Breaking: Army Corp of Engineers suspends SpaceX’s Boca Chica permit process

We’re here to help you! According to this very short Bloomberg news report today, the Army Corp of Engineers has entirely suspended SpaceX’s Boca Chica permit process for expanding the facility.

The reason given is that SpaceX “failed to provide requested information.”

Though not yet confirmed, this permit appears to be separate from the environmental reassessment process being led by the FAA to approve Starship launches from Boca Chica. Instead, this appears to have an application to add an additional launchpad and other facilities to the site.

Assuming this distinction is true, then launches from Boca Chica of Starship might still be approved. The action however once again indicates the growing hostility to SpaceX within the federal bureaucracy, apparently aided and abetted by the Biden administration.

7 comments

China and Russia successfully launch satellites

Both China and Russia today successfully places satellites into orbit.

China used its Long March 4C rocket to place an Earth observation radar satellite into orbit. Russia in turn used its Soyuz-2 rocket to launch a military surveillance satellite. As both launched from interior spaceports, both dumped first stages and boosters on their respective countries.

The leaders in the 2022 launch race:

12 SpaceX
9 China
5 Russia
2 ULA
2 Rocket Lab

The U.S. still leads China 19 to 9 in the national rankings.

2 comments

Curiosity’s upcoming rough terrain

Curiosity's view looking west on April 5, 2022 (Sol 3435)Click for high resolution. For original images go here, here, here, and here.

Overview map
Click for interactive map.

Cool image time! The panorama above, created by me from four photos taken by Curiosity’s right navigation camera on April 5, 2022, reveal much about the alien world of Mars that the rover is exploring. The red dotted line indicates approximately the rover’s upcoming route.

First there is the rough surface of the Greenheugh Pediment, the sloping plateau that Curiosity is presently traversing. Called “gater-back terrain” by the science team, this broken surface apparently is sandstone that was originally a dune field that in the past was periodically washed by water runoff and later hardened into this structurally weak rock.

Second, I have orientated the images so that the rim of Gale Crater, approximately 25 miles away, is horizontal. By doing so, we can see the upward slope of the Greenheugh Pediment. Curiosity is on a tilted surface, and while it will be traversing along a contour line as it heads west towards Gediz Vallis Ridge about 1,000 feet away, when it turns left and heads uphill, the climb will be steady and steep, as it has now been for the past year since the rover entered the mountains at the foot of Mount Sharp.

Taken together, these details indicate why Curiosity has moved very slowly in recent weeks, as shown by the white dots in the overview map to the right. The blue dot marks Curiosity’s present location, with the yellow lines indicate the approximate view in the panorama above.

Traversing the pediment carries real risk to the rover. Though its somewhat dinged wheels have held up well during this last year of traveling in these rough mountains, at any point the severe roughness here could damage one or more wheels significantly, even putting one or more out of commission. The rover team is traveling carefully to avoid this, but these factors illustrate a possible end for the rover, though hopefully still years away.

0 comments

Inspector General: NASA’s lunar rover VIPER mission on schedule, with some cost increases

VIPER's planned route on the Moon

According to a report [pdf] issued today by NASA’s inspector general, the agency’s VIPER lunar rover mission is generally on schedule for its ’23 launch, though it has experienced some cost increases and still carries some scheduling risks, mostly related to the development of Astrobotic’s commercial Griffin lunar lander, and its precursor Peregrine mission that ULA hopes to launch on its first Vulcan rocket test.

Although Astrobotic personnel explained that Griffin’s development schedule is largely independent of its Peregrine mission, the Peregrine Lander—planned to launch in 2022—has multiple systems and subsystems that will also be used on Griffin. Therefore, any technical problems with these systems may adversely affect development of the Griffin Lander because Astrobotic would only have about a year, depending on the Peregrine launch date and start of lunar operations, to resolve the issues prior to NASA delivering VIPER for integration and launch. Furthermore, any failures during the Peregrine mission may lead to Griffin delays as NASA and Astrobotic investigate the failures and develop corrective actions.

