First flight of government-built hopper to test vertical landings delayed two years

Callisto's basic design
Callisto’s basic design

This story about a first stage government-built Grasshopper-type rocket designed to demonstrate and test vertical landing has instead become a perfect demonstration of why governments should not design, build, and own anything.

It appears the first test flight of the Callisto test rocket, first proposed in 2015 and being built by a joint partnership of the German (DLR), French (CNES), and Japanese (JAXA) space agencies, has now slipped from 2024 to 2026.

Earlier this month, CNES deployed a refreshed website. Prior to that deployment, the agency’s Callisto project page had stated that the rocket’s first flight would occur in 2024. The new Callisto project page has a more detailed timeline, stating that the detailed design phase will be completed by the end of 2024. Vehicle integration in Japan is then expected in 2025, followed by a first launch from the Guiana Space Centre between 2025 and 2026. This revision outlines an approximate two-year slip in the project’s timeline. [emphasis mine]

These three agencies took almost a decade to simply conceive and design the project. Apparently they not yet even built anything. This despite a budget of slightly less than $100 million carved out of the entire budget for creating the Ariane-6 expendable. Compare that with SpaceX, which conceived its Grasshopper vertical test prototype in 2011, began flying that year, and resulted in an actual Falcon 9 first stage landing in 2015.

Will Callisto ever fly? Maybe, but don’t expect it to produce a rocket that is financially competitive with SpaceX. Instead, expect these three government agencies to subsidize its cost in order to make its price competitive on the open market. More likely Callisto will fly a few times, but will likely result in no new orbital rocket. Instead it will be superseded by the private rocket startups worldwide that are now building actual orbital rockets and will likely make them reuseable before Callisto even leaves the ground.

3 comments

Boeing names new CEO, set to take over on August 8, 2024

Boeing today named a new CEO, Robert “Kelly” Ortberg, who among the candidates being considered appears to be the only one who did not have a long career at Boeing.

Ortberg emerged as a leading candidate only recently. Others who were reportedly considered for the job included Patrick Shanahan, a former Boeing executive and now CEO of its most important supplier, Spirit AeroSystems, and another longtime Boeing executive, Stephanie Pope, who recently took over the commercial airplanes division.

Ortberg led Rockwell Collins from 2013 to 2018, when it merged with United Technologies and wound up as part of RTX, the company formerly known as Raytheon. He retired from RTX in 2021.

He will take charge of the company as of August 8, 2024.

It remains to be seen if Ortberg can fix things. As the article notes, since 2019 Boeing has lost more than $25 billion, and has been saddled with numerous quality control failures in almost all its technical divisions, from building airplanes to providing maintenance to building space capsules. The failures in its airplane divisions resulted in several crashes that killed 346 people, and caused it to accept a deal with the Justice Department that included a fine of $243.6 million to avoid a criminal trial. That deal however has not yet been accepted by the judge in the case.

Ortberg will have to demonstrate somehow that the culture at Boeing itself has changed. The first thing he could do to indicate he is serious about doing so would be to shut down entirely Boeing’s Diversity, Equity, and Inclusion (DEI) bureaucracy. Getting rid of that poisonous race-based anti-quality program would go a long way in convincing others that Ortberg means business, and wants to put talent, skills, experience first in everything Boeing does, something previous CEOs have clearly not done.

10 comments

A review of Japan’s effort to create a commercial space industry

Link here. The article does a nice job outlining the efforts of the new startups in Japan that have been successful in flying missions, such as the orbital tug company Astroscale and the lunar lander company Ispace, as well as newer companies such as Shachu, which proposes building and selling modules for use on any one of the new commercial space stations under construction.

The article also talks at length about Japan’s newly created ten year $6.5 billion strategic fund, designed to be provide funding for many different commercial projects and inspired by NASA recent switch from being the designer, builder, and owner of everything to simply a customer buying products from the private sector.

The fund has been given to Japan’s space agency to administer, and it remains unclear whether that government agency is prepared to give up power to the private sector as NASA has. This quote illustrates this uncertainty:

Since the effort is just starting, both companies and JAXA are uncertain how well the fund will work. Yasuo Ishii, senior vice president of JAXA, said the agency has assigned 450 people to administer the fund, including researchers and other experts. “We used to be an R&D institution and now we’re a funder,” he said.

He said JAXA will closely monitor progress on the initial awards made through the fund. “If some don’t go well, we may terminate them.”

It seems JAXA is so far using this fund to establish a large bureaucracy for itself, rather than issuing contracts to the private sector to build things JAXA needs.

We shall see how this plays out. The Japanese aerospace industry appears to be similar to the American space industry around 2008, with lots of old established big companies working hand-in-glove with the government space agency and a lot of small startups trying to establish themselves as competitors. In the U.S. at that time NASA was very resistant to give contracts to the startups. It took strong political pressure from within the upper levels of government, first in the Obama administration and then in the Trump administration, to force a change at NASA. Whether this will happen in Japan remains unknown.

