Largest jet engine ever test fired

The competition heats up: General Electric has completed the first test firing of the largest airplane jet engine ever built.

With a front fan spreading a full 11 ft (3.35 m), the GE9X is a world record holder and generates thrust in the order of 100,000 lb. To accommodate the aeronautical behemoth, the Peebles facility was recently upgraded with a larger air intake, extra fuel tanks to feed the giant engine, and high temperature gear to deal with the hotter, more efficient design.

GE says that the GE9X is currently undergoing its first Full Engine To Test (FETT). This is the next level of the test series, which began in 2011 at the component level, and marks the first test of the complete system, which comes only six months after the engine design was finalized. GE says that this relatively early testing was to ensure that the test data was available as soon as possible for the certification engines, which are scheduled to be installed in GE Aviation’s flying test bed for certification of flight testing in 2018.

1 comment

OneWeb satellite factory coming to Florida

The competition heats up: OneWeb officially announces its plan to build its satellite factory in Florida.

OneWeb Satellites LLC prepares to break ground on its new estimated $85 million high volume satellite manufacturing factory in Exploration Park, Florida. Announced during a ceremony with Florida Governor Rick Scott and OneWeb founder Greg Wyler, the factory near NASA’s Kennedy Space Center is set to open in 2017, with delivery of initial satellites later that year or early the next. OneWeb Satellites is a joint venture between OneWeb, a satellite based internet provider, and Airbus Defence and Space, the world’s second largest space company.

I think this news report of the press conference notes the most important aspect of this satellite factory, its assembly-line approach:

Typically, communications satellites take four to five months to assemble, Brian Holz, chief executive of OneWeb Satellites, a joint venture of OneWeb and Europe’s Airbus Group’s Defense and Space said during an event near the future location of the factory. β€œWe’re going to build one in an eight-hour shift,” he said. He did not give details but said the factory would be highly automated.

If all goes right, they should begin launch satellites in large numbers within two years, which will mean a lot of additional launch business for the smallsat rocket industry.

2 comments

Video of recovered Falcon 9 first stage on the road

The competition heats up: SpaceX’s recovered Falcon 9 first stage was moved by road back to the company’s testing facility in Florida yesterday, a journey that was recorded by bystanders, including people in a Kennedy Space Center tour bus.

I have embedded the longest video below the fold, because it provides the best closeup view of the booster. Look especially at the booster’s top, where you can see practically no damage. This thing looks ready to fly.
» Read more

3 comments

Nick Drake – One of These Things First

An evening pause: This cover of the Nick Drake song is quite nice. The musician, who does not identify himself anywhere on his youtube page, is playing everything, though some of the instrument tracks were recorded earlier. One funny bit: The song is so good that I never noticed the first time that he has a black cat on his lap. As he notes, “My cat decided to shift positions on my lap just as it was about to end, almost ruining a good take. Luckily he settled down just in time.” Watch it first for the song, then take a look near the end as the cat tries to steal the scene.

Hat tip Edward Thelen.

1 comment

The commerical battle over U.S. surplus ICBM’s

Link here. The article provides a good summary of the conflict between Orbital ATK and Virgin Galactic over the Defense Department’s possible sale of surplus ICBM’s for commercial use.

While Orbital has been lobbying to get Congress to lift the ban on the Pentagon selling its surplus rockets to the private sector, Virgin Galactic has been harnessing the industry lobbying arm to convince Congress to keep the ban. They fear that if the missiles become available, their as yet unflown LauncherOne will not be able to compete.

I find it very revealing that Virgin Galactic wants to use regulation to hinder their competitors. To me, this is another sign that they are not very competitive or competent in actual rocket building. Rather than build and launch their rocket at a competitive price, they want to stifle an opportunity to lower launch costs.

A hearing on this issue is taking place today. Stay tuned.

6 comments

An update on SpaceX’s recovered first stage

Link here. The story not only gives a detailed description of the prep work done to get the stage, dubbed CRS-8 S1, ready for transportation to the test facility where it will undergo static fire tests, it also gives an update on the status of SpaceX’s upcoming launches. This one sentence sums it up:

The frequency of SpaceX launches is expected to pick up the pace in June with up to three launches planned, potentially including the historic reuse of the CRS-8 S1.

If SpaceX can get three rockets off the ground in one month, a first for the company, they will help ease their launch backlog while also demonstrating that they can launch at a fast and reliable rate.

5 comments

OneWeb to set up operations in Florida

The competition heats up: The head of OneWeb confirmed today that his company is going to establish its base of operations in Florida.

The founder of OneWeb, Greg Wyler, confirmed to the Orlando Sentinel that his company is moving to Kennedy Space Center. Wyler plans to announce more details Tuesday morning in a news conference with Gov. Rick Scott, who will explain $20 million in state incentive dollars for the company. “It’s pretty exciting to see that Florida will be the base for a new satellite network that will extend high-speed access to 54 percent of the globe,” Wyler said in a phone interview.

OneWeb already has $500 million in funding to launch the new satellites, designed to boost internet access globally. It also has contracts with Virgin Galactic and French company Arianespace for launches. The company plans to hire at least 250 people.

The important part of this story for Florida is that OneWeb will be building its satellites there. Whether any are ever launched from Florida will depend on Virgin Galactic ever getting off the ground. Otherwise, most of these satellites will launch from French Guiana.

0 comments

Privately-built inflatable module installed on ISS

The competition heats up: Bigelow Aerospace’s BEAM inflatable module, built in only three years for a mere $17 million, was installed on ISS this past weekend.