In addition, VIPER long-lead acquisitions—such as the rover solar power array and avionics unit—have been affected by aerospace industry supply chain delays caused by COVID-19 as have delivery of computer boards and motor parts. Both of these issues have impacted design verification testing needed for the mission’s Critical Design Review, while COVID-19 also delayed some component development schedules.

Peregrine’s launch has been delayed by a year because Vulcan has been delayed because of Blue Origin’s problems with the BE-4 rocket engine. Though ULA hopes the Vulcan/Peregrine launch can occur late this year, that date remains very much in doubt. Further launch delays would thus threaten the launch of Griffin and VIPER.

As for the cost increases, the IG found that NASA had been forced to increase the budget for VIPER by 18.1%, a relatively minor increase compared to many of NASA’s other big projects. The IG noted however that further cost overruns are very possible, especially if the Peregrine mission experiences problems.

The photo above shows the rover’s presently planned route in the relatively flat area about 85 miles from the Moon’s south pole and near the western edge of Nobile Crater (pronounced No-BEEL-e).

1 comment

Europe to put instrument on Japanese rover being launched and landed on the Moon by India

The new colonial movement: The European Space Agency (ESA) has signed an agreement with Japan’s space agency JAXA to put a science instrument on a Japanese rover that will be launched by India to the Moon and landed there on an Indian lander.

Under the deal, ESA would provide instruments for the Japanese rover, which would be used in the exploration of the Moon’s south pole under the mission targeted for 2024. … The lunar endeavour between the Indian Space Research Organisation (ISRO) and JAXA is called the Lunar Polar Exploration Mission (LUPEX) which aims to launch an Indian lander and a Japanese rover to the Moon.

In the next three years a lot of landers and rovers are planning to land on the Moon, most built by private American companies flying NASA and private payloads, but also joined by probes being sent by Russia, China, and now this Japanese-Indian-European mission. Even if only half succeed, the exploration of the lunar surface will still be quite busy.

0 comments

Ukrainian rocket development for Nova Scotia spaceport unhindered by war

Capitalism in space: The development of a Ukrainian rocket dubbed Cyclone 4M for of any satellite customers who choose to launch from a planned Nova Scotia spaceport has not been delayed by the Ukraine war.

“Everything is stable with respect to our team in Ukraine,” said Steve Matier, president of Maritime Launch Services. “The facility there is fine, the staff is fine and at work. . . . We’re continuing to finance their development of the launch vehicle.”

The Cyclone 4M rocket Maritime Launch Services plans to use is designed and built by Ukrainian state corporations Yuzhnoye and Yuzhmash in Dnipro. Known as Space City, Dnipro is located in central Ukraine. The city of about a million people was shelled in mid-March by Russian forces and the airport runways and terminal were hit by missile strikes, according to Ukrainian government statements.

This story illustrates the strong possibility that the recent success the Ukraine has had on the battlefield has served to prevented any serious long term damage to its aerospace industry and its partners in the west. Those partnerships if anything look stronger, with the work in the Ukraine apparently able to continue as planned, with only slight delays.

1 comment

Commercial Orbital Reef space station passes NASA’s design review

Proposed Orbital Reef space station

Capitalism in space: A proposed commercial space station dubbed Orbital Reef and being built by a partnership led by Sierra Space and Blue Origin has passed its NASA’s design review, allowing for construction to now begin.

The review, conducted as part of a $130 million development contract from NASA, found no issues with the station’s design.

This commercial partnership also includes Boeing, Redwire, Mitsubishi, Genesis Engineering, and Arizona State University, and plans its launch before 2030 when ISS will be retired. This quote from the article I think is important:

“We’re going as fast as we can,” Steve Lindsey, chief strategy officer at Sierra Space, said during a panel at the Goddard Memorial Symposium March 25. “We don’t want to have a gap like we did with crew back in the last decade.”

