Bridenstine to hold press event at SpaceX on Oct 10

NASA yesterday announced that its administrator Jim Bridenstine will hold a press event with Elon Musk at SpaceX headquarters this coming Thursday, October 10.

Also at this event will be the two astronauts who have been assigned to fly on the first demo mission of SpaceX’s manned Dragon capsule.

I am speculating, but I suspect that they will be announcing the launch schedule for both this manned mission as well the launch abort test that must precede it.

3 comments

Capsule and booster for SpaceX launch abort test arrives in Florida

Capitalism in space: The Dragon capsule and Falcon 9 first booster for SpaceX’s launch abort test have both arrived in Florida and are being readied for flight.

SpaceX’s launch license suggests this test will occur no earlier than November 1, so it looks like the company is getting close. However, don’t hold your breath about the manned launch. It appears that NASA is still hassling SpaceX “with certification and safety reviews,” which in plain language is mostly paperwork and filling out forms that NASA’s safety panel can then rubber stamp.

0 comments

NASA in negotiations to buy more Russian Soyuz astronaut seats

Collusion with Russia discovered! NASA has begun negotiations with Russia’s Roscosmos space agency to buy more astronaut flights to ISS using Russia’s Soyuz rocket and capsule.

According to the story at the link, NASA’s last purchased ticket will fly in March of 2020, and these negotiations would buy flights beginning in the fall of 2020 and beyond into 2021. The story also cites statements by NASA administrator Jim Bridenstine to CNN, confirming these negotiations.

Apparently NASA thinks the manned capsules being built by Boeing and SpaceX will not be ready by the fall of 2020, and needs to buy tickets from Russia because of this.

However, the only reason those American capsules will not have been approved and flown by then will be because NASA’s timidity in approving their launch. The agency’s safety panel as well as its management have repeatedly delayed these private American capsules, sometimes for very strange reasons, including a demand that lots of paperwork be filled out, and what I consider to be an unjustified demand for perfect safety.

Had NASA adopted a reasonable criteria for launch, SpaceX’s Dragon capsule could have flown three years ago.

Meanwhile, NASA seems quite willing to put Americans on a Soyuz rocket, launched by a foreign power whose safety record in the past half decade has been spotty, at best. In that time Russia has experienced numerous quality control problems, including mistakes that led to an Soyuz abort during a launch and a Soyuz parachute failure during a landing, corruption that forced them to recall all rocket engines and freeze launches for almost a year, and sabotage where someone drilled a hole in a Soyuz capsule prior to launch, a sabotage that Russia still refuses to explain.

It is unconscionable for NASA to favor putting Americans on a Soyuz with many documented safety issues, but block the launch of Americans on American-made capsules, for imagined safety issues that have mostly made no sense. In fact, the contrast makes me wonder about the loyalty of NASA’s bureaucracy. They certainly seem to favor Russia and Roscosmos over private American companies.

8 comments

NASA awards 14 companies small development contracts

Capitalism in space: NASA yesterday announced the issuing of fourteen small contracts totaling $43.2 million to a variety of big and small new space commercial companies, all aimed at developing technology for exploring the solar system.

The link has a detailed list, which includes Blue Origin and SpaceX, though most of the companies are relatively unknown.

NASA’s public statements in connection with these awards suggest they are support for Artemis, but that’s not true as is merely being done to sell Artemis, falsely. As designed these contracts will do more to accelerate the alternatives to Artemis. For example, the contract to SpaceX is “to develop and test coupler prototypes – or nozzles – for refueling spacecraft such as the company’s Starship vehicle.” Similarly, the contract to the small company ExoTerra will

build, test and launch a 12-unit CubeSat with a compact, high impulse solar electric propulsion module. Once flight-ready, the system will be demonstrated in-space as the CubeSat moves from low-Earth orbit to the radiation belts surrounding Earth. This small electric propulsion system could open up the inner solar system for targeted science exploration missions, using affordable spacecraft that range from 44 to 440 pounds.

Both might be applicable to Artemis, but won’t be, as NASA’s SLS, Orion, and Gateway contractors are likely uninterested in such things. Moreover, these technologies will be owned by the companies developing them, as the contracts are designed like the Space Act Agreements that fueled the Dragon and Cygnus commercial cargo capsules. The companies are to pay 25% of the cost, and then get to keep whatever is developed. NASA in turn gets access to this new technology, almost all of which appears designed to encourage alternatives to Artemis.

0 comments

NASA awards Lockheed Martin long term Orion contract

The never-ending boondoggle: NASA today awarded Lockheed Martin a long term contract to build as many as twelve future Orion capsules.

OPOC is an indefinite-delivery/indefinite-quantity contract that includes a commitment to order a minimum of six and a maximum of 12 Orion spacecraft, with an ordering period through Sept. 30, 2030. Production and operations of the spacecraft for six to 12 missions will establish a core set of capabilities, stabilize the production process, and demonstrate reusability of spacecraft components.

