Comparing the price of Falcon 9 with the Atlas 4.

Comparing the price of the Falcon 9 with the Atlas 4.

Today’s launch was conducted aboard the β€œplain Jane” version of the Atlas V, the 401, which has no strap on boosters, a single upper stage engine and a 4 meter fairing. It was originally awarded to Lockheed Martin Commercial Launch Services in 2007 for a $124 million fixed fee contract. By contrast the first NASA science launch awarded to the SpaceX Falcon 9, that of the Jason -3 satellite for 2014, was for $82 million. With current pricing for similarly equipped Atlas V 401 vehicles for NASA launches at roughly $150 million, based on awards from 2011, the difference is hardly trivial.

In other words, Falcon 9 is almost half the price. No wonder satellite companies are flocking to buy a launch on it.

8 comments

How the Bigelow module added to ISS will change the space equation.

How the Bigelow module added to ISS will change the space equation.

Looking a bit further down the road, the potential launch of a Bigelow BEAM module, particularly if it takes place on a SpaceX Falcon 9 booster could be a harbinger of much greater things to come. As Mars visionary Robert Zubrin and many others have observed, the addition of an inflatable module similar to that being considered for the station, to the SpaceX Dragon 2.0 capsule greatly increases the available space and capability of a future Dragon to serve both as a Mars transfer vehicle, and / or surface habitat. Add in the introduction of Falcon Heavy, and the pieces for an alternate vision of far more affordable (and timely) inner system exploration begin to fall into place.

Stewart Money has it exactly right. I have never accepted the claim that Orion was the only spacecraft being built that would be capable of going beyond low earth orbit. Add the right components to any manned vehicle, and you have an interplanetary spaceship.

The trick of course is adding the right components. For both Orion and Dragon, the present assumptions are much too nonchalant about what those components are. For humans to prosper on an interplanetary mission, the vessel requires a lot more than a mere capsule and single module.

1 comment

An official of SpaceX announced today that the company plans on its first manned launch by 2015, and that the astronauts will be its employees, not NASA’s.

The competition heats up: An official of SpaceX announced today that the company plans on its first manned launch by 2015, and that the astronauts will be its employees, not NASA’s.

Back when the shuttle program was still alive and NASA astronauts could have applied political pressure to keep it running, some said they should, if only to save their jobs. They did not, and instead toed the party line and supported the shuttle’s retirement even though no replacement was even close to being operational.

How’s that working out for you, guys, eh?

The truth is that there is no justification any longer for the astronaut corp at NASA. They have no vehicle, and any future space vehicle is going to be built and operated by others who will chose their own pilots.

13 comments

It appears that SpaceX and Orbcomm have finalized their launch agreement.

The competition heats up: It appears that SpaceX and Orbcomm have finalized their launch agreement.

On December 21, 2012, ORBCOMM Inc. (Nasdaq: ORBC) and Space Exploration Technologies Corp. (SpaceX) entered into a Launch Services Agreement pursuant to which SpaceX will provide launch services for the carriage into low-Earth-orbit of up to 18 ORBCOMM second-generation commercial communications satellites currently being constructed by Sierra Nevada Corporation.

The agreement schedules the launches for sometime between the second quarter of 2013 and the second quarter of 2014, subject to normal scheduling changes.

This is a strong endorsement by Orbcomm of SpaceX’s Falcon 9 rocket, despite the engine problem which prevented an Orbcomm prototype satellite from reaching its correct orbit on the last Falcon 9 launch. Also, note that Sierra Nevada is building the satellites, thereby giving that company a firm foundations while it also builds its Dream Chaser manned spacecraft.

2 comments

SpaceX’s Grasshopper rocket successfully did a vertical take off and landing to a height of 130 feet last week.

SpaceX’s Grasshopper rocket successfully did a vertical take off and landing to a height of 130 feet last week. With video.

This is very cool engineering, but I remain skeptical any first stage rocket could carry enough fuel to both return to Earth vertically and also provide its payload enough thrust to get into orbit.

13 comments

SpaceX has pinpointed the cause of the Falcon 9 engine shutdown during its October 7 Dragon launch.

SpaceX has pinpointed the cause of the Falcon 9 engine shutdown during its October 7 Dragon launch.

At the moment, however, they are not telling anyone what that cause is. They are telling us that the next Dragon launch is going to happen in late February or early March, which is slightly earlier than previous reports.

