India successfully completes static fire testing of rocket engine for human flights

The new colonial movement: India has successfully completed the third long duration static fire tests of its Vikas rocket engine, to be used on its planned manned space mission dubbed Gaganyaan.

[T]he Vikas engine is the workhorse liquid rocket engine powering the second stage of India’s Polar Satellite Launch Vehicle (PSLV), second stage and the four strap-on stages of the Geosynchronous Launch Vehicle (GSLV) and the twin-engine core liquid stage (L110) of GSLV Mk-III.

Experts point out that the successful testing is necessary as the testing is part of the human rating of a rocket that was not originally designed to launch humans into space. Every space agency follows its own standards of human rating of a launch vehicle and there are no global standards. “This test is one of the critical items which need to be checked in human rating GSLV Mk-III. Semi-Cryogenic engine SE-200 which will replace Vikas is still under development and its developmental times will not match the ambitious Gaganyaan timelines. Vikas is one of the most reliable engines in the world and has proved its mettle.

If you look at PSLV, GSLV Mk-II and GSLV Mk-III missions where Vikas has been used, the burn profile or duration is approximately around 150-160s only on a typical flight. Testing its performance above its designed operational limit is essential to ensure engine reliability against any event of a mishap.

In other words, for the manned mission Vikas will have to burn for a much longer time than its normal profile. They have now successfully shown that it can handle that long burn time.

1 comment

FAA threatens shutdown of SpaceX’s Starship program at Boca Chica

Banned by the FAA?
Starship banned by the FAA?

They’re coming for you next: An FAA official revealed yesterday that the agency has not approved the launch tower that SpaceX is building for its Starship/Superheavy rocket in Boca Chica, Texas, and threatened that if disapproved the government would force the company to tear it down.

The Federal Aviation Administration warned Elon Musk’s SpaceX in a letter two months ago that the company’s work on a launch tower for future Starship rocket launches is yet unapproved, and will be included in the agency’s ongoing environmental review of the facility in Boca Chica, Texas. “The company is building the tower at its own risk,” an FAA spokesperson told CNBC on Wednesday, noting that the environmental review could recommend taking down the launch tower.

The FAA last year began an environmental review of SpaceX’s Starship development facility, as Musk’s company said it planned to apply for licenses to launch the next-generation rocket prototypes from Boca Chica. While the FAA completed an environmental assessment of the area in 2014, that review was specific to SpaceX’s much-smaller Falcon series of rockets.

This revelation from FAA officials is most interestingly timed, coming on the same day as this garbage article about the terrible environmental damages some activists imagine SpaceX’s launch facility might someday cause. As is usual for a mainstream news source, the article makes no reference to the wildlife preserve that surrounds the Kennedy Space Center in Florida, where we have empirical proof for more than a half century that a spaceport does no harm to the environment and actually acts to protect it from development.

Nor was this the only such attack article in the past two days. Here is just a sampling:
» Read more

30 comments

Evidence found proving Georgia ballots were counted multiple times in 2020 election

The audit of 147,000 ballots in Fulton County, Georgia, has now found definitive proof that the same ballots were counted multiple times, thereby manufacturing fake votes.

The link takes you to a Twitter video showing examples of several absolutely identical ballots that were run through the tabulators multiple times to produced fake votes. The multiple scans were also done on the same tabulator, meaning it was likely done by the same person.

This proves that there was vote tampering in Fulton County. The investigation now has to determine who did it, which will be possible because the ballots show the tabulator used and when. Linking this to footage on security cameras will determine the perpetrator.

The audit also has to determine the extent of the fraud. One or two ballots tabulated twice is not significant. There is other evidence that suggests thousands of ballots were tabulated improperly and intentionally in this manner. If the audit demonstrates this, and calculates the number of votes involved, it could prove the election in Georgia was invalid.

At a minimum it proves that Georgia needs a complete overall of its election system, including a complete house-cleaning of all involved, especially in Fulton County.