3 comments

China scientists propose both a communications and GPS-type infrastructure on the Moon

In line with the remarkably rational and long term plans China has developed for exploring the solar system, Chinese scientists have proposed the country develop both a communications and GPS-type infrastructure on the Moon, with both including constellations of satellites in orbit as well as facilities on the ground.

A first phase would establish satellites in elliptical frozen orbits around the moon. A second phase would see further … satellites and spacecraft at Earth-moon Lagrange points 1, 2, 4 and 5, a near-rectilinear halo orbit (NRHO), and a spacecraft in geostationary orbit, termed a cislunar space station.

A third and final phase would add satellites in existing and new distant retrograde orbits (DRO), forming a near-moon space and extended space constellations. The system also includes comprehensive ground-based facilities.

While this plan is simply a proposal, it fits with China’s overall strategies for lunar exploration, all of which are designed carefully so that they can be scaled up for more complex operations there as well as elsewhere in the solar system. And based on China’s track record in space in the past decade, we should be entirely confident this program or some variation will be built.

That is, unless China undergoes a major economic collapse and a change in leadership that has different priorities.

6 comments

ULA completes its 4th launch this year and last Atlas-5 launch for the Space Force

Though ULA’s Atlas-5 rocket still has a number of launches on its manifest before it is retired, early this morning the company successfully completed the last Atlas-5 launch for the Space Force, the rocket lifting off from Cape Canaveral in Florida.

This was ULA’s fourth launch in 2024, the most in a year for the company since 2022. The leader board for this year’s launch race remains unchanged:

74 SpaceX
31 China
8 Rocket Lab
8 Russia

American private enterprise however now leads the rest of the world combined in successful launches 87 to 47, while SpaceX by itself still leads the entire world combined, including American companies, 74 to 60.

Note: A Rocket Lab that had been scheduled for today has been delayed two days.

6 comments

Meandering Martian ridges flowing down from crater rim

Meandering Martian ridges
Click for original image.

Cool image time! The picture to the right, rotated, cropped, reduced, and enhanced to post here, was taken on February 9, 2024 by the high resolution camera on Mars Reconnaissance Orbiter (MRO). It shows a good example of the typically rough region inside the southern cratered highlands of Mars.

Note the ripple dunes that fill the low areas. The volcanic ash from Mars’ past volcanic history has become trapped here, with those ripple dunes suggesting the direction of the prevailing winds to the southeast.

The bright areas also suggest there is interesting mineralogy just below the surface. The 100-foot-high mesa near the picture’s top suggests a lot of erosion has occurred here, with its top suggesting the elevation of the surface a long time ago.

The most interesting feature however is the meandering ridge that starts at the lower right and weaves to the upper left.
» Read more

3 comments

FAA releases proposed environmental assessment of Boca Chica permitting more Starship/Superheavy launches

Superheavy/Starship lifting off on March 14, 2024
Superheavy/Starship lifting off on March 14, 2024

In advance of several planned public meetings, the FAA today released [pdf] its proposed environmental assessment of SpaceX’s proposal to increase the number of orbital launches allowed per year from Boca Chica from 5 to 25.

The report makes for some fascinating reading. First and foremost it indicates the FAA’s general approval of this new launch cadence. That approval however must also be given by the public in comments at those meetings, as well as by the National Park Service (NPS), U.S. Fish and Wildlife Service (USFWS), the U.S. Coast Guard (USCG), and the National Aeronautics and Space Administration (NASA). Expect serious objections from the NPS and USFSW, both of which have acted to slow or stop SpaceX in the past, when each was given the opportunity. Both have a new opportunity here.
» Read more

5 comments

Senate gives NASA cash to stop its tantrum

Surprise, surprise! As expected after NASA proposed major cuts in several missions, such as the Chandra Space Telescope and the OSAM demo robotic refueling mission, the subcommittee of the Senate Appropriations Committee has rejected those cuts and instead proposed that NASA not only get everything it asked for, it be forced to take more money than it requested.

I am certain that NASA is not going to complain, as this was its plan from day one. The cancellation of Chandra was intended as a toddler’s tantrum that our weak Congress was certain to bow to and come up with the cash. It has now done so.

The report directs NASA to spend at least $98.3 million on Hubble and up to $72.1 million on Chandra, similar to the budgets for those missions in recent years, emphasizing the ability of the telescopes to work in conjunction with the James Webb Space Telescope.

In this case the Senate action makes some sense, as these cuts would have been penny wise and pound foolish. But NASA knew that. If the Senate was really interested in controlling the budget (which it is not) it would have funded Chandra and Hubble as described, but demanded cuts from NASA elsewhere.