0 comments

The Pentagon has decided to buy its launch services from more than just Boeing and Lockheed Martin.

The competition heats up: The Pentagon has decided to buy its launch services from more than just Boeing and Lockheed Martin.

Under the new plan, the Air Force can buy as many as 14 launches over the next five years from possible bidders such as Space Exploration Technologies Corp, or SpaceX, and Orbital Sciences Corp . The service may also buy as many as 36 launches from United Launch Alliance, the Lockheed-Boeing venture, with an option to purchase the other 14 launches if the competitors haven’t been certified to launch military and spy satellites that can cost up to $1 billion each.

Originally the military planned to purchase all of its launches from Boeing and Lockheed. Political pressure from SpaceX has now forced them to widen the competition, or at least, make noises that they are doing so. If you read the above paragraph closely the plan still favors the original two companies and is strongly stacked to hand all the launches over to them anyway.

Update: My pessimism above was premature. SpaceX has been awarded a contract for two launches under this new policy.

1 comment

SpaceX and Stratolaunch have parted ways.

SpaceX and Stratolaunch have parted ways.

In the original plan, Stratolaunch would build the first stage, the biggest airplane every built, which would lift the second stage, SpaceX’s Falcon 9, into the air. It appears, however, that the modifications required to make the Falcon 9 work in this configuration were not in SpaceX’s interest, so the company backed out and Stratolaunch has instead made a deal with Orbital Sciences to provide the second stage rocket.

2 comments

SpaceX’s launch manifest for 2013 included three commercial launches in addition to its cargo flights to ISS.

SpaceX’s launch manifest for 2013 includes three commercial launches in addition to its cargo flights to ISS.

All told, it appears that 2013 will a crucial year for SpaceX. They first need to solve the question of that engine failure from their October Falcon 9 launch. Then they need to begin putting into orbit the long list of private satellites that they have contracts for but have held off launching pending the success of the NASA deal. Once they do that, set to begin next year, they will have proven – beyond a shadow of a doubt — that they are for real.

And on that subject, Elon Musk had some thoughts yesterday about his European competitors: “Europe’s rocket has no chance.”

SpaceX’s Falcon is a new entrant to the launcher market. It has so far made only four flights, but it has a backlog already of more than 40 contracted launches. Its quoted price under $60m per flight is proving highly attractive to satellite operators who have to pay substantially more to get on an Ariane. “Not only can we sustain the prices, but the next version of Falcon 9 is actually able to go to a lower price,” warned Mr Musk. “So if Ariane can’t compete with the current Falcon 9, it sure as hell can’t compete with the next one.”

0 comments

It appears that NASA is at the moment unconcerned should the investigation into the Falcon 9 engine failure on October 7 cause a delay in the next Dragon supply mission to ISS.

It appears that NASA is at the moment unconcerned should the investigation into the Falcon 9 engine failure on October 7 cause a delay in the next Dragon supply mission to ISS.

The supply cache delivered to the station in early to mid-2011 by the now-retired space shuttle placed the six-person orbiting science lab on a firm footing well into 2013, according to Mike Suffredini, NASA’s space station program manager. β€œThe launch date itself, in January, is not really critical to the program from a supply standpoint,” Suffredini told an Oct. 26 news briefing. β€œSo we have some flexibility.”

In the short run a delay here would not be critical. A long delay, which is unlikely, would however not be good for operations on the station, and illustrates why it is very important to get the Orbital Sciences’ Cygnus cargo capsule up an running as soon as possible.

1 comment

Faced with stiff competition in the launch market, Europe struggles to come up with a competitive replacement for Ariane 5

Faced with stiff competition in the launch market, Europe struggles to come up with a competitive replacement for Ariane 5

β€œI strongly believe we have to decide, as quickly as possible, to develop a new-generation launcher to be competitive in the market as it is forecast, and with the competitors,” [ESA Director General Jean-Jacques] Dordain said at the Berlin air show last month, a reference to new launch vehicle developments in India, China and the U.S., where Space Exploration Technologies’ low-cost Falcon 9 is challenging the global launcher market.

While space cadets might argue about launch prices till the cows come home, the actual competitors in the industry know better: SpaceX’s low prices are real and are forcing everyone to find ways to lower costs or lose business.

1 comment
1 133 134 135 136 137 142