BEAM will allow Bigelow and NASA to demonstrate the capabilities of the inflatable habitat on ISS. It is expected to perform for at least two years of testing on the Station, providing a key shake out of the technology that is likely to play a major role in human deep space exploration. β€œ(BEAM) will be a great way to test out the thermal characteristics of this new type of module, along with its radiation protection,” added Kopra. β€œIt’s going to be a neat thing.”

Following its test period, the SSRMS will remove the module from the Station before releasing it Nadir (Earth-facing). The module will eventually re-enter around a year later.

1 comment

Drone racing deal for ESPN

The success of competitive drone racing this year has resulted in a broadcast deal with ESPN.

ESPN’s new multi-year, international distribution deal will bring a number of races to television screens this year, beginning with the 2016 US National Drone Racing Championships on Governors Island, New York City, between August 5 and 7. This will be followed by the 2016 World Drone Racing Championships in October, which will attract pilots from more than 30 countries to the Kualoa Ranch private nature reserve in Hawaii for a share of $200,000 in cash prizes. Both events will be streamed live on ESPN3, and then packaged into one hour specials to be shown on the ESPN network thereafter.

3 comments

First test flight for Rocket Lab upcoming

The competition heats up: With ground testing of its second stage completed, the first test flight of Rocket Lab’s Electron rocket is expected before the end of the year.

They are getting their launch site in New Zealand up and running, are beginning qualification tests of Electron’s first stage, and if all goes as scheduled hope to begin commercial launches in 2017.

0 comments

The history of Falcon 9’s recoverable first stage

This is a beautiful short supercut of the history of SpaceX’s effort to develop a recoverable first stage. Hat tip Rand Simberg.

The video notes that it took less four years, from the first flight of Grasshopper to the first successful landing by a Falcon 9 first stage. This is the kind of pace I remember as a child in the America I grew up in. New ideas were fast and continuous, and things moved. I pray we are heading for a new renaissance where things will move again.

5 comments

Next Atlas 5 launch delayed again

In the heat of competition: ULA has once again suspended future Atlas 5 launches indefinitely while it investigates the launch anomaly during the Cygnus launch several weeks ago.

The problem involves the system that delivers kerosene fuel to the rocket’s Russian-made RD-180 first-stage engine. Bruno said he expects to know within the next few days which components are suspect. Engineers have not found anything in the processing of the rocket for that launch on March 22 that was different from any previously flown, Bruno added. β€œWe have a very good idea (of what the problem is), but we’re not quite done isolating it,” Bruno said. “I think in the next few days we should be able to say which components … we’re actually focused on.”

0 comments

McCain challenges ULA cost figures for new engine

Senator John McCain (R-Arizona), the head of the Senate Armed Services Committee, has questioned the cost numbers that ULA has given the government for replacing the Russian engines it uses in the first stage of its Atlas 5 rocket.

ULA has been trying to convince Congress to let it use those Russian engines indefinitely. McCain wants their use discontinued, now. The result: a battle of numbers.

The real bottom line has really nothing to do with the Russian engines, however. The real bottom line is the bottom line itself: ULA has to quickly develop a rocket that costs less to launch, or else they will lose all their business to SpaceX. Their use of these Russian engines now in the Atlas 5 is really irrelevant, in the long run.

0 comments

Vostochny’s past and future

Link here. The article provides an excellent overview of the problems at Vostochny as well as it future, even as the new Russian spaceport prepares for its first launch. Two key quotes:

During 2016, reports about mismanagement, non-payment of salaries and corruption persisted despite all the political scandals in 2015 and the Kremlin’s promises to resolve problems. In January, the Izvestiya daily reported the arrest of three leading engineers of the technical oversight directorate in Vostochny in a massive bribery investigation. Around the same time, the total amount of stolen federal funds from Spetsstroi was estimated at nearly 1.4 billion rubles, according to the Izvestiya.

However in February, a Moscow court ordered the release of former head of the Far-Eastern division of Spetsstroi, (known as Dalspetsstroi) Yuri Khrizman from prison to house arrest, apparently after prosecutors had failed to substantiate charges of unlawful spending of more than five billion rubles against him. Khrizman led construction at Vostochny until 2013 and, reportedly, had a reputation for excellence and integrity among his associates and subordinates. Since his arrest, at least one independent publication described the case against Khrizman as a misguided attempt to find a scapegoat in the hopelessly corrupt construction business. [emphasis mine]

And this:

[G]iven likely delays faced by new projects, Vostochny could see little use until the introduction of the launch pad for the Angara rockets, which was not expected until at least 2021.

Why does this all remind me so much of SLS and Orion? Both seem to be gigantic overpriced projects initiated by the government that are so expensive the government itself can’t afford to do much with them? At least in the U.S., we have one saving grace: the amount of corruption is significantly less.

0 comments

Falcon 9 first stage hoisted from barge

The competition heats up: The recovered first stage from last week’s Falcon 9 launch has been hoisted from the barge where it landed and is being prepared for testing prior to reuse.

The crane maneuvered the first stage on to a cradle, where ground crews were expected to complete procedures to β€œsafe” the rocket β€” a process which includes draining the vehicle of its toxic igniter fluid, disarming of its pyrotechnic destruct system, and removal of propellants and high-pressure gases. Some of the safing procedures were accomplished at sea before the rocket booster, which also includes the β€œinterstage” adapter to connect with the Falcon 9’s upper stage, arrived back on Florida’s Space Coast.

The rocket’s four landing legs will be removed or retracted, and then the booster will be rotated horizontal and loaded on a trailer for transport to a nearby SpaceX facility for inspections and a series of β€œstatic fire” engine tests.

The link has some good pictures of the operation and the stage.

1 comment
1 413 414 415 416 417 542