UPDATE: Read this detail report on the new allegations and discoveries that point to outright fraud in the Georgia November 2020 vote tallies. It captures the whole story very nicely.

10 comments

Today’s blacklisted American: School district fires teachers for expressing their opinions publicly

Modern science!
Modern education in Oregon: Facts don’t matter!

Persecution is now cool! An Oregon school district is moving to fire two teachers because they began a campaign to keep the bathrooms in their schools male and female only.

The teachers are suing the school district to keep their jobs.

Assistant principal Rachel Damiano and science teacher Katie Medart of North Middle School face a pre-termination hearing before the school board Thursday. They are seeking a temporary restraining order (TRO) and preliminary injunction as they continue suing the Grants Pass School District for violating their speech rights under the U.S. and Oregon constitutions.

…The district argues the federal court can’t reinstate Damiano and Medart to their positions, from which they’ve been on paid leave for three months for “inappropriate behavior,” unless the school board accepts the superintendent’s recommendation to fire them.
» Read more

4 comments

NASA awards three contracts to develop nuclear propulsion concepts

Capitalism in space: NASA yesterday awarded three different contracts to three different corporation partnerships to develop new nuclear propulsion concepts for use in space.

The contracts, to be awarded through the DOE’s Idaho National Laboratory (INL), are each valued at approximately $5 million. They fund the development of various design strategies for the specified performance requirements that could aid in deep space exploration.

Nuclear propulsion provides greater propellant efficiency as compared with chemical rockets. It’s a potential technology for crew and cargo missions to Mars and science missions to the outer solar system, enabling faster and more robust missions in many cases.

The contracts went to these partnerships:

  • Lockheed Martin and BWX Technologies
  • Aerojet Rocketdyne, General Atomics Electromagnetic Systems, and X-energy
  • Blue Origin, Ultra Safe Nuclear Technologies, Ultra Safe Nuclear Corporation, General Electric Hitachi Nuclear Energy, General Electric Research, Framatome, and Materion

Once the concepts are put forth at the end of the 12-month contracts, the DOE’s laboratory will review them and make recommendations to NASA for further work.

This contract, along with other NASA contracts to develop nuclear power for use on planetary surfaces, strongly suggests that the fear of using nuclear power in space is receding. If so, the capabilities in space will increase significantly in the coming years.

13 comments

More evidence of shocking fraud in Georgia’s 2020 election tally

The petitioners in a lawsuit claiming significant fraud and vote tampering in Georgia during the November 2020 election have announced today in a press release [pdf] further evidence that are downright shocking if true.

The VoterGA team found 7 falsified audit tally sheets containing fabricated vote totals for their respective batches. For example, a batch containing 59 actual ballot images for Joe Biden, 42 for Donald Trump and 0 for Jo Jorgenson was reported as 100 for Biden and 0 for Trump. The seven batches of ballot images with 554 votes for Joe Biden, 140 votes for Donald Trump and 11 votes for Jo Jorgenson had tally sheets in the audit falsified to show 850 votes for Biden, 0 votes for Trump and 0 votes for Jorgenson.

Fulton Co. failed to include over 100,000 tally sheets, including more than 50,000 from mail-in ballots, when the results were originally published for the full hand count audit conducted by the office of the Secretary of State for the November 3 rd 2020 election. Those tally sheets remained missing until late February when the county supplemented their original audit results.

Petitioners contend that Fulton County did not provide drop box transfer forms for at least three pickup days when obligated to do so via an Open Records Request. Those missing forms are still needed to provide chain of custody proof for about 5,000 ballots. [emphasis mine]

The evidence suggests that the tally sheets, used to make the final count, are filled with fraud and fabrications designed to steal the election for Joe Biden, changing the totals in the examples given above to remove 151 Trump/Jorgenson votes while adding 296 non-existent Biden votes to the total.