Instead the Senate committee not only demands that these telescopes be maintained, it doles out extra money the nation doesn’t have for other projects that NASA wanted to cut for entirely legitimate reasons. OSAM for example was conceived more than a decade ago as a mission designed to demonstrate robotic refueling in space. After spending a billion and a decade, it had still not flown, and during that time private companies had not only successfully demonstrated this capability several times for far less, they had done so in a far simpler and more profitable manner. The technical need for OSAM was gone. Why spend the additional billion we can’t afford for a project that will prove nothing?

Congress, especially the Senate, likes wasting money however, and so the appropriations committee in an entirely bi-partisan effort is pushing to revive OSAM, as well as several other projects that have either gone over budget or NASA had deemed correctly were unaffordable.

The dark age has already begun in many ways, but its official start will be marked by future historians by the date the United States undergoes a full financial collapse, due to its government’s unwillingness to rein in a national debt that is now in the many many trillions and growing uncontrollably each day.

3 comments

Boeing completes full series of static hot fire engine burns on Starliner while docked to ISS

Boeing announced today that engineers have successfully completed a full series of static hot fire engine burns testing all of Starliner’s attitude thrusters while still dockecd to ISS.

The one-pulse firings were designed to confirm the performance of each thruster. Aft-facing thrusters were fired for 1.2 seconds and all others for .40 seconds. Between each firing, the team reviewed real-time data and all thrusters performed at peak thrust rating values, ranging from 97-102%. The helium system also remained stable. Additionally, an RCS oxidizer isolation valve that was not fully seated previously, was cycled several times during today’s testing and is now operating normally.

This is the second time the spacecraft has been hot fired successfully while docked, an integrated operation the station and Starliner teams will also conduct during future long-duration missions.

This result is not a surprise, based on the information provided during the most recent briefing. It confirms the data obtained during previous hot fire tests both on a Starliner on the ground and the Starliner docked to ISS. Not only does it appear that Boeing has enough information to fix this problem so it does not occur again, it has proven unequivocally that these thrusters as well as the helium leaks inside the thruster systems pose no unusual risk for a return in the capsule.

NASA and Boeing have a planned review of these results this coming week, when we should expect them to name a return date, likely sometime in the first two weeks of August.

4 comments

SpaceX launches another 20 Starlink satellites

I had my days wrong last night. In the previous post I said that SpaceX had another launch scheduled for later tonight. In actuality that launch was today, but in the wee hours early this morning. Four hours after a Falcon 9 placed 23 Starlink satellites into orbit from Cape Canaveral, another Falcon 9 placed 20 Starlink satellites into orbit from Vandenberg in California. That’s three launches in just one day.

The first stage completed its seventeenth launch, landing on a drone ship in the Pacific.

The leaders in the 2024 launch race:

74 SpaceX
31 China
8 Rocket Lab
8 Russia

American private enterprise now leads the rest of the world combined in successful launches 86 to 47, while SpaceX by itself leads the entire world combined, including American companies, 74 to 59.

0 comments

SpaceX launches another 23 Starlink satellites

SpaceX tonight completed its second launch in two nights since resuming launches after a two-week halt after the July 11th upper stage launch failure, its Falcon 9 rocket lifting off from Cape Canaveral and placing another 23 Starlink satellites in orbit.

The first stage completed its fourteenth launch, landing on a drone ship in the Atlantic.

The leaders in the 2024 launch race:

73 SpaceX
31 China
8 Rocket Lab
8 Russia

American private enterprise now leads the rest of the world combined in successful launches 85 to 47, while SpaceX by itself leads the entire world combined, including American companies, 73 to 59.

SpaceX has another launch scheduled for tomorrow night.

2 comments

Local billionaire landowner renews his oppposition to the Sutherland spaceport

Proposed spaceports surrounding Norwegian Sea
Proposed spaceports surrounding Norwegian Sea.

An effort by the proposed Sutherland spaceport on the north coast of Scotland to place a tracking dish on a nearby peak — where other telecommunication dishes are already installed — is now being fought by local billionaire landowner Anders Holch Povlsen, who had previously tried and failed to stop construction of the spaceport entirely.

The spaceport’s main customer, the rocket startup Orbex, has already experienced endless red tape from the United Kingdom’s Civil Aviation Authority (CAA). It applied for a launch license in February 2022, and almost two-and-a-half years later still has not gotten an approval. It had previously announced a first launch that year, and has been stymied since, not only by the CAA but by local authorities who have demanded it make many changes to its construction plans.

Povlsen, who has himself invested in the competing Saxavord spaceport on the Shetland Islands, has repeatedly acted to block Sutherland, so far with no success. This new suit is especially absurd — claiming the new dish would harm the local landscape — which is why the local councils appear ready to reject it.
» Read more

2 comments
1 212 213 214 215 216 1,328