FAA lists possible launch windows for Starship/Superheavy launch

Though it as yet not issued a launch permit, the FAA has now released an advisory to the public, listing the possible launch windows for the next Starship/Superheavy launch, beginning on March 14, 2024 and including windows on each day through March 18th.

The advisory lists a primary date of Thursday, March 14, with the time 12:00Z-14:13Z (7 a.m. to 9:13 a.m. central). The plan also includes backup dates for the following four days, with the window closing at 8:01 a.m. on Saturday and Sunday before increasing to 9:13 a.m. again on Monday.

It is very possible this advisory is premature. It does strongly suggest however that the FAA is about to issue the launch licence. Based on past actions, expect that license to be announced as close to the launch date as reasonably possible, in order to make difficult or impossible any legal action to stop it by the various independent activist groups that have been suing both SpaceX and the FAA. (While the FAA has clearly been ordered by higher-ups in the Biden administration to slow-walk SpaceX’s effort, its people generally want SpaceX to succeed.)

If the first launch attempt will be on March 14th, two days hence, that license licence must be issued soon.

2 comments

SpaceX: We want to fly next Starship/Superheavy test launch on March 14, 2024

In a tweet yesterday SpaceX announced an update on its Starship webpage, outlining its plans for the third orbital test launch of its heavy-lift Starship/Superheavy rocket, with March 14, 2024 listed as the hoped-for launch date.

The update began with these cautionary words, “pending regulatory approval,” and then went on to describe details of the test flight:

The third flight test aims to build on what we’ve learned from previous flights while attempting a number of ambitious objectives, including the successful ascent burn of both stages, opening and closing Starship’s payload door, a propellant transfer demonstration during the upper stage’s coast phase, the first ever re-light of a Raptor engine while in space, and a controlled reentry of Starship. It will also fly a new trajectory, with Starship targeted to splashdown in the Indian Ocean. This new flight path enables us to attempt new techniques like in-space engine burns while maximizing public safety.

I suspect the change in the splashdown location, from northeast of the main island of Hawaii, was instigated by the FAA for those “public safety reasons”. From SpaceX’s perspective, this is an easy give, as a slightly shorter flight makes little difference for this test, and it allows the company to test that Raptor engine by firing that de-orbit burn.

Will the flight occur on March 14th? The odds are high, partly because this SpaceX announcement is designed to put pressure on the bureaucrats at the FAA to finish their paperwork already. At the same time, bureaucrats sometimes love to stick it to private citizens, just for fun. We shall see.

7 comments

SpaceX almost completes dress rehearsal countdown of Starship/Superheavy

According to a tweet from SpaceX, the company yesterday conduceted a dress rehearsal countdown of Starship/Superheavy, ending the rehearsal at T-10 seconds so that no static fire test of Superheavy’s engines occurred.

Starship completed its rehearsal for launch, loading more than 10 million pounds of propellant on Starship and Super Heavy and taking the flight-like countdown to T-10 seconds.

Prior to all its launches SpaceX routinely does this kind of rehearsal, but always ends them at T-0 and a short engine burst. That it did not do so here suggests either some issue prevented it, or the company was doing tests of its propellant loading procedures. Either way, it is likely another dress rehearsal countdown will be required before the actual test flight can occur.

I also suspect the FAA is involved in this in some way, demanding certain actions by SpaceX before the agency issues the launch license. At the moment there is no word when that license will be issued, though Elon Musk keeps saying on X that it is coming “soon.”

2 comments

Update on Starship/Superheavy preparations at Boca Chica

Link here. After two separate but aborted dress rehearsal countdowns, the rocket has been destacked with Superheavy rolled back to the assembly building.

After two Wet Dress Rehearsal (WDR) aborts, SpaceX opted to destack Ship 28 before removing Booster 10 from the Orbital Launch Mount (OLM). The Booster has since rolled back to the Production Site, while Ship 28 conducted standalone testing on Pad B, opening with a Spin Prime test on Monday.

A March launch of Flight 3 for Starship is still possible, pending the completion of full stack testing and approval from the FAA.

While the aborts suggest some technical issues occurred that need addressing, the destacking and additional work could also be for other reasons. The FAA has still not issued a launch license, and is demanding certain actions before doing so. It could be that the company is being forced to make certain upgrades on these prototypes it would have rather left to the next test launch with more advanced prototypes.

Either way, it now appears that a March launch is possibly threatened.

3 comments

FAA announces it has rubber-stamped SpaceX’s investigation of the November Starship/Superheavy test launch

The FAA yesterday announced that it has completed its review of SpaceX’s investigation of the November Starship/Superheavy test launch and has approved the company’s conclusions.