“This contract secures Orion production through the next decade, demonstrating NASA’s commitment to establishing a sustainable presence at the Moon to bring back new knowledge and prepare for sending astronauts to Mars,” said NASA Administrator Jim Bridenstine. “Orion is a highly-capable, state-of-the-art spacecraft, designed specifically for deep space missions with astronauts, and an integral part of NASA’s infrastructure for Artemis missions and future exploration of the solar system.” [emphasis mine]

I honestly don’t know how NASA can commit to building these Orion capsules, when Congress has yet to fund them. I guess NASA has decided that Congress and elections are irrelevant, that they — as our anointed rulers in Washington — can make these decisions unilaterally, at their own whim.

One quote in the press release really stood out to me:

“As the only vehicle capable of deep space exploration, the Orion spacecraft is critical to America’s continued leadership,” said Rep. Brian Babin [R-Texas].

What a crock. Orion is pork, period. It is simple too small for any deep space mission, no matter what lies NASA tries to tell us. It will get us nowhere.

All this contract does is justify the existence of the Johnson Space Center, which really has no purpose since the retirement of the shuttle and the decision to fly future astronauts on privately built spacecraft. Having Orion to “manage” will convince people that the workers at Johnson are doing something, when really almost everything of importance will be done by Lockheed Martin.

This contract is also another component in NASA’s political strategy to get as many players in the space business committed to both Artemis and Gateway. Pretty soon they will have everyone on board, with big tax dollar bribes.

Meanwhile, what they are building won’t accomplish anything, and will strand us in lunar orbit for decades, while other countries land and learn how to build bases on other worlds.

10 comments

Australia signs on to NASA’s Artemis project

Australia has committed $150 million to help its private sector contribute to NASA’s Artemis project and Trump’s goal to land a manned mission on the Moon by 2024, signing a joint agreement with NASA on September 21.

The government is investing $150 million over five years for Australian businesses and researchers to join NASA’s endeavour, and deliver key capabilities for the mission. “We’re backing Australian businesses to the moon, and even Mars, and back,” Prime Minister Scott Morrison said. “We’re getting behind Australian businesses so they can take advantage of the pipeline of work NASA has committed to.”

The specifics, as quoted from the agreement, are somewhat vague.

This agreement is part of NASA’s effort to accumulate allies for both Artemis and its lunar space station Gateway. Australia has now joined Russia, Europe, Japan, and Canada. All of these nations and their space agencies desperately want the U.S. project to take place, most especially Gateway, as it will firm up funding for them all for decades.

NASA already has the big space contractors behind Artemis, though Boeing has expressed some opposition to Gateway. It has also awarded a lot of small contracts to a number of companies in the new commercial space industry to support Artemis. On top of this, it has distributed the project’s management within NASA so as to solidify support in Congress.

By accumulating these allies whose interests are in line with NASA’s goals, the agency hopes to convince Congress to fund the project. Unfortunately, the House, controlled by the Democrats whose only policy goal these days is to oppose Trump, have so far refused to fund the Trump 2024 manned mission.

Whether Artemis and Gateway will happen remains an open question. Congress wants the pork both projects will bring them. I predict that if both houses of Congress return to Republican control in 2020 they will fund this boondoggle.

Unfortunately, this won’t get us anywhere near the Moon, as the project as designed actually makes lunar landings more difficult and expensive. Getting from Gateway to the lunar surface requires more equipment and fuel than going directly there. If built as NASA has proposed, our astronauts will watch from Gateway as China and India land and begin settling the Moon.

But it will justify the spending of a lot of taxpayer money in congressional districts for decades to come. Hooray!

0 comments

Boeing pushing to kill Gateway for more SLS funds?

Turf war! According to Eric Berger at Ars Technica today, the House hearings yesterday about Gateway and the Trump effort to complete a manned mission to the Moon by 2024 suggest that Boeing is lobbying to kill both Gateway as well as NASA’s effort to use multiple commercial rockets, in order to get its SLS rocket more funding.

Essentially, Boeing is getting almost no contracts in connection to Gateway. Furthermore, the much cheaper commercial rockets are a serious competitive threat to its SLS rocket. However, if Gateway was dropped and the money instead committed to building a more powerful upper stage for SLS, which is Boeing’s baby, the money would go to them. Moreover, doing this would make it unnecessary for NASA to use other commercial rockets, since SLS could do it all.

Berger’s analysis seems right on target. While Gateway is a bad idea, what Boeing proposes instead would be no better. As Berger notes,

What was surprising is that [lawmakers] at the hearing also appeared to be swayed by [Boeing’s] view that bypassing commercial rockets and the Gateway would lead to a simpler and faster lunar mission. “I believe there is value in developing commercial capabilities,” [one lawmaker] said toward the end of the hearing. However, she added, “I am concerned that the decisions are not being driven by what is most efficient or effective and what is most cost efficient.”

