Rocket startup Stoke Space completes static fire test of first stage engine

Stoke's Nova rocket
Stoke’s Nova rocket

The rocket startup Stoke Space revealed yesterday that it has completed a static fire test of the first stage engine it will use on its Nova rocket, shown in the graphic to the right.

The test, which was not the first for this engine, proved out several new technologies.

Stoke Space called the test significant for several reasons. It’s the first hotfire of the company’s Block 2 (flight layout) stage 1 engine, and this engine architecture — called full-flow staged combustion (FFSC) — is considered particularly challenging. Only two entities in the world — Stoke and SpaceX — have successfully developed FFSC engines. … Stoke’s stage 1 engine is a liquified natural gas/liquid oxygen engine capable of producing 100,000 pounds of thrust. The duration of the test was not revealed.

It was the first time Stoke has tested on its new vertical test stand in Moses Lake. The company’s testing philosophy is that you must “test like you fly,” and it believes vertical testing is key to engine development.

Nor is the first stage engine the only technological innovation. Nova’s second stage uses a radical design whereby the engine releases its thrust through a ring of small nozzles on the outside perimeter of the stage, rather than a single central nozzle. This design is what the company hopes will allow it to return that upper stage intact for reuse.

The four year old company has raised $100 million in investment capital, but has also faced environmental red tape from the Space Force for its launch facility at Cape Canaveral. It had previously targeted 2025 for the first test flights of Nova, but that schedule appears unlikely because of this red tape.

1 comment

The next two Vulcan launches for the Pentagon slip to 2025

Both the Space Force and ULA have now admitted that the next two Vulcan launches, which both had hoped to launch before the end of this year, have now been delayed until 2025, and that Vulcan remains uncertified as yet by the military for its launches.

The United Launch Alliance’s Vulcan will not be able to conduct two planned national security missions on its launch manifest for this year after delays with certifying the heavy-lift rocket. The comments came hours after a Space Force official cast doubt that the missions could be completed before the end of 2024.

ULA launched its second certification flight in October, roughly a month behind schedule, following a first flight in January that was nearly four years behind schedule. The Space Force is still assessing data from the October launch in partnership with ULA.

The military had said if ULA completed two Vulcan successful launches it would approve Vulcan for these launches. Though the second launch got its payload to its correct orbit, during launch the nozzle on one of its strap-on solid-fueled boosters fell off. Though officials keep saying they expect certification anyway, that certification has not happened. It appears right now that the military won’t do so until the investigation into the problem is completed and a fix is installed.

At the moment the only rocket company that can launch large payloads for the Pentagon is SpaceX. Though that company has not gouged the military in bidding (though it it could) this is not a good situation. The military wants options and redundancy, not simply to save money, but to give it flexibility. It needs ULA and Blue Origin to finally deliver their rockets.

2 comments

ULA begins stacking Vulcan for military launch, anticipating Pentagon approval

Though the Space Force is still reviewing the nozzle issue on the second flight of ULA’s Vulcan rocket and has not yet certified the rocket for military operational launches, ULA has begun stacking the next Vulcan for an anticipated military launch of a national security satellite.

On Monday [October 21], ULA shared photos of the 109.2-foot-long (33.3 m) booster being hoisted into the Vertical Integration Facility to begin the stacking process. In the days and possibly weeks to come, the 38.5-foot-long (11.7 m) Centaur 5 upper stage will be added along with four solid rocket boosters and the payload fairings.

It appears that the military has accepted Vulcan for this launch because — despite the nozzle falling off of
a strap-on side booster — the rocket was successful in placing its payload in its precise orbit. The Space Force is simply completing the paperwork required for certification.

No date however has been set, but the company hopes to complete two military Vulcan launches in 2024, so it won’t be that far in the future.

7 comments

Space Force awards SpaceX big launch contract

Space Force yesterday awarded SpaceX a $733 million contract for what appears to be a total of eight future launches of military and national security payloads.

Few details were released about the payloads, including the launch timeline. The deal was issued as part of the military launch contracting system, which in June named SpaceX, ULA, and Blue Origin as its launch providers for the next five years.

However, one official’s comment appeared to suggest this contract award was the military’s expression of disgust at the delays at ULA and Blue Origin in getting their rockets launchworthy.

“In this era of Great Power Competition, it is imperative to not leave capability on the ground,” Brig. Gen. Kristin Panzenhagen, program executive officer for Assured Access to Space, said in an emailed statement on Friday. “The Phase 3 Lane 1 construct allows us to execute launch services more quickly for the more risk-tolerant payloads, putting more capabilities on orbit faster in order to support national security,” Panzenhagen added. [emphasis mine]

In other words, the Space Force wanted to split this contract between the three companies, but it decided to give it all to SpaceX because it expected any launches given to ULA and Blue Origin would not launch on time, and it didn’t want “to leave [that] capability on the ground.”