The Federal Aviation Administration has concluded its review of SpaceX’s investigation of the second Starship launch in November, with the regulator saying Monday that it accepted the “root causes and 17 corrective actions” identified by the company.

While this means the investigation is now closed, SpaceX must implement all the corrective actions and apply for a modified launch license before it can fly Starship again. “The FAA is evaluating SpaceX’s license modification request and expects SpaceX to submit additional required information before a final determination can be made,” the regulator said in a statement Monday.

You can read a SpaceX update of its investigation here. As previously reported, when Starship vented the extra oxygen carried to better simulate a payload it caused “a combustion event” and fires that cut off communications.

This resulted in a commanded shut down of all six engines prior to completion of the ascent burn, followed by the Autonomous Flight Safety System detecting a mission rule violation and activating the flight termination system, leading to vehicle breakup. The flight test’s conclusion came when the spacecraft was as at an altitude of ~150 km and a velocity of ~24,000 km/h, becoming the first Starship to reach outer space.

Despite SpaceX’s report, which states the company “has implemented hardware changes” to prevent a reoccurance, the FAA has still not yet issued a launch license. Based on these updates and Elon Musk’s own prediction, it appears a license will be forthcoming in the next two weeks, matching my December prediction of a March launch. Expect SpaceX to quickly launch, as it has “more Starships ready to fly,” and it wants to fly them fast in order to refine the engineering so as to move to operational flights.

It is also possible that the FAA will continue to slow-walk its approvals, and SpaceX might be left hanging for more than two weeks. Had the government not been involved, all signs suggested that SpaceX would have done its third test flight in January, and would have now been gearing up for its fourth flight. That was the kind of pace SpaceX set when it was doing its first Starship test flights during the Trump administration. The government under Joe Biden’s presidency however is not allowing that kind of launch pace.

9 comments

Vast to compete with Axiom for NASA’s limited slots for commercial manned missions to ISS

The private space station company Vast, the only one presently building its own space station without a NASA contract, has now announced that it intends to to compete with Axiom for the limited docking slots NASA has made available for commercial manned tourist missions to ISS.

During a panel discussion at the Federal Aviation Administration Commercial Space Transportation Conference Feb. 21, Max Haot, chief executive of Vast, said his company would bid on the fifth and sixth private astronaut missions, or PAMs, that NASA offers to companies seeking to flying commercial missions to the ISS. “From our point of view, it will make us a better space station builder, a better partner of NASA, and it will help us practice a lot of the disciplines we are building” for its future commercial stations, he said of Vast’s plan to bid on the missions.

Up until now, Axiom has had no competition for those limited docking opportunities, has flown two missions, with a third planned for this fall. All it needed to do is negotiate the rental fees with NASA for using ISS. Now NASA will need to open up bidding for those slots. Its job is not to play favorites, but to instead make its taxpayer-funded facilities available to as many private companies as possible. Whether it will do so is at present unclear.

Vast’s own space station, a single module to be launched on SpaceX’s Starship/Superheavy, dubbed Haven-1, is scheduled for launch next year according to Vast officials. If so (assuming SpaceX’s rocket is operational by then), Vast will be the first private space station in orbit, beating Axiom and the two consortiums building Orbital Reef and Starlab. And it will have done it without taxpayer money.

3 comments

Update on SpaceX preparations for 3rd Superheavy/Starship orbital test launch

Link here. SpaceX is apparently now gearing up for a wet dress rehearsal countdown, whereby it performs a full countdown, including fueling both stages and taking everything to T-0. Such rehearsals are a standard procedure for all SpaceX launches.

Whether this launch will occur in early March, as Musk claimed yesterday, remains very uncertain, but not for technical reasons.

The FAA said that the mishap investigation for OFT-2 is still open, pending more information from SpaceX. The license modification requires all needed information to be submitted and reviewed, and the investigation needs to be closed before Starship returns to flight.

Apparently SpaceX has not yet completed its own investigation of the November second test launch. If so, this third launch might be delayed until April, since after the first test launch in April the FAA and Fish & Wildlife took three months after receiving SpaceX’s completed investigation report to approve it and issue a license. The FAA falsely claimed it was doing its own investigation, but the GAO has made it clear this is not so. All it does is rubber stamp the investigations of private companies.

We shall see. Some reports have said that no Fish & Wildlife approval will be required this time, which will speed things up. Others have indicated that the FAA is ready to move quicker. Even so, there remains the outstanding lawsuit by activists against the closing of nearby beaches for each launch. If those litigants demand a court injunction against such closures while the case is on-going, this launch could be delayed far longer.