That Fulton County has failed to provide 100,000 tally sheets, and stalled for as long as it could to turn those sheets over, suggests that election officials there were well aware of these and many more fabrications, and wished to hide them.

In other words, they were partners in the crime, and have been trying to conceal this fact. One wonders what we would find if a full audit was done of all 100,000 tally sheets.

11 comments

House slams military for not reforming contracting for space missions

Government marches on, to nowhere! The House Appropriations Committee has issued a report strongly criticizing the Air Force and the new Space Force for its failure to reform in any way its contract acquisition management, even though that was the prime reason Congress created the Space Force in the first place.

The report dedicates an entire page to detailing the committee’s dissatisfaction with what it sees as foot-dragging on space acquisition reform — which was one of the primary congressional rationales for the creation of the new space service in the first place. Indeed, the [appropriations committee] reiterates: “The Committee believes the Space Force was established to bring greater attention and focus to fixing its acquisition issues because previous attempts to do so did not produce lasting results.”

The [committee’s] concerns include that that Department of the Air Force — which oversees the Space Force much as the Navy oversees the Marine Corp — still has no clear plan for creating a separate management chain for space acquisition. Similar concerns were voiced at a May hearing by both the chair and ranking members of the HAC defense subcommittee, Rep. Betty McCollum, D-Minn., and Rep. Ken Calvert, R-Calif., respectively.

None of this should be a surprise. The reason the Space Force was advocated by some reformers was to get it out from under Air Force control and allow it to decide for itself what it needed. The belief was that this would streamline contracting and project development.

The fear, which I expressed repeatedly, was that the swamp in Washington would instead use this as an opportunity not to streamline operations but to create a whole new bureaucracy. That is standard operating procedure for government bureaucracies. Any time Congress has mandated a new agency designed to reduce bureaucracy it has for more than a century instead led to a larger bureaucracy, with nothing streamlined.

It appears the latter is what is now happening with the Space Force.

3 comments

Today’s blacklisted American: History professor slandered and ostracized for noting the many historical errors of the NY Times 1619 project

Today's modern witch hunt
A witch hunt: What passes for intellectual discussion
at Central Connecticut State University

Persecution is now cool! A tenured history professor is under vicious and slanderous attack by the faculty and administration of his college because he has publicly and privately opposed the use in its history curriculum the New York Times 1619 project.

Jay Bergman, a professor of history at Central Connecticut State University [CCSU], wrote to the state’s superintendents earlier in the year asking them to not embed the curriculum, saying it “presents America’s history as driven, nearly exclusively, by white racism” and that “nearly everything else in the 1619 Project, is entirely false, mostly false, or misleading.”

As Bergman also noted,
» Read more

2 comments

Northrop Grumman wins contract to build Lunar Gateway’s habitable module

Capitalism in space: NASA yesterday announced that it has awarded Northrop Grumman the construction contract for building HALO, (Habitation and Logistics Outpost), the module where astronauts will live and work on its Lunar Gateway space station.

Combined with earlier development contracts this contract, worth $935 million, brings the total fixed-price cost to about $1.1 billion.

[HALO], one of the first for the Gateway, will serve as a habitat for visiting astronauts and a command post for the lunar orbiting facility. It will have docking ports for Orion spacecraft, cargo vehicles like SpaceX’s Dragon XL and lunar landers, as well as for later modules to be added by international partners. HALO is based on the Cygnus spacecraft that Northrop Grumman uses to transport cargo to the International Space Station, but extensively modified with docking ports, enhanced life support and other new subsystems.

This module is not expected to launch before 2024. Moreover, it is supposed to work in conjunction with what NASA calls its Artemis 3 mission, the third launch of SLS and the first to dock with Gateway. SLS however is so far only funded through its first two flights, and has a schedule that is presently highly uncertain.

