 2007. Both ships tested flight operations processes and on-board electronics and have performed above design specifications. [emphasis mine]

Unlike NASA, as a private company Bigelow was able to build this technology quickly and at a low cost. With the new agreement, the goal will be study the operation of a B330 in independent flight in low Earth orbit. Whether an actual B330 will be build and launched however is not yet clear.

4 comments

The Space Show modernization crowd-funding campaign

For more than a decade David Livingston has been producing and hosting The Space Show, the aerospace industry’s most important outlet for telling the public what is happening in space.

Now David is starting a crowd-funding campaign to finance a major update to The Space Show archives, in order to make them fully searchable and thus accessible to historians and researchers. As he notes,

Our archives as of this morning contain 2, 524 interview programs. These interviews tell the story of the space industry as many guests were there when it started, when we went to the Moon, and even before SpaceX was started. But as it stands, nobody can search our archives for information, program content, breaking news, etc. The closest one can come to a search is the GuestSearch tool on our current website, but searches are not interactive and about two-thirds of our programs have no key words so a search using the GuestSearch tool is not very useful Space Show archives are a treasure of information and history. By making them fully searchable and of archival quality, everyone benefits, even the casual Space Show listener.

As a space historian, I think David’s effort here is essential. The data hidden in the Space Show archives is invaluable, describing the beginning of the commercial space industry better than any other source. Making it searchable would make this history available to future generations that otherwise would never see it.

Check out the campaign as well as the Space Show support site and contribute. Not only can you help future space historians you will help keep the Space Show on the air.

1 comment

Contract to build upgraded Vega rocket signed

The competition heats up: The European Space Agency today signed a contract to develop an upgraded version of its Vega rocket.

With respect to the VEGA configuration currently in operation, VEGA C aims to increase the load capacity of the orbital launcher up to 50%. Together with a further increase in operational flexibility, while maintaining its unrivalled orbital precision, it is expected to expand the capability to transport in the same flight a larger number of small satellites, in different orbital planes, or larger satellites. The new version of VEGA will be flight qualified in late 2018 for an entry into service as early as 2019. The group of countries which already participated in the development of VEGA, with Italy playing a major role with a 65% participation, welcomes now the entry of Germany.

I get the impression from this article that Vega is being used by ESA to spread the pork around, since to get Ariane 6 built they had to agree to not do so and give the work and control entirely to Airbus Safran. I thus wonder how competitive Vega will truly be.

0 comments

Orbital ATK orders second Atlas 5 for launching cargo to ISS

In the heat of competition: Even as it has accepted delivery of two new Russian engines to power its Antares rocket, Orbital ATK has ordered a second Atlas 5 rocket to launch its Cygnus cargo capsule to ISS.

I suspect they want to give themselves some cushion time to test and install these new Russian engines prior to an actual launch. In order to fulfill their contract with NASA, however, they have to launch several times next year, thus requiring more replacements for Antares.

0 comments

Update on Boeing’s CST-100

This article provides an update on the status of the construction of Boeing’s CST-100 manned capsule.

It also describes NASA’s lobbying effort with Congress to get the full budget it had proposed for the construction of the commercial crew spacecraft.

I note instead the apparent bureaucratic focus of all the work Boeing seems to be doing.

Following the CBR [Certification Baseline Review], Boeing successfully completed the Ground Segment CDR (Critical Design Review) on 4 December 2014 before moving onto the Phase 2 Safety Review (Part B) in early January 2015. By mid-March, Boeing completed the Phase 2 Safety Review (Safety Technical Review Board Readiness) and moved on to the Delta Integrated CDR, which took place on 27 March 2015.

Since then, Boeing has spent the summer months conducting the Phase 2 Safety review (STRB 80%) as well as producing the CDR for the launch elements of the program and the Qualification Test Article Production Readiness Review.

Moreover, in late July, teams at the Kennedy Space Center began building the Structural Test Article (STA) for the CST-100 capsule inside former Orbiter Processing Facility bay 3 (OPF-3).

Lots of reviews, but notice in the last paragraph they have only begun building the first capsule. As much as these reviews might help them make sure they are doing things right, they seem to create a situation where the company is able to slow-walk construction to help NASA with its congressional lobbying effort, while simultaneously making it sound like they are accomplishing a lot.

0 comments

The mobile launch building at Vostochny

At their new spaceport at Vostochny, the Russians are building a moveable launch building that will enclose their Soyuz rockets prior to launch.

Painted in elegant blue and white and standing almost 50 meters high, the Mobile Service Tower, MBO (for Mobilnaya Bashnya Obsluzhivaniya), is designed to provide personnel access to the Soyuz rocket during the countdown to liftoff from its launch pad in Vostochny. The structure can be also used to service the pad after launch and to process the rocket in case of an aborted liftoff.

With the tower in place, technicians can easily reach practically any part of the rocket as high as 37 meters above the surface of the launch pad. Internal access bridges of the tower surround the upper portion of the first and second stage, the third stage and the payload fairing.

The article also notes that “for decades, Soviet soldiers and officers and later their Russian civilian successors had to brave winter cold and summer heat preparing Soyuz rockets for launch on open-air gantries in Baikonur and Plesetsk. But in a sign how times have changed, the new generation of rocketeers will be protected from snow and rain with a climate-controlled tower completely enclosing the Soyuz rocket before liftoff from its newest launch pad at Russia’s Vostochny Cosmodrome.”

The irony here is profound. Big moveable buildings is how NASA has been doing it since Apollo. It is also what Boeing’s Delta family of rockets uses at Vandenberg in California. It is also why the Saturn 5 was and the Delta is so expensive to launch.

SpaceX abandoned such complicated structures in designing its Falcon 9, and instead decided to copy the old Soviet method of simple buildings for horizontal assembly and the simple horizontal transport to the launchpad. This appears to save a lot of money while simplifying rocket assembly.

That the Russians are now copying NASA’s more expensive but fancy mobile building approach means that, once again, their government is making decisions not based on efficiency but the prestige their political decisions can give them. From a competitive perspective, this is not going to benefit the Russia space effort, in the slightest.

But their workers will be more comfortable while they assembly those rockets!

2 comments
1 435 436 437 438 439 542