Bigelow announces four tourist bookings to ISS using Dragon

Capitalism in space: The private space station company Bigelow Aerospace announced yesterday that it has booked four tourists to spend from one to two months on ISS.

The bookings will fly to ISS using SpaceX’s Falcon 9 rocket and Dragon capsule. Though the company did not say how much these tourists have agreed to pay, it said that it intends to charge $52 million per ticket.

This announcement follows directly from NASA’s announcement last week that it will allow commercial tourist flights to ISS. Previously Bigelow had said it would fly tourists to its own space station using Boeing’s Starliner capsule. Now it is going to take advantage of NASA’s new policy to send the tourists to ISS, and it will use Dragon, probably because Dragon is closer to becoming operational.

I also suspect that Bigelow’s long term plans are to add its own hotel modules to ISS for these flights, and then later follow-up by building its own independent space station.

1 comment

SpaceX successfully launches 60 prototype Starlink satellites

Capitalsm in space: SpaceX this morning successfully launched 60 prototype Starlink satellites as the first part of their planned constellation of thousands of satellites designed to provide worldwide internet access.

The first stage, already used twice before, landing successfully on their drone ship. You can watch the launch here.

The leaders in the 2019 launch race:

7 China
6 SpaceX
4 Europe (Arianespace)
3 Russia
3 India

The U.S. now leads China 11 to 7 in the national rankiings.

4 comments

Justice charges man with falsifying inspection reports for rocket parts

The Justice Department has charged an employee of a company now out of business for falsifying inspection reports of rocket parts intended for use on both the Falcon 9 and Falcon Heavy rocket.

The complaint states that in January 2018, an internal audit by SQA Services, Inc. (SQA), at the direction of SpaceX, revealed multiple falsified source inspection reports and non-destructive testing (NDT) certifications from PMI Industries, LLC, for Falcon 9 and Falcon Heavy flight critical parts. SpaceX notified PMI of the anomalies. Source inspections and NDT are key tools used in the aerospace industry to ensure manufactured parts comply with quality and safety standards. Specifically, the signed source inspection report had a forged signature of the SQA inspector. SpaceX and SQA officials believed the signature of the inspector was photocopied and cut and pasted onto the source inspection report with a computer.

On February 16, 2018, the NASA Launch Services Program alerted the NASA Office of Inspector General (OIG), and Kennedy Space Center (KSC) Resident Agency, regarding the falsified source inspection reports and false NDT certifications created by PMI. Some of the false source inspection reports and false NDT certifications were related to space launch vehicle components that, at the time of discovery, were to be used for the upcoming Transiting Exoplanet Survey Satellite (TESS) mission, which launched from a SpaceX Falcon 9 rocket on April 18, 2018.

Based on this report, it appears that SpaceX identified the problem before launch and that none of the questionable parts ever flew.

8 comments

April parachute test for manned Dragon had problems

In testimony yesterday before Congress NASA’s chief of human spaceflight, Bill Gerstenmaier, revealed that during a test of the parachute system SpaceX will use on its manned Dragon capsule there was a problem.

The test appears to have occurred last month at Delamar Dry Lake in Nevada, where SpaceX was conducting one of dozens of drop tests it intends to perform to demonstrate the safety of its Crew Dragon spacecraft. This was a “single-out” test in which one of Dragon’s four parachutes intentionally failed before the test. “The three remaining chutes did not operate properly,” Gerstenmaier said.

…The test sled, Gerstenmaier confirmed, was “damaged upon impact with the ground.”

The cause of the failure, which might have been parachute design or a failure in the test equipment (such as the release from the airplane) is still being investigated.

This news, combined with the failure during Dragon thruster tests, also in April, likely guarantees that SpaceX will not launch in 2019. If it were up to SpaceX, I think they could get these issues dealt with and fly, but their customer is NASA, and NASA is notoriously slow at investigating and fixing engineering test problems like these.

My next post above underlines this conclusion.

0 comments

New Falcon 9 successfully launches used Dragon cargo ship

Capitalism in space: SpaceX has successfully launched a used Dragon cargo ship to ISS using a new Falcon 9 rocket.

They also successfully landed the first stage, the 39th time they have done so. Dragon will arrive at ISS in two days.

The leaders in the 2019 launch race:

6 China
5 SpaceX
4 Europe (Arianespace)
3 Russia

The U.S. has extended its lead over China 9-6 in the national rankings.

6 comments

ISS power repaired, SpaceX launch early tomorrow

Using the station’s robot arm astronauts on ISS have replaced a failed electrical component, restoring the station to full power and allowing a Dragon cargo launch to go forward early tomorrow morning.