This is an interesting viewpoint given that commercial rockets cost $100 to $200 million, at most, versus the $1 billion to $2 billion cost of a single SLS rocket—not including the hundreds of millions of dollars, at a minimum, the agency would have to invest in Exploration Upper Stage development contracts with Boeing. Moreover, one of the commercial rockets—the Falcon Heavy—already exists and has flown three successful missions. Other boosters, including Blue Origin’s powerful New Glenn rocket, should be ready to fly in two or three years. An SLS rocket with the better upper stage almost certainly wouldn’t be ready by 2024, and NASA knows this.

“At this point, there is no path by which the Exploration Upper Stage will be ready for Artemis 3 in 2024,” the NASA administration source told Ars. “Hence, it is not in the critical path (for the Moon landing).”

This lobbying effort provides us a perfect illustration of the overall incompetence and corruption that permeates our government in Washington. No one there appears the slightest bit interested in serving the national interest. Instead, the focus is on how they can get politicians to give them money.

3 comments

Bridenstine will ask Russia for explanation about drill hole

NASA’s administrator Jim Bridenstine, when asked by journalists about the decision by Russia to keep secret the origins of the drill hole in a Soyuz capsule that caused a leak on ISS, said he will politely beg Russia for some answers.

NASA Administrator Jim Bridenstine vowed Thursday to speak to the head of the Russian space agency after reports that the cause of a hole found on the International Space Station last year would be kept secret.

But he was careful to point out that he doesn’t want this situation to destroy the country’s relationship with Russia, a partner in space since 1975. “They have not told me anything,” Bridenstine told the Houston Chronicle during a question and answer session at a Houston energy conference. “I don’t want to let one item set (the relationship) back, but it is clearly not acceptable that there are holes in the International Space Station.”

Sure, let’s not offend those Russians so we can keep flying Americans on their capsules, even though they won’t tell us who drilled a hole in a Soyuz capsule prior to launch, then patched it badly so that it began leaking after a few months in space.

This kind of logic could only make sense in Washington government circles.

1 comment

Progress on Dragon parachute tests

It appears that SpaceX’s parachute testing for its Dragon manned capsule is finally satisfying the concerns of NASA and its safety panel, based on a Sept 17 NASA blog post.

In fact, SpaceX’s success has even forced NASA “to reevaluate its own [parachute] standards and certification processes.”

The article at the link also notes quite correctly NASA’s tendency to miss the forest for the trees, which is why it has forced SpaceX to do so much additional parachute testing, even though the company apparently had a solid understanding of its parachutes a long time ago.

[T]he space agency has been focused on parachutes and COPVs [the tank issues that caused the 2016 launchpad explosion] for years. This is primarily a result of NASA’s notoriously reactive approach to safety: SpaceX suffered two COPV-related Falcon 9 failures in 2015 and 2016 and has experienced an unknown number (likely 1-3) of anomalies during Crew Dragon parachute testing.

As a result, NASA has focused extensively on these two stand-out concerns. To an extent, this is reasonable – if you know things have a tendency to fail, you’re going to want to make sure that they don’t. However, prioritizing reactive safety measures at the cost of proactive safety would be a major risk, akin to getting in a car crash because you didn’t use a turn signal and then prioritizing turn signal use so much that you forget to look both ways before making turns. Sure, you will probably never get in the same crash, but you are raising the risk of new kinds of accidents if you overcorrect your attention distribution.

Either way, it increasingly appears that a manned Dragon mission might finally be getting close to launch.

0 comments

Problems fixed with next Russian ISS module

According to a report from Russia today, the problems with contamination in the fuel tanks for Russia’s next module to ISS, originally scheduled for launch in 2013, have finally been dealt with, and the launch can go forward.

“Original tanks will be used. They had successfully undergone all trials, all problems with them have been fixed. We are now receiving relevant documents,” one of the sources told TASS. He said the module is currently at the Khrunichev center, and the timeframe of finishing touches to it is now being coordinated.

Another source in the industry told TASS that although Nauka tanks were initially designed for multiple use, “they will be used only once – for the module’s docking with the space station.”

In other words, they weighed their options, and decided that limiting the tanks to only one use was better than trying to replace them. I suspect this is because the replacement was both very difficult and would have also delayed the launch so much that ISS might not have been orbit any longer.

A new launch date has not been announced. Previously Roscosmos had indicated 2020 as the date.

0 comments

LRO fails to spot Vikram on Moon

Despite successfully taking high resolution images of the area on the Moon where it is thought India’s Vikram crash-landed two weeks ago, the Lunar Reconnaissance Orbiter (LRO) science team has been unable to identify it in those images.

LRO’s Lunar Reconnaissance Orbiter Camera instrument, or LROC, imaged the intended south pole touchdown site for the lander, which is called Vikram, as planned yesterday (Sept. 17), Aviation Week’s Mark Carreau reported. But “long shadows in the area may be obscuring the silent lunar explorer,” Carreau wrote.

“It was near dusk as the region prepares to transition from a two-week lunar day to an equally long lunar night, so shadows covered much of the region, and Vikram may not be in the LROC’s field of view,” Carreau wrote, citing a NASA statement.

This means that they will simply have to try again during a later orbit. Eventually the lighting conditions will be right, and LRO will photograph Vikram.

0 comments
1 91 92 93 94 95 192