PLD’s first suborbital test launch aborted just prior to launch

According to company officials, the first suborbital test launch of PLD Miura-1 rocket was aborted today just prior to launch because some of the umbilical fuel and power lines failed to disconnect as planned.

The launch was from PLD’s launch site in Spain. No word when the company will try again. Before it can build its orbital Miura-5 rocket it needs the test data from this suborbital launch.

0 comments

ESA transfers its Artemis-2 Orion service module to NASA

The European Space Agency (ESA) yesterday officially handed over to NASA its second completed Orion service module, to be used in 2024 on the first manned Artemis mission, dubbed Artemis-2, that will carry four astronauts on a mission around the Moon.

The European Service Module-2 will power the Orion spacecraft on the Artemis II mission that will see NASA astronauts commander Reid Wiseman, pilot Victor Glover, and mission specialists Christina Koch with Canadian Space Agency astronaut Jeremy Hansen complete flyby of the Moon and return to Earth.

The crew will fly Orion to 8889 km beyond the Moon before completing a lunar flyby and returning to Earth. The mission will take a minimum of eight days and will collect valuable flight test data, in the first time for over 50 years that humans have voyaged to our natural satellite.

The odds of this launching in 2024 are relatively slim. It will also be the first time NASA will be flying Orion’s environmental systems (the systems that keep the astronauts alive). We all hope those system work perfectly this first time, since people will be on board.

0 comments

Arianespace signs deal with Spanish rocket startup PLD

Following up with its agreement with the UK rocket startup Orbex, Arianespace yesterday also signed a deal with the Spanish rocket startup PLD to study using that company’s as-yet-unflown Miura-5 rocket.

Like the Orbex deal, this agreement makes it possible for Arianespace to arrange launches using PLD’s rocket. It also tells us that Arianespace and the European Space Agency are shifting from designing and building their own rockets — a process that has failed to produce any profit and had presently left Europe with no launch capability — to acting simply as a customer buying that capability from independent competing private companies.

For this to work however both Orbex and PLD will have to get their rockets off the ground.

0 comments

Arianespace signs deal to study the possibility of using Orbex’s commercial rocket for launches

In what must be considered a major sea change in Europe, Arianespace — the European Space Agency’s (ESA) official commercial launch company — has now signed a deal with Orbex, a rocket startup based in the United Kingdom, to study the possibility of using Orbex’s not-yet-launched Prime rocket for future European launches.

In particular, it is expected that future collaboration would be particularly beneficial for customers planning small satellite constellations, providing a flexible solution for Low-Earth Orbit (LEO) payloads. Light and heavy-lift launch vehicles could jointly support customers in deploying their initial constellations into the required orbital planes, provide precise injections of a smaller number of satellites through dedicated missions, as well as provide replenishment and replacement launches.

While the ESA began developing a partnership with Orbex back in 2021 when it awarded Orbex a development contract worth 7.45 million euros, for Arianespace to go directly to this independent company for launch services suggests the new policy of ESA to stop developing its own rockets but to become a customer hiring the rockets of private companies is gaining steam.

0 comments

Engineers free stuck radar antenna on Juice probe to Jupiter’s big moons

Engineers have successfully freed the 52-foot wide radar antenna on the Juice probe to Jupiter, shaking it enough to release a pin that was blocking deployment.

The pin was freed by employing “back-to-back jolts”. Imagine when you roll your car back and forth to get it freed from mud or snow. It appears this is what they did with the pin.

Juice will arrive in Jupiter orbit in 2031, where it will make numerous fly-bys of Europa, Calisto, and Ganymede, and then settle into an orbit around Ganymede alone. The radar antenna was essential for probing the ice content of these worlds, below the surface.

Hat tip to reader Mike Nelson.

6 comments

Ariane-6’s first launch now likely delayed again, until 2024

According to officials from the German company OHB, which makes parts of Europe’s new Ariane-6 rocket, its first launch will not take place before the end of this year, as presently scheduled by Arianespace, the commercial arm of the European Space Agency (ESA).

In a May 10 earnings call, executives with German aerospace company OHB predicted that the rocket will make its long-delayed debut within the first several months of 2024, the strongest indication yet by those involved with the rocket’s development that it will not be ready for launch before the end of this year.