In the case of ULA, its Vulcan rocket finally made its first two launches this year, four years late, but on the second launch had a failure on one of its solid-fueled strap-on boosters (the nozzle fell off). Though the rocket successfully placed its dummy payload into the correct orbit, the military has either decided that it can’t yet certify Vulcan for military launches, or sees further delays while the investigation and fixes are installed.

As for Blue Origin, its New Glenn rocket is also four years behind schedule, and likely won’t launch until next year. To get it certified will also probably require two launches, and since that company never seems to be in a hurry to do anything (NASA removed its payload from New Glenn’s first launch because the company had failed to meet the required interplanetary launch window), the Pentagon probably decided it can’t give it any contracts at this time.

And so, more launches and profits for SpaceX. While it is great for that company, with revenue that will likely aid in developing Starship/Superheavy, this is not a healthy situation for the American space industry. As a nation we need more than one launch provider. We need these other companies to stop dithering around and get the job done. That’s the true American way. Have they forgotten how to do it?

14 comments

Musk says SpaceX will sue California Coastal Commission

In a tweet on X on October 12, 2024, Elon Musk said that SpaceX will sue the California Coastal Commission for violating his first amendment rights as soon the court opens tomorrow.

“Filing suit against them on Monday for violating the First Amendment,” he wrote, adding: “Tuesday, since court is closed on Monday.”

At least two commissioners had made it very clear in public statements at a hearing last week that they were voting against a Space Force request that would increase the number of launches at Vandenberg because they opposed Elon Musk’s political positions, not because the request would do any harm to the coast. The commission then rejected the request 6-4, with others claiming that SpaceX should have made the request directly rather than have the Space Force do it.

The vote remains non-binding, as the Space Force has the legal power to do whatever it wants at Vandenberg, and only works with the commission as a courtesy.

2 comments

California officials: SpaceX shouldn’t be allowed to launch from Vandenberg because we hate Elon Musk

In voting yesterday to reject a plan by the military to increase the number of launches at Vandenberg Space Force Base in California, members of the California Coastal Commission admitted openly they did so because they do not like Elon Musk and his publicly stated political preferences.

The California Coastal Commission on Thursday rejected the Air Force’s plan to give SpaceX permission to launch up to 50 rockets a year from Vandenberg Air Force Base in Santa Barbara County.

“Elon Musk is hopping about the country, spewing and tweeting political falsehoods and attacking FEMA while claiming his desire to help the hurricane victims with free Starlink access to the internet,” Commissioner Gretchen Newsom said at the meeting in San Diego.

…“I really appreciate the work of the Space Force,” said Commission Chair Caryl Hart. “But here we’re dealing with a company, the head of which has aggressively injected himself into the presidential race and he’s managed a company in a way that was just described by Commissioner Newsom that I find to be very disturbing.”

It must be noted that this vote is not legally binding on the military. Though it has always tried to work in cooperation with this commission, it has the right to decide for itself how many launches it wants to allow out of Vandenberg. Whether it will defy the commission however is uncertain, and likely depends entirely on who wins the presidential election. If Harris wins, she will likely order the Space Force to not only obey the commission but to further limit launches by SpaceX at Vandenberg. If Trump wins, he will likely tell the Space Force to go ahead and expand operations, ignoring the immoral political machinations of these commissioners.

And it must be emphasized how immoral and improper these commissioners are. Their task is to regulate the use of the California coast in order to protect it for all future users, from beach-goers to rocket companies. It is not their right to block the coast’s use to certain individuals simply because those individuals have expressed political views they oppose. Not only does this violate Musk’s first amendment rights, it is an outright abuse of power.

If anyone in California reading this article wishes to tell these commissioners what they think of their actions yesterday, you can find their contact information here.

27 comments

Rocket startup Stoke Space is saddled with the same red tape as SpaceX

Stoke's Nova rocket
Stoke’s Nova rocket

We’re from the government and we’re here to help you! The rocket startup Stoke Space appears to be struggling with the same kind of environmental red tape that is hindering SpaceX, though in Stoke’s case the red tape appears absurdly unnecessary.

Stoke is the only company besides SpaceX developing a rocket with both its first and second stages returning to Earth to land vertically and then be reused. Unlike SpaceX Starship/Superheavy, which is gigantic and revolutionary in all ways, Stoke’s Nova rocket is comparable in size to the hundreds of rockets that have launched from Florida since the 1960s. Based on that six-decade track record, it would seem that getting rights to launch Nova (but not for its return) would be considered basic and routine, requiring little complex bureaucracy.

Hah! Fooled you!

Before any of this can take place, the Space Force must complete its “environmental assessment” of the company’s plans at LC-14 [the launchpad used for John Glenn’s first orbital mission and many others subsequently], in order to evaluate how repeat launches will affect local flora and fauna. These assessments are mandatory under federal law, and they can often take months — but the upside is that they provide a closer look at a company’s operational plans.

» Read more

7 comments

SpaceX launches two broadband satellites for the Space Force and Norway

SpaceX tonight successfully launched two broadband satellites, its Falcon 9 rocket lifting off from Vandenberg in California.