Three other private space stations are also under construction or being planned, all hoping to be operational prior to ’30. If even two of these launch, the 2030s will be very exciting indeed.

5 comments

Rocket Lab to attempt 1st stage recovery by helicopter on next launch

Capitalism in space: Rocket Lab will attempt during its next launch later this month to become the second commercial rocket company, after SpaceX, to successfully recover a first stage for reuse.

The company will use a customized Sikorsky S-92 helicopter to rendezvous with the stage as it descends slowly using parachutes and capture it. The helicopter will then fly it back to land and safely deposit it on the ground.

This launch is now scheduled for April 19th, at the earliest.

2 comments

NASA postpones next SLS dress rehearsal countdown attempt to next week

NASA officials today said that they have postponed their next attempt to complete the first dress rehearsal countdown of the SLS unitl next week, thus allowing the private commercial manned Axiom launch to ISS to proceed on April 8th.

The rocket will remain at the launch site as the engineering teams assess the issues that caused two scrubs and several launch count down holds.

2 comments

Ingenuity completes its 24th flight on Mars

Overview map
Click for interactive map.

Ingenuity today completed its 24th flight on Mars, traveling a short 33 feet for 69.5 seconds in order to place it in a good position for an upcoming record-setting 25th flight.

With Flight 24 in our log book, it is now time to look forward to our upcoming effort that charts a course out of Séítah. Flight 25 – which was uplinked yesterday – will send Ingenuity 704 meters to the northwest (almost 80 meters longer than the current record – Flight 9). The helicopter’s ground speed will be about 5.5 meters per second (another record) and we expect to be in the rarefied Martian air for about 161.5 seconds.

The red dot on the map to the right indicates Perseverance’s present position. The green dot shows where Ingenuity landed today. The tan dashed lines indicate the planned routes for both. Ingenuity’s next flight will take it out of the rough terrain of Seitah and much closer to Three Forks.

0 comments

Looking down into a Jupiter hurricane

Looking down into a Jupiter hurricane
Click for full image.

Cool image time! The photo to the right, cropped and reduced to post here, was created by citizen scientists Kevin Gill and Navaneeth Krishnan from a raw image taken by Juno during its 40th close fly-by of Jupiter in February 2022.

I don’t have a scale, but I would guess that this storm is at least a thousand miles across. The depth is harder to measure, but we looking down into a deep whirlpool for sure.

To bring out the details Gill and Krishnan enhanced the colors significantly. The original is quite bland in comparison, with this storm being the faint dark spot just below the center near the photo’s left edge.

10 comments

UAE wants to prioritize private enterprise for its space effort

Capitalism in space: According to officials of the United Arab Emirates (UAE) space agency, that nation is working to encourage the growth of a private space industry, funded initially using government money, in its effort to become a major world player in space.

“We’ve spent well over Dh1.5 billion ($408 million) on building capacity within the space industry over the last eight years and we’re more than doubling that over the next decade.”

Laws and regulations, including permits, which would allow interested companies to set up base in the UAE, are already available through a space law passed in 2019.

Companies would also have access to funding from a new initiative launched by the space agency, called Space Analytics and Solutions, which has a budget of Dh20 million. The programme aims to help start-ups build space-based applications that focus on food security, climate change, infrastructure and the oil and gas industry.

The space agency hopes that as these companies progress, they would become less reliant on government funding.

While the UAE’s Al-Amal Mars orbiter was mostly built and launched by foreign companies, it hopes its next major mission, to send an unmanned probe to seven asteroids, will be built almost entirely by companies run by UAE citizens, something they claim they have achieved with an upcoming smallsat Earth observation satellite.

The article also mentioned as an aside that the UAE has ended its 2019 agreement with Virgin Galactic to allow it to launch from the UAE. Instead, it is negotiating with Blue Origin “to set up spaceports.”

0 comments
1 463 464 465 466 467 1,353