“It’s not yet launched, but we hope that it will launch in the early part of next year,” said Marco Fuchs, chief executive of OHB, of Ariane 6 during a presentation about the company’s first quarter financial results. A subsidiary of OHB, MT Aerospace, produces tanks and structures for the rocket. Later in the call, he estimated the rocket was no more than a year away from that inaugural flight. “I am getting more and more confident we will see the first launch of Ariane 6 early next year,” he said. “I think we are within a year of the first launch and that is psychologically very important.”

These delays seriously impact many projects of ESA and other European companies. Ariane-6 was originally supposed to launch by 2020, overlapping the retirement of its Ariane-5 rocket by several years. Ariane-5 now has only one launch left, presently scheduled for June. Once that flies, Europe will have no large rocket available until Ariane-6 begins operations. This situation is worsened for Europe in that its other smaller rocket, the Vega-C, failed on its last launch and has not yet resumed operations.

It is not surprising therefore that many European projects have been shifting their launch contracts away from Ariane-6 to SpaceX and others. It is also not surprising that there is now an increasing move in Europe to develop new competing private rocket companies, rather than relying on a government-owned entity like Arianespace.

6 comments

Space junk removal company ClearSpace signs deal to launch on Vega-C

The European company ClearSpace has signed a launch deal with Arianespace to fly the first test of its space junk removal robot on a Vega-C rocket set to launch some time in the second half of 2026.

The development of ClearSpace’s robot, which will use four grappling arms to surround and then capture its target, was paid for under a European Space Agency (ESA) $121 million contract which also required it to be launched on an Arianespace rocket. The problem right now is that it will fly as a secondary payload, and a primary payload has not yet been found.

Finding that primary payload is going to be difficult. First, Vega-C failed on its second launch last year and has not yet flown again. Second, it is expendable, and though cheaper than Arianespace’s other rocket, Ariane-6 (which has not yet launched), it is still more expensive than other commercial rockets now available. Third, the customer of that primary payload must also want to go into an orbit that will allow ClearSpace’s robot to reach its target, an abandoned Vega Payload Adapter from a previous launch.

As has been typical of Europe, this development is proceeding too slowly and is being hampered by requirements unrelated to profit and loss. By ’26 expect several other space junk removal companies — Astroscale and D-Orbit come to mind — to have already demonstrated their capabilities and already garnering market share, before ClearSpace even flies.

0 comments

ESA finally admits — sort of — that private enterprise can do it better

Stephane Israel, the architect of ESA's rocket failure
Stéphane Israël, the head of Arianespace and the
architect of its failure to compete in the field of rocketry.

Today there was a news report in which Stéphane Israël, the head of Arianespace, kind of admitted at last that the expendable design of Europe’s new Ariane-6 rocket was a mistake, and that it will take a decade more to fix it.

“When the decisions were made on Ariane 6, we did so with the technologies that were available to quickly introduce a new rocket,” said Israël, according to European Spaceflight.

He added that it will not be until the 2030s before Europe begins flying its own reuseable rocket.

Israël’s comments illustrate the head-in-the-sand approach he has exhibited now for decades. He claims the European Space Agency (ESA) chose to make Ariane-6 expandable so that it would be ready quickly, but its development has not been fast, and in fact is now more than three years behind schedule. When it finally begins flying operational it will have taken almost a decade to create it.

His comments also are his lame attempt to push back against a recent ESA report [pdf], issued in late March, that strongly rejected the decades-long model that ESA has used to build its rockets. Up until now and including the construction of Ariane-6, ESA designed and built its rockets, using Arianespace, headed by Israël, as its commercial arm. In other words, the government ran the show, much like NASA did for most of the half century following the 1960s space race. The result was slow development, and expensive rockets. Arianespace for example never made a profit in its decades-long existence, despite capturing half the commercial market in the 2000s and early 2010s.

The March ESA report rejected this model, and instead advocating copying what the U.S. has done for the past half decade by shifting ownership and design to the private sector, as advocated in my 2017 policy paper, Capitalism in space. To quote the ESA report:
» Read more

8 comments

Radar antenna on Europe’s JUICE probe to Jupiter stuck

European Space Agency officials revealed yesterday that the 52-foot radar antenna on its JUICE probe to Jupiter has failed to deploy as planned, and that they are attempting to shake what they think is a small pin free that is in the way.