The satellites will provide improved broadband service in the Arctic regions for both the Space Force and Norway, which partnered with Northrop Grumman to build the satellites.

The Falcon 9 first stage completed its 22nd flight, tying the record of one other booster for the most reuses. It landed on a drone ship in the Pacific.

The leaders in the 2024 launch race:

79 SpaceX
33 China
10 Rocket Lab
8 Russia

American private enterprise now leads the rest of the world combined in successful launches 94 to 49, while SpaceX by itself still leads the entire world combined, including American companies, 79 to 64.

0 comments

ULA completes its 4th launch this year and last Atlas-5 launch for the Space Force

Though ULA’s Atlas-5 rocket still has a number of launches on its manifest before it is retired, early this morning the company successfully completed the last Atlas-5 launch for the Space Force, the rocket lifting off from Cape Canaveral in Florida.

This was ULA’s fourth launch in 2024, the most in a year for the company since 2022. The leader board for this year’s launch race remains unchanged:

74 SpaceX
31 China
8 Rocket Lab
8 Russia

American private enterprise however now leads the rest of the world combined in successful launches 87 to 47, while SpaceX by itself still leads the entire world combined, including American companies, 74 to 60.

Note: A Rocket Lab that had been scheduled for today has been delayed two days.

6 comments

Space Force adds Stoke Space and Blue Origin to its list of smallsat launch companies

The Space Force has now added rocket startups Stoke Space and Blue Origin to its list of launch companies who are now approved to bid on launches of the military’s small satellites.

The two firms join 10 other vendors in the OSP-4 pool: ABL Space Systems, Aevum, Astra, Firefly Aerospace, Northrop Grumman, Relativity Space, Rocket Lab, SpaceX, United Launch Alliance (ULA), and X-Bow.

This program is designed for launches that are not critical and can be used to help new rocket companies, while also encourage all the companies to move more quickly, as the contracts are designed to be require a launch within 12 to 24 months after award, and sometimes much sooner. For example, several recent Firefly launches required the company to deliver the payload to the assembly building and get it mounted in less than a few days, and to do so only when told by the military.

This military smallsat launch program is also wholly different than the Space Force’s large payload launch program, which presently only allows SpaceX, ULA, and Blue Origin to bid on launches. With both programs however it appears the military is no longer limiting the companies that can bid to as small a number as possible — which had been its policy for the first two decades of this century — but instead is eagerly expanding the number over time to increase competition and its own options. With the large payload program the Pentagon intends to revisit its list yearly to widen it as new companies mature.

6 comments

ULA replaces Sierra’s mini-shuttle with dummy payload to launch Vulcan in September

Because of continuing delays in preparing Sierra Space’s Tenacity Dream Chaser mini-shuttle for launch, ULA has been forced to remove it from the second launch of Vulcan in order to proceed with the launch in September as planned.

ULA needs to launch Vulcan for the second time and as soon as possible in order to get approval from the Pentagon to do military launches. The delays in getting Tenacity ready for launch has already impacted that schedule, as ULA had originally hoped to launch Vulcan on its second flight — with Tenacity as the payload — several months ago. Further delays beyond September would seriously damage not only ULA’s bottom line, but the military’s own needs. It is all for these reasons that ULA has now set up a new review team to force this schedule forward, likely under pressure from the Pentagon.

Sierra Space meanwhile says that Tenacity is still on track to be ready to launch before the end of the year, but it is unclear what rocket will carry it. ULA will likely offer another Vulcan rocket for the purpose, but to do so it will probably have to delay some other payload, and it is certain it will not do that to any upcoming military launches. Based on the announced launch schedule, it does not look like this launch can occur on a ULA rocket in 2024. ULA says it hopes to launch at least 20 times in 2025, so one of those launches will likely carry Tenacity.

1 comment

Space Force names SpaceX, ULA, and Blue Origin as its launch providers for the next five years

As part of the military’s program for issuing launch contracts, the Space Force yesterday announced that it has chosen SpaceX, ULA, and Blue Origin as its launch providers, allowing them to bid on $5.6 billion worth of planned launched over the next five years.

The NSSL Phase 3 program was structured into two “lanes.” Lane 1 is for less demanding launches to low Earth orbit, while Lane 2 is reserved for heavy lift rockets capable of delivering payloads to nine reference orbits, including some of the most demanding national security missions.

The selection of Blue Origin, SpaceX, and ULA for Lane 1 contracts confirms that no other launch providers met the criteria. Seven bids were submitted, according to the DoD announcement.

The Space Force apparently rejected the other four unnamed companies because they “are still maturing their launch capabilities.” It will allow them to re-submit applications next year, and could approve others for bidding at that time, which is a major change from past policy. Previously the military would name approved companies, but not reconsider others for years, a policy that limited its options and reduced competition. Now it appears it will be doing so frequently, possibly every year, in order to regularly increase the number of companies that can bid on military contracts.

This change is excellent news for the American launch industry, as it means the Pentagon has finally ended its long standing launch policy that played favorites.

4 comments
1 3 4 5 6 7 14