3 comments

Musk: 3rd Starship/Superheavy test launch expected in early March

According to a tweet on X by Elon Musk, the third test flight of SpaceX’s heavy-lift Starship/Superheavy rocket is now expected in about three weeks, in early March.

The rocket is presently on the launchpad, undergoing final tests.

This confirms my December prediction that the launch would not happen earlier than March. SpaceX was ready to launch in January, but as I predicted red tape in the federal government have left the rocket sitting on the ground.

However, that prediction may have been too optimistic. First, SpaceX has still not gotten its launch license from the FAA, with no word from that agency when it will rubber-stamp SpaceX’s investigation into the second test launch in November. Second, the lawsuit by activists challenging the right of local authorities to close beaches at Boca Chica for launches remains active. It is very possible those activists will be successful in getting the court to issue an injunction preventing any beach closures (and thus launches) while the case is being litigated. If so, the next test launch could be months away.

7 comments

Texas state court rules in favor of activist lawsuit against SpaceX

The activists who sued SpaceX and local authorities, claiming the beach closures required during tests and launches at Boca Chica violate the Texas constitution, have had their lawsuit reinstated by a higher state court after a lower court had dismissed it.

Texas’ 13th district court of appeals ruled in favor of SaveRGV, the Sierra Club and the Carrizo/Comecrudo Nation of Texas in suits alleging that a 2013 state law allowing beach closures for space flight activities goes against the Open Beaches Amendment to the Texas Constitution.

In July 2022, Cameron County’s 445th District Court dismissed the coalition’s lawsuit, saying the organizations lacked standing in their complaint against Texas Land Commissioner Dr. Dawn Buckingham, the Texas Land Office, Cameron County and Texas Attorney General Ken Paxton.

The appeals court reversed that decision Thursday, allowing the lawsuit to proceed.

The lawsuit still must be litigated, so these activists have not yet won their case. However, this decision might prevent further beach closures while the case plays out in the courts, which would essentially shut down any further tests or launches at Boca Chica. If so, it will not matter if the FAA finally finishes its paperwork and approves a third test launch of Starship/Superheavy later this month. The launch will not be possible.

18 comments

Voyager signs SpaceX’s Starship to launch its Starlab space station

Voyager Space, one of three commercial space stations being built in partnership with NASA, has awarded SpaceX the launch contract for putting its Starlab space station into orbit, using that company’s Superheavy/Starship rocket.

The companies did not disclose terms of the agreement or a projected launch date, although a spokesperson for Starlab Space said the company was confident that Starlab would be launched before the decommissioning of the International Space Station, currently scheduled for 2030.

Voyager is building Starlab in a joint partnership with Airbus and Northrop Grumman. The design is relatively simple though large (one main module and a service module), which makes Starship an excellent method for getting it into orbit.

SpaceX now has deals to launch two different space stations using Starship. The second is with the private company Vast, which is building its station completely independent from NASA. Starship also has won launch contracts from two different private citizens, as well as NASA.

It appears that Musk’s instincts were right on the money when he decided to build this rocket, even though when he proposed it there did not seem to be any customers for it.

Hat tip to BtB’s stringer Jay.

5 comments

Pentagon in discussions with SpaceX about buying a Starship outright for military missions

The Pentagon is negotiating with SpaceX the idea that in certain cases where it deems it legally necessary it will buy outright full ownership of a SpaceX Starship/Superheavy launch rocket in order to fly some military missions.

The idea is similar to how the Air Force moves cargo. At times, the service contracts with private carriers to deliver cargo, but for certain critical missions it uses service “gray tail” aircraft. In this hypothetical case, the military could take a Starship off the line for a specific mission and return it to SpaceX after it is complete.

I suspect such situations involve very risky wartime missions that carry liabilities that a private company cannot accept. The military takes over ownership, relieving the company of risk, and then returns ownership afterward. Such a plan requires the company to agree to it, and the military to pay extra for these temporary rights. According to the article at the link, SpaceX is presently exploring its options.

That the Pentagon is discussing this with SpaceX at all tells us that it sees Starship/Superheavy as having a lot of value. It wants to buy its services, one way or the other.

10 comments

SpaceX files for permits to build a shopping center and restaurant at Boca Chica

SpaceX has now filed for permits to build both a shopping center and restaurant at Boca Chica, with construction beginning in March and completed by the end of the year.

The location proposed is on the beach only a short distance to the west of SpaceX’s Starship/Superheavy facilities. It will be located looking north not at the Gulf of Mexico but at South Bay, one of the large inlets that surround the spit of land where those facilities are located. It is also located on roads that might not close during launches, which means it might be an excellent location to attract tourists during launches, about six miles from the launch site itself.

4 comments
1 11 12 13 14 15 27