Engineers suspect a tiny pin may be protruding. Flight controllers in Germany plan to fire the spacecraft’s engine in hopes of shaking the pin loose. If that doesn’t work, they said they have plenty of time to solve the problem.

Juice, short for Jupiter Icy Moons Explorer, won’t reach the giant planet until 2031. It’s taking a roundabout path to get there, including gravity-assist flybys of Earth and our moon, and Venus.

The radar antenna is needed to peer beneath the icy crust of three Jupiter moons suspected of harboring underground oceans and possibly life, a major goal of the nearly $1.8 billion mission. Its targets include Callisto, Europa and Ganymede, the largest moon in the solar system.

If this antenna cannot be freed, it will prevent JUICE from doing one of its prime missions.

11 comments

Spain’s government officially establishes a Spanish space agency

Spain’s Council of Ministers has voted to officially established a Spanish space agency, with operations beginning on March 7, 2023 with an initial budget of $753 million.

This announcement comes only a month before the private Spanish company, PLD, attempts its first suborbital launch from a Spanish spaceport of its Miura-1 rocket, its first stage designed to come back to Earth by parachute, recovered, and then reused. If successful the company hopes to then develop an orbital version.

The news from Europe increasing suggests that the members of the European Space Agency (ESA) are beginning to go their own way, relying less upon it. In addition to these developments in Spain, Germany now has three private companies developing rockets while Italy’s government has provided $308 million to its own Italian rocket company Avio. The United Kingdom meanwhile has had its own space agency for several years, is building several spaceports, and has been trying to develop its own space industry, with very mixed results. In addition, both Norway and Sweden are building spaceports for commercial operations.

ESA, while mouthing support for commercial space, has so far not done well in the past decade in transitioning from a government run, built, and owned operation to one owned by commercial companies. Its new Ariane-6 rocket, built and controlled by ArianeGroup but heavily managed by ESA, is still too expensive to compete with the new commercial rockets from the U.S. Nor does it appear ESA is moving very fast to fix this situation. It appears many people in Europe have recognized this state of affairs, and are looking for alternatives.

1 comment

Italy funds development by Avio of smallsat rocket and methane engine

In a move that might eventually separate Italy from the European Space Agency’s (ESA) Arianespace commercial division, the Italian government on March 13, 2023 announced that it has committed $308 million to the Italian company Avio to develop both a methane-fueled engine and the smallsat rocket to go with it.

The money will be used by Avio on two projects, one to develop an upgraded version of its M10 methane-fueled engine that has already completed two dozen static fire tests, and the other to develop the smallsat rocket, with a targeted first launch in 2026.

While the investment is officially in partnership with the ESA, its wholly-Italian nature suggests in the end it will not be part of Arianespace, but function as an independent competing rocket operated and owned by Avio, which is also the company that developed Arianespace’s Vega family of rockets.

If Italy allows Avio to pull free of ESA and operate as a separate competing rocket company, it will do Europe a favor. Right now the monopolistic nature of ESA is preventing it from competing successfully in the new commercial launch market. Having separately owned and competing private companies will only energize this European industry, which has generally been moribund for years.

0 comments

ESA attributes Vega-C launch failure to faulty nozzle from the Ukraine

The European Space Agency (ESA) has concluded that the launch failure of the second stage of Arianespace’s Vega-C rocket on December 20, 2022 was caused by a faulty nozzle produced by a company in the Ukraine.

[T]he Commission confirmed that the cause was an unexpected thermo-mechanical over-erosion of the carbon-carbon (C-C) throat insert of the nozzle, procured by Avio in Ukraine. Additional investigations led to the conclusion that this was likely due to a flaw in the homogeneity of the material.

The anomaly also revealed that the criteria used to accept the C-C throat insert were not sufficient to demonstrate its flightworthiness. The Commission has therefore concluded that this specific C-C material can no longer be used for flight. No weakness in the design of Zefiro 40 has been revealed. Avio is implementing an immediate alternative solution for the Zefiro 40’s nozzle with another C-C material, manufactured by ArianeGroup, already in use for Vega’s Zefiro 23 and Zefiro 9 nozzles.

The press release goes to great length to reassure everyone that these Ukrainian nozzles are still flightworthy, that the fix is merely changing the material used in the nozzle’s throat insert.

8 comments
1 12 13 14 15 16 22