The failure had reduced the station’s power by 25%. It also shut down some redundancy in the system that ran the robot arm that will grab and berth Dragon. NASA did not want to do that berthing without that redundancy, which they once again have.

The SpaceX launch is set for 3:11 am (eastern) tonight, or just past midnight on the west coast.

0 comments

Partial power outage on ISS today delays Dragon cargo mission

A partial power failure on the International Space Station has forced NASA to delay for at least two days the Dragon cargo mission that had been scheduled to launch early tomorrow morning.

The delay will allow time for NASA flight controllers at the Johnson Space Center in Houston to continue troubleshooting an issue with a distribution box in the space station’s electrical power system. Engineers detected an issue with the Main Bus Switching Unit on Monday morning, and ground teams plan to replace the component later this week, ahead of the SpaceX cargo launch. “Teams are working on a plan to robotically replace the failed unit and restore full power to the station system,” NASA said in a statement Tuesday. “The earliest possible launch opportunity is no earlier than Friday, May 3.”

The Main Bus Distribution Unit is one of several that routes power from the space station’s U.S. solar arrays to the research outpost’s electrical channels. The suspect unit distributes power to two of the eight electrical channels on the station, including a power supply for the space station’s robotic arm, which the station astronauts will use to capture the Dragon cargo craft as it approaches the complex.

While the robotic arm remains powered through a separate channel, NASA flight rules require redundant power supplies for the arm during critical operations, such as the grapple of a free-flying spacecraft.

Since the cargo Dragon freighter is berthed to the station using the robot arm, they want to get this fixed before launching Dragon. Right now the new launch date will occur no earlier than the wee hours of Friday, May 3.

0 comments

SpaceX gets NASA launch contract

Capitalism in space: One week after dropping its protest for losing the bidding competition for the Lucy asteroid mission, SpaceX has been awarded by NASA the launch contract for its Double Asteroid Redirection Test (DART) mission, set for launch in June 2021.

The $61 million launch price is significantly lower than past NASA contracts for Falcon 9 launches. NASA awarded SpaceX a contract for the Sentinel-6A satellite in October 2017 for a November 2020 launch on a Falcon 9 from Vandenberg at a total cost of $97 million. The Surface Water and Ocean Topography (SWOT) satellite will launch on a Falcon 9 in April 2021 under a contract awarded in November 2016 at a value of $112 million.

This low cost technology test mission, costing a total of $9 million, was initially going to be launch as a secondary payload. That NASA is now going to pay SpaceX for a full launch is most intriguing. It seems to me that there might be a bit of quid pro quo here. NASA wanted that protest dropped, and offered this launch to convince SpaceX to do that, as long as the launch cost was kept low. $60 million is really SpaceX’s standard price for Falcon 9 launch, using new boosters, but for NASA that is the least they’ve paid. How much more this is than what NASA would have paid to launch DART as a secondary payload is the real question.

1 comment

Russia cuts Proton price to match SpaceX

Capitalism in space: Dmitry Rogozin, the head of Roscosmos, yesterday said that Russia will cut costs so that the price they charge for a Proton launch will match SpaceX.

Russia is struggling to regain its Proton customer base after the launch failures of the past few years. I don’t think matching SpaceX’s prices will do it. Right now satellite companies view them as offering a less reliable product, and until they can prove this impression false they need to offer their rocket for even less that SpaceX.

This is in fact what SpaceX did at the beginning. Its rockets were untested and thus risky to use. To compensate they offered a cheaper way to space. Now Russia has to do the same, or the business will continue to go to others. I wonder if Rogozin understands this.

6 comments

Boeing delays unmanned test flight of manned capsule

According to this story today, Boeing has delayed from April to August its first unmanned test flight of its Starliner manned capsule. It has also delayed the first manned flight from August to November.

NASA refused to comment other to say it would announce new schedules next week. The article also stated this:

The initial April launch was ahead of a United Launch Alliance mission for the Department of Defense in June from the Cape Canaveral launch pad in Florida, so Boeing would have needed to clear the launch pad by the first week in May, one of the sources said, describing the pressure not just on technical issues but also launch schedules at Cape Canaveral.

I suspect the technical issues are related to Boeing’s need to do more tests of the attitude thrusters on Starliner following the leak that occurred in a test last summer.

I also hope that next week’s announcement will reveal a firming up of SpaceX’s schedule. By now they should have a good idea of when they can do their launch abort test reusing the Dragon capsule used during their successful first unmanned test flight in March. That will in turn allow them to firm up the launch date for the first manned flight.

0 comments
1 72 73 74 75 76 124