There is great irony here. HALO, based on the Cygnus cargo freighter, will be about that size. If the present schedule for SpaceX’s Starship continues as expected, it will be flying to the Moon at about the same time, and will have a cargo bay big enough to store several Cygnus freighters inside. And though no work has yet been done to make that cargo bay habitable, Starship’s cost per launch, about $2 million, is so far below the $1.1 billion cost for HALO that it will certainly cost much less than HALO to make it a habitable station. And it will be gigantic in comparison.

21 comments

China launches 5 military reconnaissance satellites

Using its Long March 6 rocket, China today successfully launched five military reconnaissance satellites.

This is China’s fourth successful launch in the past week.

Though this newer rocket’s first stage does not use toxic hypergolic fuels — China’s older rockets — that first stage still crashes in China after its job is done and it falls to Earth. No word on whether it landed near inhabited regions.

The leaders in the 2021 launch race:

22 China
20 SpaceX
11 Russia
3 Northrop Grumman

The U.S. still leads China 29 to 22 in the national rankings.

2 comments

Today’s blacklisted American: YouTube shuts down channel that routinely broadcasts Trump rallies

The Bill of Rights cancelled at YouTube
No first amendment allowed at YouTube.

Persecution is now cool! One day prior to the July 3, 2021 Trump rally in Florida, YouTube unilaterally suspended Right Side Broadcasting, the channel most well known for live streaming such events.

The suspension was for seven days. YouTube also deleted the channel’s videos from several other Trump events. From Right Side Broadcasting blog announcement:

YouTube has suspended RSBN from live streaming and posting content to their YouTube channel on the eve of President Donald Trump’s Save America rally in Sarasota, Florida.

YouTube has also deleted all of RSBN’s coverage of Trump’s June 26 rally in Wellington, Ohio, along with his June 5 speech to the North Carolina GOP convention.

The videos deleted had several million views.

As is usual for these efforts at censorship, YouTube merely claimed that “The videos contain remarks from President Trump that violate the aforementioned policies and countervailing views on those remarks are not provided.” Of course, YouTube has never demanded any Democrat to provide “countervailing views” during their political rallies, and I am sure the Google-owned video broadcasting service never will.
» Read more

12 comments

NASA to scientists: Don’t expect to use SLS for science missions for at least a decade

In a briefing held by the planetary science community to propose its future missions for the next decade, a NASA official explained that there will likely be no available launches on NASA’s SLS rocket for planetary missions until the late 2020s, and more likely not until the next decade.

While NASA has a goal of being able to launch three SLS missions in a 24-month period, and two in 12 months, the supply chain is currently limited to one SLS per year. That will change by the early 2030s, [the official] said, growing to two per year and thus creating opportunities for additional SLS missions beyond the Artemis program. That will be enabled by changes to at the Michoud Assembly Facility to increase core stage production and a “block upgrade” to the RS-25 engine used on that core stage that will be cheaper and faster to produce.

The official also claimed that the cost of buying a launch on SLS is at best going to be $800 million, but that price won’t be available until the ’30s when SLS’s are launching more frequently. Until then, it appears NASA will charge one billion per launch.

All of this is pure fantasy on NASA’s part. Once cheaper and more usable private commercial rockets come on line, such as SpaceX’s Starship, SLS will go the way of the horse buggy. And this is likely to happen much sooner than 2030, more likely in the next three years.

Moreover, for both cost and practical reasons I cannot see any planetary scientist planning a mission on SLS, ever. There are now much cheaper options that are actually flying, such as SpaceX’s Falcon Heavy, which costs about $100 million per launch. Moreover, SLS’s slow and cumbersome launch pace should scare any planetary scientist away, as such missions must launch on time, and SLS might easily miss their launch windows. In fact, this has already happened. For years Congress mandated that Europa Clipper launch on SLS. When it became clear that SLS would not be available for that mission’s launch window, Congress finally relented and allowed NASA to buy the launch from a commercial company.

17 comments
1 335 336 337 338 339 981